Abstract:
Systems, apparatus and methods for quantifying and identifying diversion of electrical energy are provided. Bypass and tap diversions may be identified in an electric utility power distribution inventory zone having both bypass and tap diversions. Bypass diversion factors for consumer nodes in an inventory zone are determined by finding a solution to a system of load balance equations having slack variables representing aggregate tap loads for the inventory zone and in which consumer load profile data is scaled by the bypass diversion factors, which solution minimizes an objective function whose value is positively related to the sum of the slack variables representing the aggregate tap loads. Tap loads are correlated with nodes in an inventory zone by solving a first system of power flow equations not having variables representing tap loads, and then solving a second system of power flow equations having variables representing tap loads using an iterative numerical solution technique initialized based on the solution to the first system of power flow equations.

Inventors:
HUGHES MICHAEL BRENT (CA)
Application Number:
PCT/CA2012/050889
Publication Date:
June 20, 2013
Filing Date:
December 11, 2012
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
MBH CONSULTING LTD (CA)
International Classes:
H02J13/00; G06Q50/06
Foreign References:
US7135956B22006-11-14
US6633823B22003-10-14
US20090093916A12009-04-09
US20100306027A12010-12-02
US4419666A1983-12-06
Other References:
KADUREK; PETR ET AL.: "Theft detection and smart metering practices and expectations in the Netherlands", INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT EUROPE), 2010 IEEE PES. IEEE, 2010
See also references of EP 2792048A4
Attorney, Agent or Firm:
JOHNSON, Richard A. et al. (1200 Waterfront Centre200 Burrard Street, PO Box, Vancouver British Columbia V7X 1T2, CA)
Download PDF:
Claims:
WHAT IS CLAIMED IS:

1. A method for characterizing non-technical losses in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least two metered consumer nodes, the method comprising:

obtaining inventory zone load profile data;

obtaining consumer load profile data for the consumer nodes; and

determining bypass diversion factors for the consumer nodes and aggregate tap loads for the inventory zone that:

solve a system of load balance equations for the inventory zone having known values corresponding to the inventory zone load profile data and to the consumer load profile data and having slack variables representing the aggregate tap loads, in which the known values corresponding to the consumer load profile data are scaled by the bypass diversion factors; and

minimize an objective function whose value is positively related to the sum of the slack variables representing the aggregate tap loads.

2. The method of claim 1 comprising constraining the variables in the system of load balance equations corresponding to the bypass diversion factors to be greater than a predetermined threshold value.

3. The method of claim 2 wherein the threshold value is less than 1. 4. The method of claim 3 wherein the threshold value is at least 0.98.

5. The method of any one of claims 1 to 4 wherein the variables in the system of load balance equations corresponding to the aggregate tap loads are constrained to be at least zero.

6. The method of any one of claims 1 to 5 wherein determining the bypass diversion factors and the aggregate tap loads comprises applying a Simplex solution method.

7. The method of any one of claims 1 to 6 wherein obtaining inventory zone load profile data and obtaining consumer load profile data comprises obtaining interval data for a plurality of intervals that span a time period including a tap load transition. 8. The method of any one of claims 1 to 7 comprising obtaining consumer load profile data for at least one metered consumer node having unknown connectivity to the inventory zone, including the consumer load profile data for the at least one metered consumer node having unknown connectivity to the inventory zone in the load balance equations, and determining a connectivity of the at least one metered consumer node having unknown connectivity to the inventory zone based on the bypass diversion factor for the at least one metered consumer node having unknown connectivity to the inventory zone, wherein a bypass diversion factor of 0 indicates that the at least one metered consumer node having unknown connectivity to the inventory zone is not connected to the inventory zone. 9. The method of any one of claims 1 to 8 comprising constraining the variables in the system of load balance equations to exclude values between 1 and about 2.

10. The method of any one of claims 1 to 9 comprising:

obtaining an admittance matrix modeling the electrical admittance between the nodes of the inventory zone;

obtaining substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone;

obtaining substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone;

determining a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node; and determining real and reactive tap loads corresponding to select ones of the consumer nodes that:

solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and

minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads

using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations.

1 1. The method of claim 10 wherein obtaining the substantially simultaneous

instantaneous real and reactive load data for the consumer nodes comprises obtaining at least one measurement corresponding to one of the consumer nodes and multiplying the at least one measurement by corresponding ones of the bypass diversion factors.

12. The method of claim 10 or claim 1 1 wherein the select ones of the consumer nodes comprise all of the consumer nodes in the inventory zone.

13. The method of claim 10 or claim 1 1 wherein at least one of the consumer nodes in the inventory zone is not one of the select ones of the consumer nodes.

14. The method of any one of claims 10 to 13 wherein in the first system of power flow equations variables corresponding to the voltage magnitudes of the consumer nodes are initialized to values corresponding to the instantaneous voltage magnitude data obtained for the distribution node.

15. The method of any one of claims 10 to 14 wherein in the first system of power flow equations a term corresponding to a voltage magnitude of the distribution node is fixed to equal a value corresponding to the instantaneous voltage magnitude data obtained for the distribution node.

16. The method of any one of claims 10 to 15 wherein in the first system of power flow equations a term corresponding to a voltage phase angle of the distribution node is fixed to equal zero. 17. The method of any one of claims 10 to 16 wherein in the second system of power flow equations a term corresponding to a voltage phase angle of the distribution node is fixed to equal zero.

18. The method of any one of claims 10 to 17 wherein in the second system of power flow equations variables corresponding to the real and reactive tap loads of a consumer node are further constrained by a pre-determined relationship with one another.

19. The method of claim 18 wherein the pre-determined relationship comprises a linear relationship.

20. The method of claim 18 wherein the pre-determined relationship specifies that the reactive tap load is equal to the product of the real tap load and a scale factor.

21. The method of claim 20 wherein the scale factor is less than or equal to 0.2.

22. The method of claim 20 comprising determining the scale factor by:

determining a real component of aggregate tap power based on a difference between a real power value for the distribution node that solves the first system of power flow equations and a real power value for the distribution node corresponding to the obtained instantaneous real load data for the distribution node;

determining a reactive component of aggregate tap power based on a difference between a reactive power value for the distribution node that solves the first system of power flow equations and a reactive power value for the distribution node corresponding to the obtained instantaneous reactive load data for the distribution node; and

determining the scale factor as an aggregate tap power factor based on the real and reactive components of aggregate tap power.

23. The method of any one of claims 10 to 22 wherein the inventory zone comprises one or more unmetered nodes, and wherein in the first system of power flow equations voltage magnitude and phase angles for the unmetered nodes are treated as unknowns and wherein real and reactive power for the unmetered nodes are fixed to arbitrary values. 24. The method of claim 23 wherein in the second system of power flow equations voltage magnitude and tap affected phase angles for the unmetered nodes are treated as unknowns.

25. The method of any one of claims 10 to 24 wherein the inventory zone comprises two or more secondary distribution nodes to which metered consumer nodes are connected, comprising, when the iterative numerical solution technique fails to converge:

for each secondary distribution node:

determining calculated complex consumer voltages and real and reactive secondary tap loads corresponding to that secondary node that solve a third system of power flow equations for the inventory zone which allow for a secondary tap at that secondary distribution node having fixed values corresponding to the real and reactive tap loads determined for the consumer nodes, and having slack variables representing calculated consumer voltages and real and reactive secondary tap loads, and minimize an objective function whose value is positively related to at least one of the slack variables representing the calculated consumer voltages and real and reactive secondary tap loads using an iterative numerical solution technique; and,

when the iterative numerical solution technique converges to a solution, storing calculated voltage magnitudes corresponding to the calculated complex consumer voltages in a data structure indexed by secondary distribution node,

determining a voltage difference between each of the voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure indexed by secondary distribution node and the voltage magnitude values corresponding to the voltage data for each of the metered consumer nodes;

identifying each voltage difference which exceeds a rated measurement error of the corresponding meter as a voltage violation;

determining a voltage difference range for each secondary distribution node having voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure; and

determining a secondary tap location based on the voltage difference range and number voltage violations for each secondary distribution node.

26. The method of claim 25 wherein determining the secondary tap location comprises identifying the secondary distribution node whose voltage difference is less than twice the rated measurement error and having the fewest voltage violations as the secondary tap location.

27. The method of claim 26 wherein determining the secondary tap location comprises identifying two secondary distribution nodes whose voltage differences are less than twice the rated measurement error and having relatively low numbers of voltage violations, and determining the secondary tap location to be between the identified two secondary distribution nodes.

28. The method of claim 27 comprising determining a cumulative voltage difference for each of the identified two secondary distribution nodes and further narrowing the secondary tap location based on a relation between the cumulative voltage differences.

29. A system for characterizing non-technical losses in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least two metered consumer nodes, the system comprising: a data store comprising a non-transitory computer readable medium containing inventory zone load profile data and consumer load profile data for each of the consumer nodes; and

a data processor communicatively coupled to the data store and configured to:

obtain the inventory zone load profile data from the data store;

obtain the consumer load profile data for each of the consumer nodes from the data store;

determine bypass diversion factors for the consumer nodes and aggregate tap loads for the inventory zone that:

solve a system of load balance equations for the inventory zone having known values corresponding to the inventory zone load profile data and to the consumer load profile data and having slack variables representing the aggregate tap loads, in which the known values corresponding to the consumer load profile data are scaled by the bypass diversion factors; and

minimize an objective function whose value is positively related to the sum of the slack variables representing the aggregate tap loads; and

generate a record in a non-transitory medium indicating the

determined bypass diversion factors and aggregate tap loads.

30. The system of claim 29 wherein the data processor is configured to constrain the variables in the system of load balance equations corresponding to the bypass diversion factors to be greater than a pre-determined threshold value.

31. The system of claim 30 wherein the threshold value is less than 1. 32. The system of claim 12 wherein the threshold value is at least 0.98.

33. The system of any one of claims 29 to 32 wherein the data processor is configured to constrain the variables in the system of load balance equations corresponding to the aggregate tap loads to be at least zero.

34. The system of any one of claims 29 to 33 wherein the data processor is configured to determine the bypass diversion factors and the aggregate tap loads by applying a Simplex solution method. 35. The system of any one of claims 29 to 34 wherein the data processor is configured to obtain inventory zone load profile data and obtain consumer load profile data by obtaining interval data for a plurality of intervals that span a time period including a tap load transition.

36. The system of any one of claims 29 to 35 wherein the data processor is configured to obtain consumer load profile data for at least one metered consumer node having unknown connectivity to the inventory zone, including the consumer load profile data for the at least one metered consumer node having unknown connectivity to the inventory zone in the load balance equations, and determine a connectivity of the at least one metered consumer node having unknown connectivity to the inventory zone based on the bypass diversion factor for the at least one metered consumer node having unknown connectivity to the inventory zone, wherein a bypass diversion factor of 0 indicates that the at least one metered consumer node having unknown connectivity to the inventory zone is not connected to the inventory zone.

37. The system of any one of claims 29 to 36 wherein the data processor is configured to constrain the variables in the system of load balance equations to exclude values between 1 and about 2.

38. The system of any one of claims 29 to 37 wherein the data store contains an admittance matrix modeling the electrical admittance between the nodes of the inventory zone, substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone, and substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone, and the data processor is configured to:

obtain the admittance matrix from the data store;

obtain the substantially simultaneous instantaneous real and reactive load data from the data store;

obtain the substantially simultaneous instantaneous voltage magnitude data from the data store;

determine a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node;

determine real and reactive tap loads corresponding to select ones of the consumer nodes that:

solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and

minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations; and

generate a record in a non-transitory medium indicating the determined real and reactive tap loads corresponding to the select ones of the consumer nodes.

39. The system of claim 38 wherein the data processor is configured to obtain the substantially simultaneous instantaneous real and reactive load data for the consumer nodes by obtaining at least one measurement corresponding to one of the consumer nodes and multiplying the at least one measurement by corresponding ones of the bypass diversion factors. 40. The system of claim 38 or 39 wherein the inventory zone comprises two or more secondary distribution nodes to which metered consumer nodes are connected, and wherein the data processor is configured to, when the iterative numerical solution technique fails to converge:

for each secondary distribution node:

determine calculated complex consumer voltages and real and reactive secondary tap loads corresponding to that secondary node that solve a third system of power flow equations for the inventory zone which allow for a secondary tap at that secondary distribution node having fixed values corresponding to the real and reactive tap loads determined for the consumer nodes, and having slack variables representing calculated consumer voltages and real and reactive secondary tap loads, and minimize an objective function whose value is positively related to at least one of the slack variables representing the calculated consumer voltages and real and reactive secondary tap loads using an iterative numerical solution technique; and,

when the iterative numerical solution technique converges to a solution, storing calculated voltage magnitudes corresponding to the calculated complex consumer voltages in a data structure indexed by secondary distribution node,

determine a voltage difference between each of the voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure indexed by secondary distribution node and the voltage magnitude values corresponding to the voltage data for each of the metered consumer nodes;

identifying each voltage difference which exceeds a rated measurement error of the corresponding meter as a voltage violation;

determine a voltage difference range for each secondary distribution node having voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure; and

determine a secondary tap location based on the voltage difference range and number voltage violations for each secondary distribution node.

41. A method for identifying tap loads in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including a metered distribution node and at least two metered consumer nodes, the method comprising:

obtaining an admittance matrix modeling the electrical admittance between the nodes of the inventory zone;

obtaining substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone;

obtaining substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone;

determining a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node; and

determining real and reactive tap loads corresponding to select ones of the consumer nodes that: solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and

minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads

using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations.

42. The method of claim 41 wherein the select ones of the consumer nodes comprise all of the consumer nodes in the inventory zone.

43. The method of claim 41 wherein at least one of the consumer nodes in the inventory zone is not one of the select ones of the consumer nodes.

44. The method of any one of claims 41 to 43 wherein in the first system of power flow equations variables corresponding to the voltage magnitudes of the consumer nodes are initialized to values corresponding to the instantaneous voltage magnitude data obtained for the distribution node.

45. The method of any one of claims 41 to 44 wherein in the first system of power flow equations a term corresponding to a voltage magnitude of the distribution node is fixed to equal a value corresponding to the instantaneous voltage magnitude data obtained for the distribution node.

46. The method of any one of claims 41 to 45 wherein in the first system of power flow equations a term corresponding to a voltage phase angle of the distribution node is fixed to equal zero.

47. The method of any one of claims 41 to 46 wherein in the second system of power flow equations a term corresponding to a voltage phase angle of the distribution node is fixed to equal zero.

48. The method of any one of claims 41 to 47 wherein in the second system of power flow equations variables corresponding to the real and reactive tap loads of a consumer node are further constrained by a pre-determined relationship with one another. 49. The method of claim 48 wherein the pre-determined relationship comprises a linear relationship.

50. The method of claim 48 wherein the pre-determined relationship specifies that the reactive tap load is equal to the product of the real tap load and a scale factor.

51. The method of claim 50 wherein the scale factor is less than or equal to 0.2.

52. The method of claim 50 comprising determining the scale factor by:

determining a real component of aggregate tap power based on a difference between a real power value for the distribution node that solves the first system of power flow equations and a real power value for the distribution node corresponding to the obtained instantaneous real load data for the distribution node;

determining a reactive component of aggregate tap power based on a difference between a reactive power value for the distribution node that solves the first system of power flow equations and a reactive power value for the distribution node corresponding to the obtained instantaneous reactive load data for the distribution node; and

determining the scale factor as an aggregate tap power factor based on the real and reactive components of aggregate tap power. 53. The method of any one of claims 41 to 52 wherein the inventory zone comprises one or more unmetered nodes, and wherein in the first system of power flow equations voltage magnitude and phase angles for the unmetered nodes are treated as unknowns and wherein real and reactive power for the unmetered nodes are fixed to arbitrary values.

54. The method of claim 53 wherein in the second system of power flow equations voltage magnitude and tap affected phase angles for the unmetered nodes are treated as unknowns.

55. The method of any one of claims 41 to 54 wherein the inventory zone comprises two or more secondary distribution nodes to which metered consumer nodes are connected, comprising, when the iterative numerical solution technique fails to converge:

for each secondary distribution node:

determining calculated complex consumer voltages and real and reactive secondary tap loads corresponding to that secondary node that solve a third system of power flow equations for the inventory zone which allow for a secondary tap at that secondary distribution node having fixed values corresponding to the real and reactive tap loads determined for the consumer nodes, and having slack variables representing calculated consumer voltages and real and reactive secondary tap loads, and minimize an objective function whose value is positively related to at least one of the slack variables representing the calculated consumer voltages and real and reactive secondary tap loads using an iterative numerical solution technique; and, when the iterative numerical solution technique converges to a solution, storing calculated voltage magnitudes corresponding to the calculated complex consumer voltages in a data structure indexed by secondary distribution node,

determining a voltage difference between each of the voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure indexed by secondary distribution node and the voltage magnitude values corresponding to the voltage data for each of the metered consumer nodes;

identifying each voltage difference which exceeds a rated measurement error of the corresponding meter as a voltage violation;

determining a voltage difference range for each secondary distribution node having voltage magnitudes corresponding to the calculated complex consumer voltages stored in the data structure; and

determining a secondary tap location based on the voltage difference range and number voltage violations for each secondary distribution node.

56. The method of claim 55 wherein determining the secondary tap location comprises identifying the secondary distribution node whose voltage difference is less than twice the rated measurement error and having the fewest voltage violations as the secondary tap location.

57. The method of claim 56 wherein determining the secondary tap location comprises identifying two secondary distribution nodes whose voltage differences are less than twice the rated measurement error and having relatively low numbers of voltage violations, and determining the secondary tap location to be between the identified two secondary distribution nodes.

58. The method of claim 57 comprising determining a cumulative voltage difference for each of the identified two secondary distribution nodes and further narrowing the secondary tap location based on a relation between the cumulative voltage differences.

59. The method of any one of claims 41 to 58 wherein obtaining the substantially simultaneous instantaneous real and reactive load data for the consumer nodes comprises obtaining at least one measurement corresponding to one of the consumer nodes and multiplying the measurement by a bypass diversion factor corresponding to that consumer node.

60. A system for identifying tap loads in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least two metered consumer nodes, the system comprising:

a data store comprising a non-transitory computer readable medium of the data store contains an admittance matrix modeling the electrical admittance between the nodes of the inventory zone, substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone, and substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone; and

a data processor communicatively coupled to the data store and configured to: obtain the admittance matrix from the data store;

obtain the substantially simultaneous instantaneous real and reactive load data from the data store;

obtain the substantially simultaneous instantaneous voltage magnitude data from the data store;

determine a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node;

determine real and reactive tap loads corresponding to select ones of the consumer nodes that:

solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and

minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations; and

generate a record in a non-transitory medium indicating the determined real and reactive tap loads corresponding to the select ones of the consumer nodes.

Description:
SYSTEMS. APPARATUS AND METHODS FOR QUANTIFYING AND IDENTIFYING

DIVERSION OF ELECTRICAL ENERGY

CROSS REFERENCE TO RELATED APPLICATIONS

[0001] This application claims the benefit of priority of U.S. Provisional Patent

Application No. 61/569,684 filed on December 12, 2011 , U.S. Patent Application No.

13/681 ,314 filed on November 19, 2012 and U.S. Patent Application No. 13/681 ,321 filed on November 19, 2012, all of which are incorporated herein by reference in their entirety. TECHNICAL FIELD

[0002] The invention relates to quantifying and identifying sources of diversion of electric energy in electric utility power distribution systems. Particular embodiments provide method and apparatus for identifying sources of diversion of electric energy in electric utility power distribution systems containing both tap and by-pass diversions.

BACKGROUND

[0003] Electric utility energy distribution systems are used to distribute electric energy from electric power generation plants to electric energy consumers. Figure 1 is a schematic diagram of part of an example electric energy distribution system 10. A high voltage primary distribution line 12 provides electric energy to a distribution transformer 14. Distribution transformer 14 is connected to a lower voltage secondary distribution line 16, and steps down the voltage of primary line 12 to the voltage of secondary distribution line 16.

Secondary distribution line 16 is connected to a plurality of branches 18A, 18B, and 18C corresponding to different energy consumers 20A, 20B and 20C. The consumption of energy by consumers 20A, 20B and 20C is metered by consumer meters 22A, 22B and 22C provided on branches 18A, 18B and 18C, respectively.

[0004] An unfortunate reality of electric utility energy distribution is that electric energy is sometimes unlawfully diverted to avoid metering. The unlawful diversion of electric energy is sometimes referred to in the electric energy industry as electricity theft or non- technical losses. Two common forms of electric energy diversion are bypasses and taps.

[0005] In Figure 1 , a bypass 24 provides an electrical path in parallel to meter 22B, such that a portion of the energy consumed by consumer 20B bypasses meter 22B so as not to be accounted for in meter 22B's measurement of electric energy consumption. Because bypass 24 is connected at either side of meter 22B, the amount of electric energy diverted through bypass 24 is related to the amount of electric energy delivered through meter 22B.

[0006] Figure 1 also shows a distribution tap 26. Distribution tap 26 provides an additional electrical path from branch 18C to consumer 20C (e.g., to a separate panel) or to another consumer. Because distribution tap 26 is not connected on both sides of meter 22C, the amount of electric energy diverted through tap 26 is not related to the amount of electric energy delivered through meter 22C.

[0007] Because electric energy diversion is costly to electric energy utilities and may be linked to other criminal activity (e.g., clandestine marijuana grow operations), there is a need for quantifying and identifying sources of electric energy diversion. It is possible to quantify electric energy diversion within a particular part of an electric energy distribution network (referred to herein as an "inventory zone") by comparing the energy delivered to the inventory zone with metered energy consumption removed from (i.e., consumed in) the inventory zone. In the context of the distribution system 10, the energy delivered to an inventory zone 28 may be measured by a meter 30 connected in series between distribution transformer 14 and secondary distribution line 16.

[0008] If only bypass diversions are present in an inventory zone, it is possible to identify where bypass diversions are located from the vector k of bypass diversion factors found by measuring energy consumption for the inventory zone and consumers within the inventory zone for a plurality of intervals, and solving the system of linear equations

where:

/ ' is the number of intervals;

j is the number of consumers;

w, is the energy consumption measured for the time interval by the meter for the / consumer, and

w z/ is the energy consumption measured for the h time interval by the distribution transformer meter for the inventory zone).

For convenience, matrix equality (1) may be expressed as W consume rk = w zone where W con sumer is a matrix of metered consumer load profile data wy for consumers in the inventory zone over a number of time intervals (i.e. , W consumer = [ w i j ]„ xm r m consumers and n time intervals) and w zone is a vector of inventory zone load profile data (i.e. , w zone =

[w zi ] m ).

[0009] This technique fails if the inventory zone contains one or more tap diversions, since electric energy diverted by way of taps is reflected in inventory zone load profile w zone but is not reflected in the metered consumer load profiles W con sumer- Currently, bypass diversions and tap diversions are identified by manually inspecting electric power distribution equipment (e.g. , transformers, lines, meters, etc.). This is time-consuming and labour intensive.

[0010] The inventor has identified a need for methods and apparatus adapted to use metered electric energy consumption data to do one or more of the following:

quantify bypass diversion loads in an inventory zone that contains bypass diversions and tap diversions,

reliably identify the locations of bypass diversions in an inventory zone that contains bypass diversions and tap diversions,

quantify tap diversion loads in an inventory zone that contains bypass diversions and tap diversions, and

identify the locations of tap diversions in an electric utility power distribution system.

[0011] The foregoing examples of the related art and limitations related thereto are intended to be illustrative and not exclusive. Other limitations of the related art will become apparent to those of skill in the art upon a reading of the specification and a study of the drawings.

SUM MARY

[0012] The following embodiments and aspects thereof are described and illustrated in conjunction with systems, tools and methods which are meant to be exemplary and illustrative, not limiting in scope. In various embodiments, one or more of the above- described problems have been reduced or eliminated, while other embodiments are directed to other improvements.

[0013] An aspect of the invention provides a method for characterizing non-technical losses in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least two metered consumer nodes. In an example embodiment, the method comprises obtaining inventory zone load profile data, obtaining consumer load profile data for the consumer nodes, and determining bypass diversion factors for the consumer nodes and aggregate tap loads for the inventory zone that (i) solve a system of load balance equations for the inventory zone having known values corresponding to the inventory zone load profile data and to the consumer load profile data and having slack variables representing the aggregate tap loads, in which the known values corresponding to the consumer load profile data are scaled by the bypass diversion factors and (ii) minimize an objective function whose value is positively related to the sum of the slack variables representing the aggregate tap loads. In some embodiments, methods according to this aspect additionally comprise obtaining an admittance matrix modeling the electrical admittance between the nodes of the inventory zone, obtaining substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone, obtaining substantially simultaneous

instantaneous voltage magnitude data for each of the metered nodes of the inventory zone, determining a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node, and determining real and reactive tap loads corresponding to select ones of the consumer nodes that (i) solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the metered nodes, voltage magnitude values corresponding to the voltage data each of the metered nodes, and having slack variables representing the real and reactive tap loads, and (ii) minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations.

[0014] Another aspect of the invention provides a method identifying tap loads in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least metered two consumer nodes. In some embodiments, the method comprises obtaining an admittance matrix modeling the electrical admittance between the nodes of the inventory zone, obtaining substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone, obtaining substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone, determining a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node, and determining real and reactive tap loads corresponding to select ones of the consumer nodes that (i) solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and (ii) minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the corresponding determined voltage phase angles that solve the first system of power flow equations.

[0015] A further aspect of the invention provides a system for characterizing nontechnical losses in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including a distribution node and at least two consumer nodes. In some embodiments, the system comprises a data store comprising a non- transitory computer readable medium containing inventory zone load profile data and consumer load profile data for each of the consumer nodes, and a data processor communicatively coupled to the data store. The data processor may be configured to obtain the inventory zone load profile data from the data store, obtain the consumer load profile data for each of the consumer nodes from the data store, and determine bypass diversion factors for the consumer nodes and aggregate tap loads for the inventory zone that (i) solve a system of load balance equations for the inventory zone having known values

corresponding to the inventory zone load profile data and to the consumer load profile data and having slack variables representing the aggregate tap loads, in which the known values corresponding to the consumer load profile data are scaled by the bypass diversion factors, and (ii) minimize an objective function whose value is positively related to the sum of the slack variables representing the aggregate tap loads. The data processor may be configured to generate a record in a non-transitory medium indicating the determined bypass diversion factors and aggregate tap loads.

[0016] Yet another aspect of the invention provides a system for identifying tap loads in an electric utility power distribution inventory zone, the inventory zone comprising a plurality of nodes including at least one metered distribution node and at least two metered consumer nodes. In some embodiments, the system comprises a data store comprising a non-transitory computer readable medium of the data store contains an admittance matrix modeling the electrical admittance between the nodes of the inventory zone, substantially simultaneous instantaneous real and reactive load data for each of the metered nodes of the inventory zone, and substantially simultaneous instantaneous voltage magnitude data for each of the metered nodes of the inventory zone, and a data processor communicatively coupled to the data store. The data processor may be configured to obtain the admittance matrix from the data store, obtain the substantially simultaneous instantaneous real and reactive load data from the data store, obtain the substantially simultaneous instantaneous voltage magnitude data from the data store, determine a voltage phase angle for each of the consumer nodes that solve a first system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for the consumer nodes and in which the distribution node is treated as a slack node, and determine real and reactive tap loads corresponding to select ones of the consumer nodes that (i) solve a second system of power flow equations for the inventory zone having known values corresponding to the real and reactive load data for each of the nodes, voltage magnitude values corresponding to the voltage data for each of the metered nodes, and having slack variables representing the real and reactive tap loads, and (ii) minimize an objective function whose value is positively related to at least one of the slack variables representing the real and reactive tap loads using an iterative numerical solution technique wherein variables in the second system of power flow equations corresponding to the voltage phase angles of the select ones of the consumer nodes are initialized to values corresponding to the

corresponding determined voltage phase angles that solve the first system of power flow equations. The data processor may be configured to generate a record in a non-transitory medium indicating the determined real and reactive tap loads corresponding to the select ones of the consumer nodes. [0017] In addition to the exemplary aspects and embodiments described above, further aspects and embodiments will become apparent by reference to the drawings and by study of the following detailed descriptions. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings show non-limiting example embodiments.

[0019] Figure 1 is a schematic diagram of part of an electric energy distribution system 10.

[0020] Figure 2 is a flowchart of a method according to an example embodiment.

[0021] Figure 3 is a flowchart of a method according to an example embodiment.

[0022] Figure 4 is a schematic diagram of an example inventory zone, which is referred to in describing the example method illustrated by Figure 3.

[0023] Figure 4A is a schematic diagram of a model of an inventory zone corresponding to the inventory zone shown in Figure 4.

[0024] Figure 5 is a flowchart of a method according to an example embodiment.

[0025] Figure 6 is a schematic diagram of a system according to an example embodiment.

[0026] Figure 7 is a schematic diagram of another example inventory zone, which is referred to in describing the example method illustrated by Figure 8.

[0027] Figure 8 is a flowchart of a method according to an example embodiment.

DETAILED DESCRIPTION

[0028] Throughout the following description specific details are set forth in order to provide a more thorough understanding to persons skilled in the art. However, well known elements may not have been shown or described in detail to avoid unnecessarily obscuring the disclosure. Accordingly, the description and drawings are to be regarded in an illustrative, rather than a restrictive, sense.

[0029] One aspect of the invention provides methods and apparatus for

distinguishing between bypass diversions and tap diversions in an inventory zone. Figure 2 illustrates a method 40 according to an example embodiment. Step 42 comprises obtaining metered inventory zone load profile data (e.g., a vector w zone ). Step 44 comprises obtaining metered consumer load profile data for the inventory zone (e.g. , a matrix W con sumer)- Load profile data obtained in steps 42 and 44 may comprise, for example, time series load measurements obtained at each of a plurality of meters substantially synchronously (e.g. , at consecutive one hour intervals according to a common clock). Load profile data may be referred to in the electric power utility industry as "interval data". Steps 42 and 44 may comprise obtaining substantially simultaneously acquired load measurements from a network of meters connected by a wired or wireless network, for example.

[0030] Step 46 comprises determining bypass diversion factors k (e.g. , each j is a multiplier of the value wy required for the product wyk j to reflect the f consumer's metered load and bypass load at the /* time interval) and tap loads s (e.g. , each s, represents the total energy in the /* time interval that cannot be correlated with any consumer's metered consumption) that:

(1 ) minimize an objective function whose value is positively related to the sum of tap loads s (e.g., Z =∑s represents the sum total energy not attributable to metered consumption or bypass diversions, which is attributed to tap diversion losses), and

(2) solve a system of load balance equations (one equation for each interval /) in which tap loads s are slack variables:

under the constraint k } ≥ 1 k and st≥ 0 V s. For convenience, the matrix equality (2) may be expressed as W consumer k + s = w zone , where s is a vector of aggregate tap loads for the inventory zone in each time interval (i.e. , s = [si] m ). Put another way, step 46 comprises finding bypass diversion factors k and time series aggregate tap loads s that solve equation (2) and minimize an objective function whose value is positively related to the sum of tap loads under the constraints k j ≥ 1 V k and s t ≥ 0 V s. In some embodiments, the constraint on values in k is specified to be a value less than one (e.g. , k j > a V k where a is a value between 0.95 and 1 , such as 0.98 for example), such as to allow for discrete measurement resolution, for example.

[0031] In some embodiments, the Simplex solution method may be used to obtain a solution for bypass diversion factors k and aggregate tap loads s that minimizes Z, though other mathematical techniques for minimizing Z can be used. It may also be possible to use other objective functions for Z. In some embodiments, a Generalized Reduced Gradient solution method, as described below, may be used to obtain a solution for bypass diversion factors k and aggregate tap loads s that minimizes a non-linear objective function.

[0032] Depending on the magnitude of aggregate tap loads, in some situations it may be necessary for at least one of the / ' intervals to have no taps loads in order to determine bypass diversion factors k. For example, in some situations a large, continuous tap load could be incorrectly identified as multiple bypasses. Accordingly, in some embodiments, method 40 may comprise selecting intervals that span a time period that includes a tap load transition (e.g., the beginning or end of a tap load). For example, a tap load transition may be identified when there is a discontinuity in the amount of un-accounted for energy delivered to an inventory zone.

[0033] Once bypass diversion factors k are obtained, an element whose value is 1 indicates that the f consumer's meter is not affected by a bypass diversion. An element k s whose value is n> 1 indicates that the f consumer's meter is affected by a bypass diversion and that only 1/n of the energy consumed by this consumer is registered in the meter (i.e., the remaining (n-1)/n of the energy consumed bypasses the meter). Accordingly, bypass diversion losses in the inventory zone can be computed for each time interval / ' as

j [ Wij (k j - 1)] .

[0034] In some embodiments, method 40 or similar methods may be used to determine consumer connectivity. For example, in some situations an operator of electric power utility may be unsure whether or not a particular consumer is connected to a particular distribution transformer (e.g. due to incomplete or incorrect records). In such a case, the operator may include that consumer in the inventory zone, modify the constraints such that k s > 0 and the bypass diversion factor /( for that consumer determined by method 40 will indicate whether or not that consumer is connected to that distribution transformer, wherein a k value of 0 indicates that the user is not connected.

[0035] In some situations, certain ones of bypass diversion factors k may have values slightly greater than 1 (e.g. 1.1 , 1.2, etc.). Such values are likely the result of numerical artifacts, rather than actual bypasses, as the minimum diversion factor for a typical bypass has a value of about 2. Accordingly, in some embodiments additional constraints may be imposed to exclude such results, for example by making the bypass diversion factors k semi-continuous values. For example, additional constraints may be imposed by allowing values equal to 1 , or greater than or equal to 2 (or, for example, 1 .9 or some other typical minimal diversion factor for the distribution system under study), but not the values between 1 and about 2. In such embodiments, by not permitting bypass diversion factors k to have values slightly greater than 1 , small false positives may be eliminated, thereby making actual bypasses more readily identifiable.

[0036] Another aspect of the invention provides methods and apparatus for identifying locations of tap diversions in an inventory zone. Figure 3 illustrates a method 50 for identifying locations of tap diversions in an inventory zone according to an example embodiment. Figure 4 is a schematic diagram of an example inventory zone 60, which is referred to in describing method 50. In inventory zone 60, distribution transformer meter 62 and consumer meters 64, 66 and 68 measure power distributed from a power distribution transformer 70 through an electrical network of nodes 72, 74, 76 and 78 to consumers 84, 86 and 88. Nodes 72, 74, 76 and 78 are respectively associated with distribution transformer distribution meter 62 and consumer meters 64, 66 and 68. Inventory zone 60 includes an unmetered tap load 88A downstream of node 78.

[0037] Step 52 comprises obtaining an admittance matrix Y modeling the electrical admittance between all nodes in the inventory zone. Figure 4 shows electric paths 94, 96 and 98 between node 72 and nodes 74, 76 and 78, which paths have admittances Y 12 , Y13 and Y 14 respectively. Paths 95, 97 and 99, which have admittances Y23, Y2 and Y 3 , respectively, are shown notionally in Figure 4. In the Figure 4 topology, paths 95, 97 and 99 may be zero, but in other topologies may have non-negligible values. In what follows, elements of Y are expressed as G, ¾ + jB ik , where G, ¾ is the magnitude of the real part (also referred to as "conductance") of the element in the admittance matrix Y at the /* row and column and B ik is the magnitude of the imaginary part (also referred to as "susceptance") of the element in the admittance matrix Y at the /* row and k column (i.e. , Y = [G ik + y¾] NxN ) .

[0038] Step 54 comprises obtaining substantially simultaneous values for "known" real and reactive loads P, and Q, at all metered nodes N, in the inventory zone (representing energy injected into or removed from nodes 72, 74, 76 and 78, which may be measured, at least in part, by meters 62, 64, 66 and 68, respectively). Step 54 may comprise obtaining substantially simultaneous acquired meter values for instantaneous real and reactive loads at all metered nodes N, in the inventory zone. Where the inventory zone contains bypass diversion (e.g. , because a value for kj> 1 was determined for at least one node N, in method 40), step 54 may comprise scaling the instantaneous real and reactive metered loads at nodes N, affected by bypass diversions by their corresponding bypass diversion factors k,.

[0039] Step 56 comprises obtaining substantially simultaneous values for the instantaneous voltage magnitude \ Vj\ at all metered nodes in the inventory zone, such as might be measured by meters 62, 64, 66 and 68, for example. In some embodiments, step 56 comprises obtaining substantially simultaneous values for the instantaneous voltage magnitude \ Vj\ at less than all metered nodes in the inventory zone.

[0040] Step 58 comprises determining complex voltages (magnitude \ Vj\ and angle θ,) for each consumer node by solving an exactly determined first system of real and reactive power flow equations in which the distribution transformer node is treated as a slack node.

[0041] The following two equations are example forms of real and reactive power flow equations that may be solved for each node N, simultaneously in step 58:

N

(3)

0 = -Pi + Y \ Vi \ \ V k \ (G ik cos(0i - 0 fc ) + B ik sin^ - 0 fc ))

k=l

N

(4)

0 = -Qi + _ \ Vi \ \ V k \ {G ik sin(0i - 0 fc ) - B ik cos^ - 0 fc ))

k=l

In equations (3) and (4):

Pi is the real load at node N, and

o where node N, is one of consumer nodes 74, 76 and 78, P, has the value

obtained in step 54, and

o where node N, is the distribution transformer node 72, P, is treated as unknown;

Qi is the reactive load at node N, and

o where node N, is one of consumer nodes 74, 76 and 78, Q, has the value

obtained in step 54, and

o where node N, is the distribution transformer node 72, Q, is treated as unknown;

\ Vj\ is the voltage magnitude at node N, and

o where node N, is one of consumer nodes 74, 76 and 78, \ Vj\ is treated as

unknown; \ Vj\ may be initialized to an arbitrary value (e.g. , a nominal system voltage for a "flat start") or to a value obtained in step 56 (e.g. , for distribution transformer node 72, for node N,, or for another consumer node); o where node N, is distribution transformer node 72, \ Vj\ has the value obtained in step 56 for distribution transformer node 72;

• G ik is the real part of the element at the /* row and rf h column in the admittance matrix Y determined in step 52;

· B jk is the imaginary part of the element at the /* row and rf h column in the admittance matrix Y determined in step 52;

• Θ, is the voltage phase angle at node Λ/, and

o where node N, is one of consumer nodes 74, 76 and 78, Θ, is treated as

unknown and initialized to an arbitrary value (e.g. , zero for a "flat start"), and o where node N, is distribution transformer node 72, Θ, is fixed arbitrarily at an arbitrary value (e.g, . the same value as the initial value of 0, for consumer nodes, such as zero for a "flat start").

[0042] The solution obtained to the system of real and reactive power flow equations represents the power flow solution for "known" consumer loads, and is used as the starting point for finding tap theft locations in step 59. Numerical methods, such as the Newton- Raphson and Generalized Reduced Gradient methods, for example, may be used to solve the power flow equations to obtain complex voltages for consumer nodes. It will be appreciated that though a system of equations having equations in the form of equations (3) and (4) for each node in an inventory zone has the same number of equations as it does unknowns, the initial approximations of the unknowns may affect whether numerical methods converge to the solution of the system.

[0043] Step 59 comprises determining real tap loads P and/or reactive tap loads Q corresponding to one or more nodes N, that:

(1 ) minimize an objective function Z whose value is positively related to the sum total of the magnitudes of the determined real and reactive tap loads

(2) solve a second system of real and reactive power flow balance equations in which tap affected voltage phase angles Q at consumer nodes are unknown variables and the real tap loads P and/or reactive tap loads Q.J are slack variables.

[0044] Put another way, step 59 comprises finding consumer node voltage phase angles d and one or more real and reactive tap loads Pj and Q.J corresponding to one or more nodes N, that solve a second system of real and reactive power flow balance equations in which the real and reactive tap loads are slack variables and minimize an objective function whose value is positively related to the apparent power of the determined tap loads (i.e., the square root of the sum of the squares of the determined real and reactive tap loads). Real and reactive tap loads P, r and Q, r may be determined in step 59 by using a numerical method in which the variables for tap affected voltage phase angle Θ, Γ at consumer nodes are initialized to the value Θ, determined in step 58.

[0045] The following two equations are example forms of real and reactive power flow equations that may be solved in step 59:

0 = -Ql - Qi + JVil|V fc |(G ifc sinOf - ΘΙ) - B ik cosOf - ø£))

k=l

In equations (5) and (6):

· P is the unknown real tap load at node N,, and is initialized to zero;

• Q is the unknown reactive tap load at node N,, and is initialized to zero;

• Pi is the known real load at node N, obtained in step 54;

• Qi is the known reactive load at node N, obtained in step 54;

• \ Vj\ is the measured voltage magnitude at node N, obtained in step 56;

· G ik is the real part of the element at the /* row and rf h column in the admittance matrix Y determined in step 52;

• B jk is the imaginary part of the element at the /* row and rf h column in the admittance matrix Y determined in step 52;

• θ is the unknown tap affected voltage phase angle at node N, and

o where node N, is a consumer node, Θ, Γ is initialized to the value of Θ, determined in step 58, and

o where node N, is the distribution transformer node, Θ, Γ is fixed at the same value it was fixed at in step 58 (e.g., to zero).

[0046] In some cases, the initialization of Θ, Γ in step 59 to the value of Θ, determined in step 58 may promote convergence of the optimization of the second system of equations to a solution that places the tap theft loads P, r and Q, r at the correct nodes. [0047] The solution obtained in step 59 represents the power flow solution for the

"known" consumer loads, measured consumer voltage magnitudes and the solution set of tap affected node voltage angles of Θ, Γ , and the solution set of P, r and Q, r tap theft loads values. Nodes having relatively larger values of P, r (and/or Q, r ) are relatively more likely to be affected by tap diversions. Nodes having values of P, r that are zero or relatively close to zero are more likely to not be affected by tap diversions.

[0048] There may be cases where the step 59 optimization does not converge to a valid solution. In some embodiments, one or more additional constraints may be added to the system of equations that constrains the step 59 optimization to promote convergence to a valid solution. For example, in some embodiments equations specifying a relationship between the variables P, r and Q, r for one or more nodes N, having these variables in their corresponding power flow equations are added to a system of real and reactive power flow equations that constrains the step 59 optimization. For example, a linearly proportional relationship between P, r and Q, r may be specified, such in the form Q, r = a P, r to further constrain the step 59 optimization. In a non-limiting example embodiment, a is specified as 0.2.

[0049] A specified relationship between P, r and Q, r may reflect an estimated or expected power factor of the possible tap load at the node. For instance, where PF,- denotes the expected or estimated power factor of a possible tap load at node N,, equations in the form may be added to a system of real and reactive power flow equations that constrains the step 59 optimization. PF, may be the same or different among nodes in an inventory zone. In some embodiments, power factor PF, for possible tap loads may be estimated based on a difference between values for P, and Q, determined for the distribution node in step 58 and values for real and reactive power measured for the distribution node in step 54. The difference between the power values determined in step 58 and the power values measured in step 54 reflects the aggregate tap load, and a power factor determined from the real and reactive power differences reflects the power factor of the aggregate tap load. This power factor may be used as an estimate of the power factor PF,- of the individual possible tap loads, and accordingly used to relate P, r and Q, r to further constrain the second system of power flow equations solved in step 59. In some embodiments, a power factor for tap loads is specified based on expectations derived from past experience (e.g., power factor of tap loads previously detected in that inventory zone or other inventory zones).

[0050] In some embodiments, the step 59 power flow equations for one or more nodes do not include one or both of variables P, r and Q, r For example, variables P, r and Q, r may not be included in the power flow equation for a node (e.g., the distribution transformer node) when there is confidence that there is no tap diversion proximate to the node. For another example, Q, r may not be included in the power flow equation for a node when there is confidence that any tap diversion that might be present at the node does not have an appreciable reactive component. Omitting variables P, r and/or Q, r from one or more power flow equations reduces the number of unknown variables to be determined in the step 59 optimization, and may promote convergence of the step 59 optimization to a valid solution. In some cases, not including one or both of variables P, r and Q, r in the step 59 power flow equation for a node that is in fact affected by a tap diversion may result in method 50 allocating the tap diversion among nearby nodes. Where this occurs, the number of tap diversions indicated by the result of method 50 may appear to be unusually large. Variables P and Q may be added to the power flow equation of a node for which they were previously omitted that is proximate to a "cluster" of tap diversions indicated by the result, and method 50 performed again with the "new" P and Qj variables.

[0051] In some cases it may be necessary or convenient to include unmetered nodes in applications of method 50. For example, an electric power utility's admittance model for a distribution network in an inventory zone may comprise unmetered nodes (e.g. , in order to correspond with the physical topology of the inventory zone). Figure 4A shows an example model 100 that corresponds to inventory zone 60 shown in Figure 4. In model 100, metered nodes 74, 76 and 78 are connected to corresponding unmetered intermediate nodes 74A, 76A and 78A. Nodes 74A, 76A and 78A are connected in series to node 72. Power delivered to node 72 is metered by meter 62.

[0052] Nodes 74A, 76A and 78A may be included in method 50 as follows.

• The admittance matrix obtained in step 52 may contain elements corresponding to paths between nodes 74A, 76A and 78A and the other nodes in the inventory zone. • Since nodes 74A, 76A and 78A are unmetered, no measurements are obtained for them in steps 54 and 56.

• In step 58, equations corresponding to nodes 74A, 76A and 78A are included in the first system of power flow equations. In these equations, voltage magnitude | W| and phase angle Θ, are both treated as unknowns, and the real and reactive power terms Pi and Qi are fixed at arbitrary values (e.g. , zero or another small value corresponding to expected technical loss, known unmetered load, etc. at the nodes).

• In step 59, equations corresponding to nodes 74A, 76A and 78A are included in the second system of power flow equations. In these equations, voltage magnitude | W| and tap affected phase angle Θ, Γ are treated as unknowns. Where the second system of equations is solved using an iterative numerical technique, these unknowns may be initialized to the corresponding values calculated for voltage magnitude | W| and phase angle Θ, in step 58. These equations may not include real and reactive tap power terms P, r and Q, r , since in some cases this could prevent solution of the second system of equations. If it occurs that one or more of nodes 74A, 76A and 78A is in fact affected by a tap diversion, method 50 may allocate the tap diversion among nearby metered nodes. Where the result of step 59 indicates that one or more of nodes 74A, 76A and 78A is surrounded by a "cluster" of tap diversions, variables P, r and Q, r may be added to the power flow equations for those one or more of nodes 74A, 76A and 78A, and removed from the power flow equations for nearby metered nodes. Step 59 may then be performed again with the "new" P, r and Q, r variables for the one or more unmetered nodes.

[0053] Information quantifying and identifying bypass and tap diversions in electric utility networks obtained by practice of methods of the invention (e.g, . methods 40 and/or 50), may be used in the automatic control of electric utility networks and billing of customers of such networks. Figure 5 is a flow chart of a method 120 according to an example embodiment. In method 120, step 122 comprises determining whether there is at least one bypass diversion present in an inventory zone based on load profile data 124 for the inventory zone. Step 122 may comprise one or more steps of method 40, for example. In some embodiments, step 122 comprises whether any node of the inventory zone has a bypass diversion factor determined in step 46 greater than a threshold (e.g. , one, a number greater than one). [0054] If in step 122 it is determined that there is at least one bypass diversion in the inventory zone (step 122, YES), method 122 proceeds to step 126. Step 126 comprises identifying the nodes affected by bypass diversion(s) in the inventory zone. In embodiments where step 122 comprises determining a set of bypass diversion factors, as is done in method 40, for example, step 126 may comprise determining which nodes have bypass diversion factors greater than 1 , for example. After step 126, method 120 may proceed to either of both of steps 128 and 130. Step 128 comprises cutting power to the bypass- affected nodes identified in step 126. Step 130 comprises scaling load profile data for the bypass-affected nodes identified in step 126. This bypass-scaled load data may be used for billing customers for bypass loads in step 132. It will be appreciated that steps 122 through 132 may be automated (e.g., performed without human intervention). It will also be appreciated that nodes identified as being affected by bypass diversion(s) in step 126 be manually inspected prior to performing one or both of steps 128 and 130.

[0055] If in step 122 it is determined that there is not at least one bypass diversion in the inventory zone (step 122, NO), method 122 proceeds to step 138.

[0056] Step 126 is also followed by step 134. Both step 134 and 138 comprise determining whether there is one or more tap diversions in the inventory zone. Step 134 and/or step 138 may comprise one or more steps of method 40 for example. In some embodiments, one or both of steps 134 and 138 comprises determining whether any tap diversion loads determined in step 46 of method 40 are non-zero.

[0057] If in step 134 or step 138 it is determined that there is not one or more tap diversions in the inventory zone (step 134 or step 138, NO), method 120 proceed to termination 136.

[0058] If in step 134 it is determined that there is one or more tap diversions in the inventory zone (step 134, YES), method 120 proceeds to step 140. Step 140 comprises scaling instantaneous load data 142 for bypass-affected nodes identified in step 126. Step 140 may comprise scaling instantaneous load data for a bypass-affected node by a bypass diversion factor determined in step 46 of method 40, for example. After step 140, method 120 proceeds to step 144.

[0059] If in step 138 it is determined that there is one or more tap diversions in the inventory zone (step 138, YES), method 120 proceeds to step 144. Step 144 comprises identifying nodes affected by tap diversion based on instantaneous load and voltage data. Step 144 may comprise one or more steps of method 50, for example. In some embodiments, step 144 comprises identifying nodes determined to have real and/or reactive tap load values (P, r and Q, r ) determined in step 59 of method 50 greater than a threshold (e.g., in some embodiments, the threshold may be zero, or a number greater than zero).

[0060] After step 144, method 120 may proceed to either of both of steps 146 and 148. Step 146 comprises cutting power to the tap-affected nodes identified in step 144. Step 148 comprises determining tap loads for the tap-affected nodes identified in step 144. Step 144 may comprise determining for real and/or reactive tap load values (P, r and Q, r ), as in step 59 of method 50, for example. Tap loads determined in step 148 may be used for billing customers for tap loads in step 150. In some embodiments, customers at tap-affected nodes are billed for energy consumption calculated based on the determined tap loads for their nodes and estimated time period in which their tap loads were active (such as may be inferred by analyzing changes in the difference between a metered load or consumption for the inventory zone and the sum of metered load or consumption for consumer nodes in the inventory zone). It will be appreciated that steps 122 through 150 may be automated (e.g., performed without human intervention). It will also be appreciated that nodes identified as being affected by tap diversion(s) in step 144 be manually inspected prior to performing one or both of steps 146 and 150.

[0061] Figure 6 is a schematic diagram of a system 200 according to an example embodiment. System 200 comprises a plurality of electric energy meters 202. Meters 202 are configured to obtain at least load profile data, and may be configured to obtain instantaneous real and reactive power data and instantaneous voltage data. Meters 202 include a plurality of consumer meters and at least one upstream meter (e.g. , a distribution transformer meter) that meters energy delivered to a subset of at least two of the consumer meters (e.g., an inventory zone). Meters 202 are communicatively coupled to a hub 204. In the illustrated system, meters 202 are wireless networked with hub 204, but this is not necessary. Meters 202 may be communicatively coupled with each other (e.g. , in a mesh network), or may have direct links to hub 204, for example. Hub 204 is configured to aggregate data obtained by meters 202.

[0062] Hub 204 is communicatively coupled via a communication network 206 to a data processor 208. Network 206 may comprise a public network (e.g., the Internet) or a private network (e.g., comprised of private communication links), and may be implemented using any suitable networking technology (e.g. , packet based, switched link, etc.). [0063] Data processor 208 may comprise one or more central processing units

(CPUs), one or more microprocessors, one or more field programmable gate arrays

(FPGAs), application specific integrated circuits, logic circuits, or any combination thereof, or any other suitable processing unit(s) comprising hardware and/or software capable of functioning as described herein. Data processor 208 is coupled to a data store 210. Data store 210 comprises one or more non-transitory computer readable media. Data processor 208 is configured to store data obtained by meters 202 and received at data processor 208 (e.g., via hub 204 and network 206) in data store 210.

[0064] Data processor 208 is also configured to execute one or more steps of methods 40, 50 and 120. For example, data processor may be configured to execute software instructions contained in a non-transitory computer-readable medium of data store 210, which instructions when executed by data processor 208 cause data processor 208 to perform one of more steps of methods 40, 50 and 120. Data processor 208 may be configured to cause output of methods 40, 50 and/or 120 (e.g., identification of nodes affected by tap diversions and/or bypass diversions, bypass loads and/or tap loads associated with nodes, customer billing information, etc.) to be displayed on a display 212, to printed on print media 214 by a printer 216, and/or to be stored as a record in non-transitory computer-readable media of data store 210, for example.

[0065] Data processor 208 may comprise physically remote and independently operating components, one of which stores data obtained by meters 202 in data store 210 and another that performs steps of methods 40, 50 and/or 120. Data store 210 may comprise physically remote and independently operating components, one of which stores data obtained by meters 202 and another that stores computer-readable instructions executable by data processor 208.

[0066] In some situations, it may be problematic to properly identify the locations of tap diversions in an inventory zone due to voltage measurement errors. For example, certain currently available consumer meters have a rated measurement error of about 0.5%. Some types of meters have typical measurement errors of about 0.2%. Accordingly, it is possible that in some circumstances method 50 described above may fail to converge on a solution. In such circumstances, a modified method may be performed to locate tap diversions wherein a "secondary tap" at one of a plurality of distribution nodes is considered, as discussed below with reference to Figures 7 and 8. [0067] Figure 7 shows an example inventory zone 300 wherein a distribution transformer 302 supplies sixteen consumers 320A-P. The total power delivered to inventory zone 300 by distribution transformer 302 is metered by a distribution meter 304. The power delivered to each of consumers 320A-P (other than any power which is unlawfully diverted) is respectively metered by consumer meters 322A-P. Consumers 320A-P are arranged into four groups connected (through their respective meters) to a secondary distribution line 310 at four separate distribution nodes 312, 314, 316, 318, with consumers 320A-D connected to node 312, consumers 320E-H connected to node 314, consumers 320I-L connected to node 316, and consumers 320M-P connected to node 318. Distribution transformer 302 is also connected (through distribution meter 304) to node 316.

[0068] Figure 8 illustrates an example method 400 for identifying locations of tap diversions in an inventory zone. Method 400 is described with reference to example inventory zone 300 of Figure 7, but it is to be understood that method 400 could be useful for identifying locations of tap diversions in any inventory zone with two or more distribution nodes. Method 400 may, for example, be performed wholly or in part by one or more processing elements, such as for example data processor 208.

[0069] Step 402 comprises determining tap loads at consumer nodes using the measured loads and voltages at the consumer nodes. Step 402 may comprise one or more steps of method 50, for example. If a solution is reached at step 404, method 400 proceeds to end at step 406. If a solution is not reached at step 404, method 400 proceeds to step 408. A solution may not be reached, for example, if the determination at step 402 fails to converge (e.g., the error terms are not less than a predetermined convergence threshold). However, even if the determination at step 402 fails to converge, it will identify consumers where tap diversions are likely. Accordingly, the results of the determination at step 402 are used in step 408.

[0070] In step 408 a set of secondary tap power flow equations are generated which allow for a tap at one of the secondary distribution nodes by assigning the real and reactive tap loads and the voltage magnitude and phase at the secondary distribution node as unknown variables to determine. The consumer tap loads are fixed to the values determined in step 402, and the consumer voltage magnitudes and phases are also unknown variables to determine. The secondary tap power flow equations may have the same general form as equations (5) and (6) above. For example, in some embodiments step 408 may comprise taking the results from step 402 and changing which values are fixed and which values are variable to generate the secondary tap power flow equations.

[0071] In step 410, real and reactive tap loads and the voltage magnitude and phase at the secondary distribution node under consideration, as well as consumer voltage magnitudes and phases, that satisfy the secondary tap power flow equations are numerically determined (e.g., by a Generalized Reduced Gradient method as discussed above). If a solution is reached at step 412 (e.g. the solution converges), method 400 proceeds to step 414 and the calculated consumer voltage magnitudes are stored in a table indexed by the secondary distribution node (or another suitable data structure). Step 414 may also comprise storing complex consumer voltages, consumer tap magnitudes and/or secondary tap magnitudes. For example, consumer and secondary tap magnitudes may optionally be used to validate the results of method 400 by comparing the total loss measured for inventory zone 300 to the sum of the taps calculated by method 400 (with appropriate adjustments for any bypasses, as discussed above). If a solution is not reached at step 412, method 400 bypasses step 414 (such that the voltages are not stored) and proceeds to step 416.

[0072] At step 416, if the secondary distribution node under consideration is not the last distribution node (i.e., if all secondary distribution nodes have not yet been considered), method 400 proceeds to step 418 where a next distribution node is considered. After step 418, method 400 repeats steps 408 to 416 until the last distribution node has been considered.

[0073] After all of the distribution nodes have been considered (step 416, YES), method 400 proceeds to step 420, where differences between the measured voltages and the calculated consumer voltage magnitudes stored in step 414 are determined for each distribution node. At step 422, any voltage difference that exceeds the respective meter's rated measurement error is identified as a voltage violation. At step 424, a voltage difference range is calculated for each distribution node by determining the "spread" in voltage differences. In other words, the voltage difference range for a distribution node is the range between the highest positive voltage difference determined in step 420 and the lowest negative voltage difference determined in step 420.

[0074] At step 426, the secondary distribution node(s) having the smallest voltage difference range (in no case more than twice the meters' rated measurement error) and the fewest voltage violations determined at step 422 is determined to be a likely location of a secondary distribution system tap. If one of the secondary distribution nodes has a voltage difference range of less than twice the meters' rated measurement error, or has a

significantly lower voltage difference range than the other secondary distribution nodes, then that secondary distribution node is determined to be the most likely location of a secondary tap. In some situations, more than one secondary distribution node may be determined to be a likely tap location. For example, with reference to Figure 3, in the situation of a secondary tap on distribution line 310 between nodes 312 and 314, the voltage difference ranges and number of voltage violations calculated for nodes 312 and 314 may be similar. In order to more precisely determine the likely location of the secondary tap, in some embodiments step 426 comprises determining and comparing cumulative voltage differences between the measured voltages and calculated voltages for each secondary distribution node stored in step 414. The cumulative voltage difference for each secondary distribution node is the sum of the differences between the measured consumer voltages and the consumer voltages calculated when allowing for a tap at that node. In one example, when a secondary tap is between secondary distribution nodes 312 and 314, the cumulative voltage difference when allowing for a tap at node 312 indicates that the calculated voltages tend to be lower than the measured voltages, and the cumulative voltage difference when allowing for a tap at node 314 indicates that the calculated voltages tend to be higher than the measured voltages, and the ratio of cumulative voltage differences (or another suitable relationship between the voltage differences when allowing for a tap a node 312 and the voltage differences when allowing for a tap at node 314) may be used to determine the most likely location of a secondary tap along distribution line 310 between nodes 312 and 314.

[0075] The location of the secondary tap determined at step 426 may be output by any suitable means, including those described above with respect to system 200 of Figure 6. After step 426, method 400 ends at step 428.

[0076] It will be appreciated from the foregoing that determining the presence and identifying the locations of bypass and tap diversions is an undertaking whose complexity expands dramatically with the number of nodes in an inventory zone. For inventory zones of even a few meters, the numerical solution methods required to perform the methods disclosed herein cannot, as a practical matter, be performed entirely in a human's mind and accordingly requires use of a machine configured to perform such methods.

[0077] Where a component or feature is referred to above (e.g. , meter, transformer, inventory zone, load profile data, interval data, data processor, data store, hub, printer, display, etc.), unless otherwise indicated, reference to that component (including a reference to a "means") should be interpreted as including as equivalents of that component any component which performs the function of the described component (i.e., that is functionally equivalent), including components which are not structurally equivalent to the disclosed structure which performs the function in the illustrated exemplary embodiments of the invention.

[0078] Unless the context clearly requires otherwise, throughout the description and the claims, the words "comprise," "comprising," and the like are to be construed in an inclusive sense, as opposed to an exclusive or exhaustive sense; that is to say, in the sense of "including, but not limited to." Where the context permits, words in the above description using the singular or plural number may also include the plural or singular number respectively. The word "or," in reference to a list of two or more items, covers all of the following interpretations of the word: any of the items in the list, all of the items in the list, and any combination of the items in the list.

[0079] The above detailed description of example embodiments is not intended to be exhaustive or to limit this disclosure and claims to the precise forms disclosed above. Those skilled in the art will appreciate that certain features of embodiments described herein may be used in combination with features of other embodiments described herein, and that embodiments described herein may be practiced or implemented without all of the features ascribed to them herein, as would be apparent to the skilled addressee. While specific examples of, and examples for, embodiments are described above for illustrative purposes, various equivalent modifications are possible within the scope of the technology, including variations comprising mixing and matching of features from different embodiments, as those skilled in the relevant art will recognize.

[0080] These and other changes can be made to the system in light of the above description. While the above description describes certain examples of the technology, and describes the best mode currently contemplated, no matter how detailed the above appears in text, the technology can be practiced in many ways. As noted above, particular terminology used when describing certain features or aspects of the system should not be taken to imply that the terminology is being redefined herein to be restricted to any specific characteristics, features, or aspects of the system with which that terminology is associated. In general, the terms used in the following claims should not be construed to limit the system to the specific examples disclosed in the specification, unless the above description section explicitly and restrictively defines such terms. Accordingly, the actual scope of the technology encompasses not only the disclosed examples, but also all equivalent ways of practicing or implementing the technology under the claims.

[0081] As will be apparent to those skilled in the art in light of the foregoing disclosure, many alterations and modifications are possible to the methods and systems described herein. For example:

• Methods described herein may be applied to electric distribution systems having topologies different from those of the example systems shown herein.

• Inventory zones may be defined between feeder meters. For one example, the

difference between metered readings of upstream and downstream feeder meters may be treated as readings for an inventory zone that draws electric energy from between the feeder meters. For another example, a meter reading of an upstream feeder meter may be treated as a reading for an inventory zone, and a downstream feeder meter treated as a consumer node in the inventory zone. An inventory zone defined between by feeder meters may comprise a plurality of transformers, each of which supplies electric energy to a plurality of consumer nodes.

• Measured load profile and energy consumption data (e.g,. obtained from meters) may be pre-conditioned prior to being used in methods described herein. For example, data may be modified to eliminate anomalies revealed by simple inspection of data, such as meter inversions and meter removals.

• Distribution taps may be identified or accounted by inserting dummy nodes having no "known" (e.g., metered) load or consumption at appropriate locations in a network topology, and performing methods described herein on the topology including the dummy nodes.

• Methods and techniques described herein may be modified to account for technical losses. A non-limiting example of such a modification can be posited for the case where feeder meters are used to determine energy consumption for an inventory zone is located close to a head-end substation. In this case, the load(s) downstream from the inventory zone may be large enough to cause non-trivial technical losses inside the inventory zone, which could be mistaken for non-technical losses (e.g. , theft). A dummy load equal the expected technical losses (e.g., as calculated based on downstream load and distribution line impedance) may be added to the inventory zone to account for the technical losses.

• Methods and techniques described herein may be adapted for use with distribution of fluid commodities by analogizing properties of electric energy distribution to properties of fluids. For example, some methods and techniques described herein may be adapted to detect water and natural gas theft by analogizing consumption to volume, load to flow and voltage to pressure.

[0082] While a number of exemplary aspects and embodiments have been discussed above, those of skill in the art will recognize certain modifications, permutations, additions and sub-combinations thereof. It is therefore intended that the following appended claims and claims hereafter introduced are interpreted to include all such modifications,

permutations, additions and sub-combinations as are may reasonably be inferred by one skilled in the art. The scope of the claims should not be limited by the embodiments set forth in the examples, but should be given the broadest interpretation consistent with the foregoing disclosure.