Title:
A SYSTEM FOR EXTENDED EARNED VALUE MANAGEMENT BASED ON BILLS OF QUANTITIES
Document Type and Number:
WIPO Patent Application WO/2018/147474
Kind Code:
A1
Abstract:
To enhance the accuracy and reliability in evaluating performances of work elements, extended earned value management (EEVM) integrates bills of quantities (BOQ) introducing a fourth component to the analytics of standard EVM, earned value based on BOQ items. Provided is a computerized system for EEVM, comprising EEVM method and EEVM process which are designed to be applied to any real project, wherein, following EEVM process, the work breakdown structure of a project is organized, works packages are planned, BOQ items receive their cost in various ways, performances are periodically evaluated incorporating any change, and wherein special devices of EEVM method are applied throughout the process.
More Like This:
Inventors:
HONG LIMPYO (KR)
Application Number:
PCT/KR2017/001323
Publication Date:
August 16, 2018
Filing Date:
February 07, 2017
Export Citation:
Assignee:
HONG LIMPYO (KR)
International Classes:
G06Q10/06
Foreign References:
US20120253876A1 | 2012-10-04 | |||
US20110131139A1 | 2011-06-02 | |||
US20050222881A1 | 2005-10-06 | |||
US20110112883A1 | 2011-05-12 |
Download PDF:
Previous Patent: THREE-DIMENSIONAL OBJECT INFORMATION MEASURING DEVICE
Next Patent: HEALTH TOUR SYSTEM AND CONTROL METHOD THEREFOR
Next Patent: HEALTH TOUR SYSTEM AND CONTROL METHOD THEREFOR