Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
SIGNAL TRANSMITTING AND RECEIVING METHOD IN WIRELESS COMMUNICATION SYSTEM
Document Type and Number:
WIPO Patent Application WO/2021/010708
Kind Code:
A1
Abstract:
An embodiment relates to a method for performing an operation for a first terminal in a wireless communication system, the method comprising the steps of: performing, by the first terminal, radio link monitoring of a second terminal; detecting a radio link failure (RLF) on the basis of the radio link monitoring; and after detecting the RLF, transmitting a signal to the second terminal, wherein the first terminal transmits, to a base station on the basis of the detection of the RLF, a sidelink measurement report including a measurement value of a radio link with the second terminal, and the signal is transmitted by applying a transmission parameter reconfigured on the basis of the sidelink measurement report.

Inventors:
PARK GIWON (KR)
LEE YOUNGDAE (KR)
SEO HANBYUL (KR)
LEE JONGYOUL (KR)
Application Number:
PCT/KR2020/009197
Publication Date:
January 21, 2021
Filing Date:
July 13, 2020
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
LG ELECTRONICS INC (KR)
International Classes:
H04W76/18; H04W4/40; H04W24/10; H04W52/26; H04W72/02; H04W76/14; H04W76/19; H04W92/18
Foreign References:
US20170280486A12017-09-28
Other References:
SAMSUNG, FIRSTNET: "On Sidelink RLM", 3GPP DRAFT; R1-1904430, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Xi’an, China; 20190408 - 20190412, R1-1904430, 3 April 2019 (2019-04-03), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051707213
HUAWEI, HISILICON: "Sidelink physical layer procedures for NR V2X", 3GPP DRAFT; R1-1903944, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, R1-1903944, 12 April 2019 (2019-04-12), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, pages 1 - 17, XP051707059
CATT: "RLM / RLF declaration in NR V2X Sidelink", 3GPP DRAFT; R2-1903179, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Xi’an, China; 20190408 - 20190412, R2-1903179, 29 March 2019 (2019-03-29), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051692456
LG ELECTRONICS: "Discussion on transmitter UE side RLM and RLF in NR SL", 3GPP DRAFT; R2-1904223_DISCUSSION ON TRANSMITTER UE SIDE RLM AND RLF IN NR SL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Xian, China; 20190408 - 20190412, R2-1904223_Discussion on transmitter UE side RLM a, 29 March 2019 (2019-03-29), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051693451
Attorney, Agent or Firm:
KBK & ASSOCIATES (KR)
Download PDF: