Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
STEAM TURBINE INSTALLATION AND METHOD FOR OPERATING THE STEAM TURBINE INSTALLATION
Document Type and Number:
WIPO Patent Application WO/2013/007462
Kind Code:
A3
Abstract:
The invention relates to a steam turbine installation that has a steam turbine (5), a steam generator (2) and a feed water pre-heating unit (9-13, 17-21) operated by process steam, the steam turbine (5) having an overload bypass line (14) with which main steam can be fed to the feed water pre-heating unit (9-13, 17-21) between the steam turbine input and the extraction point (9) during overload operation of the steam turbine (5), characterised in that the feed water pre-heating unit (9-13, 17-21) has an auxiliary extraction line (17) that is connected to the overload bypass line (14) in such a way that process steam can be extracted from the steam turbine (5) during partial load operation of the steam turbine (5) and added to the feed water pre-heating unit (9-13, 17-21) for the additional pre-heating of feed water.

Inventors:
WECHSUNG MICHAEL (DE)
GRAEBER CARSTEN (DE)
LOEPER THOMAS (DE)
Application Number:
PCT/EP2012/061251
Publication Date:
August 22, 2013
Filing Date:
June 14, 2012
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
SIEMENS AG (DE)
WECHSUNG MICHAEL (DE)
GRAEBER CARSTEN (DE)
LOEPER THOMAS (DE)
International Classes:
F01K7/40; F01K13/02; F22D1/32
Foreign References:
JPS59110811A1984-06-26
EP1241323A12002-09-18
NL6817712A1970-03-13
DE10042317A12002-03-14
DE4447044C11996-04-11
JPH0783006A1995-03-28
Download PDF: