Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
TRACK CIRCUIT MECHANICAL JOINT INTEGRITY CHECKER
Document Type and Number:
WIPO Patent Application WO/2015/011529
Kind Code:
A1
Abstract:
An electrically insulating mechanical joint checker for mechanical joints (21, 22) connecting rails of following track segments (11, 12) of a railway line, each track segment forming part of a track circuit. The track segment (11,12) comprises electric signal transmitting units (3) and receiving units (4) for transmitting and receiving train presence detection signals within said track segment and/or relating communication signals between the train (7) and the track segment. The said train presence detection signals and said communication signals comprise a further joint detection signal, generated and transmitted by the transmitting units (3) and received by the receiving units (4) belonging to the same track segment (11), being the joint detection signal relating to the track segment (11) different at least in respect to the one relating to the adjacent track segments (12). The invention relates also to a method to detect a failure or breakage of a mechanical joint inside a track segment (11).

Inventors:
AISA PIER ALESSANDRO (IT)
Application Number:
PCT/IB2013/056137
Publication Date:
January 29, 2015
Filing Date:
July 26, 2013
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
ALSTOM TRANSP TECH (FR)
International Classes:
B61L1/18; B61L1/20
Domestic Patent References:
WO2010023543A22010-03-04
Foreign References:
EP0165048A21985-12-18
GB2063539A1981-06-03
EP0952065A11999-10-27
EP2216229A22010-08-11
US6779761B22004-08-24
Attorney, Agent or Firm:
KARAGHIOSOFF, Giorgio A. (Via F. Baracca 1R, Savona, IT)
Download PDF:
Claims:
CLAIMS

1. An electrically insulating mechanical joint checker for mechanical joints (21, 22) connecting rails of following track segments (11, 12) of a railway line, each track segment forming part of a track circuit,

electric signal transmitting units (3) and receiving units (4) being provided in association with each track segment (11, 12) for transmitting and receiving train presence detection signals within said track segment and/or transmitting or receiving communication signals between a train (7) and the track segment,

characterized in that

said signal transmitting units (3) and receiving units (4) are able to transmit and receive a further joint insulation integrity signal (A, B) associated to each track segment (11, 12) in order to detect the failure of the insulation of said mechanical joints (21, 22) ,

the said joint insulation integrity signal (A, B) relating to the said track segment (11) being different at least in respect to the one relating to the adjacent track segments (12) concerning to characteristic parameters uniquely identifying the joint insulation integrity signal (A, B) of each track segment (11, 12) .

2. A mechanical joint checker according to claim 1, wherein the said transmitting units (3) comprise a signal generation unit (31) to generate and to transmit the said joint insulation integrity signal and the said receiving units (4) comprise an analyzing unit (41) that compares the received joint insulation integrity signal with the one that identifies the track segment (11, 12) .

3. A mechanical joint checker according to claim 1, wherein means for setting the track circuit in a safety conditions are provided.

4. A mechanical joint checker according to claim

1, wherein the said joint insulation integrity signal is a digital signal comprising a bit coded message.

5. A mechanical joint checker according to claim

2, wherein the said transmitting units (3) comprise timing means (32) , which timing means (32) activate the signal generation unit (31) according to predetermined timing rules ,

the said train presence detection signals and said communication signals being constituted by a wave, which wave presents an amplitude maximum value and an amplitude minimum value,

the said generation unit (31) being activated by the said timing means (32) during the time interval of amplitude minimum value.

6. A mechanical joint checker according to claim 1, wherein the said joint insulation integrity signal presents a carrier frequency of 500 Hz,

the said signal generation unit (31) including means to generate carrier waves .

7. A mechanical joint checker according to claim 5, wherein the said joint insulation integrity signal is obtained by a Frequency-shift keying modulation, in which the bit with value "1" presents a carrier frequency of 525 Hz while the bit with value "0" presents a carrier frequency of 475 Hz.

8. A mechanical joint checker according to claim 4, wherein the said bit coded message is composed by 8 bit.

9. Method to detect a failure or breakage of a mechanical joint connecting rails of following track segments (11, 12) of a railway line, each track segment forming part of a track circuit,

electric signal transmitting units (3) and receiving units (4) being provided in association with each track segment (11, 12) for transmitting and receiving train presence detection signals within said track segment and/or communications signals between a train (7) and the said track segment (11) ,

characterized in that

the method provides the step of :

a) generation of a further joint insulation integrity signal by the said transmitting units (3) , which joint insulation integrity signal is associated to each track segment (11, 12),

being the said joint insulation integrity signal (A, B) relating to the said track segment (11) different at least in respect to the one relating to the adjacent track segments (12) concerning to characteristic parameters uniquely identifying the joint insulation integrity signal (A, B) of each track segment (11, 12),

b) transmission of the said joint insulation integrity signal by the said transmitting units (3) , c) reception of the said joint insulation integrity signal by said receiving units (4) ,

d) comparison of the received joint insulation integrity signal with the one that identifies the track segment by said receiving units (4) ,

the said transmitting units (3) and the said receiving units (4) belonging to the same track segment (11)

e) set of the said track segment (11) in a occupied status.

10. Method according to claim 9, wherein the said joint insulation integrity signal is a digital signal comprising a bit coded message.

11. Method according to claim 9, wherein the said train presence detection signals and said communication signals are constituted by a wave, which wave presents an amplitude maximum value and an amplitude minimum value ,

the transmission of the said joint insulation integrity signal occurring only during time interval of amplitude minimum value.

12. Method according to claim 9, wherein the said joint insulation integrity signal presents a carrier frequency of 500 Hz.

13. Method according to claim 12, wherein the step a) is obtained by a Frequency-shift keying modulation, in which the bit with value "1" presents a carrier frequency of 525 Hz while the bit with value "0" presents a carrier frequency of 475 Hz.

14. Method according to claim 10, wherein the bit coded message is composed by 8 bit.

15. Method according to claim 10, wherein the step b) comprises the step o :

bl) transmission of the said joint insulation integrity signal constituted by the bit coded message, b2) transmission of the said joint insulation integrity signal constituted by the logical complement of the said bit coded message.

Description:
TRACK CIRCUIT MECHANICAL JOINT INTEGRITY CHECKER

The invention relates to a mechanical joint checker for track circuits according to the preamble of claim 1.

The scope of the invention is to monitor rail joints in order to detect their breakage and to avoid track circuit failures and prevent derailments.

Generally speaking rail signalling systems are designed and implemented to allow the safe passage of trains throughout the railway network. Track circuits play a major role within the interlocking as they indicate the presence of a rail vehicle and can exchange data speed information with rail vehicles. Track circuits can be divided into two groups: "jointless" track circuits and track circuits separated by mechanical insulated joints, this invention is particularly directed to the second type.

These insulated joints enable isolated sections of rails to be used as part of the track circuits.

The track circuits play a vital role, and it is therefore important to be able to identify any faulty components.

In particular if a failure of a mechanical joint occurs, the track segment won't be isolated no more, causing the signal communication between the track segment and the adjacent one. Moreover adjacent rails can be no more aligned between each others causing risk of derailments.

Consequently the track circuit will be composed by track segments in communication, bringing to dangerous and unsafe situations.

First of all it is in fact imperative that a rail break can be detected in time because it could cause a significant failure, such as a derailment, especially in the case of curved track sections .

Furthermore, if a communication between two adjacent track segments occurs, the track circuit will be unable to monitor the presence of a train in a track segment due to the impossibility to detect the shunt resistance of the train axle and wrong information on speed data can be propagated to the train.

The breakage of a mechanical joint causes drawbacks not only relating to the high-frequency signals (train detection) in the track circuit, but also relating to the low-frequency signal, because trains can acquire wrong speed data.

As it can be appreciated by the discussion above, an efficient monitoring and detection of the failure of mechanical joints covers a fundamental aspect in the safety of railway track circuits.

A possible solution is disclosed in the document EP 2216229 relating to a device for monitoring an insulated joint between sections of rail comprising a monitoring arrangement for monitoring current flow between two points along a rail in the vicinity of the rail joint by measuring voltages at the two points.

The document US 6779761 describes a detection of a break in a rail by connecting the two rails together electrically with two electrical connections at opposite ends of a section of the line, causing electrical currents to flow in parallel along the two rails from a current source and detecting the currents flowing in each of the rails. From the two values of current it is possible to find if there is a break in one of the rails.

Usually the solution presented in the prior art documents relates to a method of using the effects of the changes in the track circuit introduced by the break on a testing signal .

Coded DC, or AC signals or pulsed signals are also used and they are fed to the track circuits by transmitters at one end and received by receivers at the other end of the track circuit.

Furthermore the devices and methods belonging to the state of the art provide a processing unit carrying out processing of the received signals for determining if the variations are due to a break.

Independently from the solution adopted, the known devices and methods present dedicated products to detect the breakings of mechanical joint, that must be installed in the track circuit.

The use of dedicated devices brings functional and economical drawbacks.

From a functional point of view, the addition of one or more components to the track circuit increases the possibility of failures of the track circuit and it requires more controls. The economical drawbacks are obvious since there is an increase of costs, due not only to the purchase of a specific product, but also to the maintenance required.

Therefore, there is still the need for a track circuit in which the detection of a mechanical joint failure or breakage is integrated within the train detection function itself and therefore can be detected in an efficient way, without incurring in expensive costs and/or complex configurations using specific components added to the ones belonging to the track circuit .

The present invention fulfils such need by providing a mechanical joint checker as described in the preamble of claim 1 according to the characterizing part of claim 1.

Due to the fact that the joint insulation integrity signal defines univocally the track segment to which it refers, the receiving units belonging to a determinate track segment preventively know the joint insulation integrity signal.

In particular the analyzing unit compare the values of the characteristic parameters of the joint insulation integrity signal received with the predetermined values of the joint integrity system, that defines the track segment to which the receiving units belong.

Consequently if a receiving units receives a joint insulation integrity signal different from the one relating to the track segment to which the receiving units belong, a loss of insulation occurs.

This loss of insulation can be imputed to the failure of one of the mechanical joints relating to the track segment.

As usual when such condition appears, an alarm signal can be sent to remote operating unit and automatically the track segment is put in a safety condition, in occupied status.

For this reason, according to a preferred embodiment, means for setting the track circuit in a safety conditions are provided.

As it clearly appears, the solution presented is fully integrated in the track circuit components, because the joint insulation integrity signal is generated and transmitted by the transmitting units and received by the receiving units.

The invention solves the safety hazard related to failures and breakings of insulated mechanical joints and it can detect such breakings in all conditions, with all codes injected on it.

Furthermore the invention removes in an efficient way the safety hazard related to failures of power supply that can lead to an undetected train axle on track circuit products, by use an additional super imposed frequency to detect the breaking of the mechanical joints.

The unique correspondence between each track segment and a corresponding joint insulation integrity signal avoid errors in the detection of a failure of mechanical joints.

Consequently, according to the described con iguration, in order to declare clear, no absence of train or the like, a track segment and to generate signals to be transmitted to the train, the mechanical joint checker of the present invention, will look not only at the nominal signal coming from the track segment, but also will look at an additional superimposed frequency, in order to discriminate the breaking of the mechanical joint.

In respect of the prior art documents and solutions disclosed, the track circuit of the present invention do not requires traditional measurements or processing of the signals for determining the break, such as comparison with thresholds or the like, but the invention automatically avoids errors in the transmission of messages to trains due to joint breaks between two adjacent blocks.

The aim of the following features described and of the possible embodiments of the mechanical joint checker belonging to the present invention is to improve the detection of the joint insulation integrity signal, avoiding distortion of the same and also avoiding that the frequency signals currently transmitted in the track segment are disturbed by the transmission of the joint insulation integrity signal.

According to a further embodiment, the transmitting units comprise a signal generation unit to generate and to transmit the said joint insulation integrity signal and the receiving units comprise an analyzing unit that compares the received joint insulation integrity signal with the one that identifies the track segment.

Advantageously the joint insulation integrity signal is a digital signal comprising a bit coded message .

In this case the analyzing unit will compare the values of the bits of the message received with the ones that defines the track segment to which the receiving units belong.

The choice of the modulation and of the additional frequency is made by guarantying that will not be interpreted by trains on-board equipment and that will be immune versus noises produced by trains or substations.

According to an improvement of the present invention, the transmitting units comprise timing means, which timing means activate the signal generation unit according to predetermined timing rules.

This timing rules are determined in order to maintain at the lowest level the tension spikes of the entire system.

In fact the train presence detection signals and communication signals are constituted by a wave, which wave presents an amplitude maximum value and an amplitude minimum value.

The generation unit is activated by the timing means during the time interval of amplitude minimum value. This important feature allows to decide when the joint insulation integrity signal is generated, setting the timing rules in the desired manner.

Preferably the joint insulation integrity signal presents a carrier frequency of 500 Hz, including the signal generation unit means to generate carrier waves.

This frequency don' t present disturbs created both by the other frequency signals and by the train that transit in the track segment.

According to another embodiment, the joint insulation integrity signal is obtained by a Frequency- shift keying modulation, in which the bit with value "1" presents a carrier frequency of 525 Hz while the bit with value "0" presents a carrier frequency of 475 Hz .

This modulation and the choice of the two carrier frequencies is due to the necessity to simplify the design features, maintaining an efficient detection and reception of the joint insulation integrity signal.

The FSK (Frequency-shift keying) modulation of the joint insulation integrity signal, according to the present invention, presents preferably a modulation index equal to 1 , in order to reach a bit-rate equal to the frequency deviation.

The difference between the carrier frequency of the bit with value "1" and the carrier frequency of the bit with value "0" is 50 Hz, so the joint insulation integrity signal will be transmitted with a bit rate equal to 50 bit/sec. The result achieved with this important feature is a "clean" emission spectrum that allow an efficient reconstruction of the signal, avoiding distortion of the same .

Furthermore, due to the chosen values, the passage from the bit with value "1" to the bit with value "0" corresponds to a zero of the sinusoid, which consequently don't present phase discontinuity.

The aim is to simplify the configuration of the track circuit and above all of the power amplifiers belonging to it.

Advantageously the joint insulation integrity signal is a bit coded message composed by 8 bit.

The number of bit that identifies the signal of interest has been chosen in order to obtain a compromise between the total length of the message and the range of time in which the message is transmitted.

A message composed by 8 bit can be transmitted in a quite short time and 8 bits allow to create a certain number of messages that presents an Hamming distance equal to 3, as described below, between two messages belonging to the same track segment, which has to be compared .

Consequently in this case the 8 bit messages maximize the difference between them and they minimize the errors in the detection of the correct code.

The present invention relates also to a method to detect a failure or breakage of a mechanical joint connecting rails of following track segments of a railway line, each track segment forming part of a track circuit.

Each track segment presents electric signal transmitting units and receiving units for transmitting and receiving train presence detection signals relating within said track segment and/or relating communication signals between the train and the track segment.

The method provides the step of :

a) generation of a further joint insulation integrity signal by the transmitting units, which joint insulation integrity signal is associated to each track segment. The joint insulation integrity signal relating to the track segment is different at least in respect to the one relating to the adjacent track segments, concerning to characteristic parameters uniquely identifying the joint insulation integrity signal of each track segment;

b) transmission of the joint insulation integrity signal by the transmitting units;

c) reception of the joint insulation integrity signal by the receiving units;

d) comparison of the received joint insulation integrity signal with the one that identifies the track segment by the receiving units.

e) set of the said track segment (11) in a occupied status .

The transmitting units and the receiving units belong to the same track segment.

Therefore each track segment is identified with a different joint insulation integrity signal, if the receiving units receive a joint insulation integrity signal relating to a track segment different from the one they belong, it means that a loss of insulation happened in the track segment.

Preferably the joint insulation integrity signal is a digital signal comprising a bit coded message.

It is also possible to set the rules of the comparison between two following joint insulation integrity signal received by the receiving means.

For example one of the possibility is to set the comparison with the parameter of the distance of Hamming .

In a preferred embodiment one joint insulation integrity signal is identified as identical to the following joint insulation integrity signal when less the three bit of the first one are different in respect of the second one, e.g. when the distance of Hamming is equal to 3.

According to a further improvement the train presence detection signals and communication signals are constituted by a wave, which wave presents an amplitude maximum value and an amplitude minimum value, the transmission of the joint insulation integrity signal occurring only during time interval of amplitude minimum value.

Usually in track circuits two frequency modulations are usually applied to alternate currents, at 50 Hz and 178 Hz, to allow transmission of a larger number of codes, thereby improving safety by providing more complete information to the trains, in a shorter time .

All the carrier frequencies are modulated ON/OFF, each speed code to be transmitted inside the track circuit is identified by a period of presence of a predetermined frequency and by a period of absence of the said frequency.

The transmission of the joint insulation integrity signal is done in the period of absence of other signals, in order to maintain at the lowest level the tension spikes of the entire system and in order to do not generate disturbs on the transmission lines.

According to a preferred embodiment the joint insulation integrity signal presents a carrier frequency of 500 Hz.

The choice of 500 Hz permits to operate in a range of frequencies compatible with the maximum noises admitted by the trains or similar.

As described above, the step a) is obtained by a Frequency-shift keying modulation, in which the bit with value "1" presents a carrier frequency of 525 Hz while the bit with value "0" presents a carrier frequency of 475 Hz.

Advantageously the joint insulation integrity signal is a bit coded message composed by 8 bit.

Due to the fact that the transmission of the joint insulation integrity signal according to the present invention is done during the "OFF" period of the other signals, the 8 bit messages presents a length easy to be entirely transmitted in this range of time. According to another embodiment, the transmission of the joint insulation integrity signal comprises the step of :

bl) transmission of the joint insulation integrity signal constituted by a bit message,

b2) transmission of the said joint insulation integrity signal constituted by the logical complement of the said bit message.

This improvement makes the message more dynamic and it avoid errors in the detection of the signal, because the receiving units expect to receive cyclically the 8 bit message and its logical complement: no external disturb or event can reproduce this sequence, corrupting the detection relating the status of the mechanical joints.

As it appears clearly form the description above in order to identify the integrity of each mechanical joint the system uses three different parameters, the message sent must be the correct one, the carrier frequency must be the correct one and also the sequence of the messages must be the correct one.

These and other characteristics and advantages of the invention will be more apparent from the following description of a few embodiments shown in the accompanying drawings, in which:

fig. 1 shows one of the possible embodiments of a track circuit according to the prior art;

fig. 2 shows a possible scenario in the case of a failure of a mechanical joint; fig. 3 shows one of the possible embodiments of the present invention.

Figure 1 shows a electrically insulating mechanical joint for track circuits according to the prior art for railway systems or the like, comprising a track segment 11 of predetermined length, which segment comprises at least two rails 111 and 112,

The track segment 11 is electrically insulated from adjacent segments 12, comprising at least two rails 121 and 122, by mechanical joints 21 and 22.

The joints 21 and 22 connect together each rail 111, 112 of the track segment 11 with a corresponding rail 121, 122 belonging to adjacent track segments 12 at the ends of each track segment.

Each track segment 11 and 12 presents electric signal transmitting units 3 and receiving units 4 for transmitting and receiving train presence detection signals within the track segment 11 and/or communication signals between a train 7 and the track segment.

The track circuit illustrated in figure 1 and belonging to the prior art presents two further means , respectively a joint integrity transmitter 41 and a joint integrity receiver 42 to detect the integrity of the mechanical joints 21 and 22.

The integrity joint transmitter 41 inject a dedicated frequency versus the couple of mechanical joints 21 and 22, received by the joint integrity receiver 42. If the mechanical joints 21 and 22 break the receiver 42 will detect it. As described above the track circuits belonging to the prior art requires additional means, such as, in this case, joint integrity transmitter 41 and joint integrity receiver 42, incurring in further costs and requiring to modify the configuration of the track circuit .

The possible scenario in the case of a failure of a mechanical joint is illustrated in figure 2.

A train 7 with its axles enters in the track circuit 12 and the receiver 4 connected to that track circuit, senses the shunt resistance of the train 7 and correctly put the track segment in occupied status.

In the same moment a breaking of the mechanical joint 21 occurs.

The train 7 receives the codes that is propagating from track segment 11 to track segment 12 due to the loss of insulation of the mechanical joint 21.

Figure 3 shows how the mechanical joint checker for track segments according to the present invention detect the failure of a mechanical joint.

The signals circulating in the track segments 11 and 12 comprise a further joint insulation integrity signal A, B associated to each track segment 11, 12 in order to detect the failure of the insulation of the mechanical joints 21, 22.

The joint insulation integrity signal A relating to track segment 11 is different, concerning to characteristic parameters uniquely identifying the joint insulation integrity signal of each track segment, to the integrity signal B relating to the track segment 12.

The joint insulation integrity signal A is generated and transmitted by the transmitting units 3 belonging to the track segment 11 and it is received by the receiving units 4 belonging to the track segment 11.

The joint insulation integrity signal B is generated and transmitted by the transmitting units 3 belonging to the track segment 12 and it is received by the receiving units 4 belonging to the track segment 12.

The transmitting units 3 comprise a signal generation unit 31 that generates the signals circulating in the track segment 11.

Because signals A and B are di erentiated, if the mechanical joints 21 or 22 break both the receivers of track segment 11 and 12 detect the breaking of the mechanical joints 2or 22.

In particular the receiving units 4 belonging to the track segment 11 "knows" the joint insulation integrity signal A transmitted by the corresponding transmitting units 3, and therefore if it receives a signal different from A or an attenuated one, it means that a loss of insulation occurs due to the failure of one of the mechanical joints 21 and 22.

Means for setting the track segment in a safety condition are provided.

As usual when such condition appears, an alarm signal can be sent to remote operating unit and automatically the track segments 11 and 12 are put in occupied status.

The receiving units 4 comprise an analyzing unit 41 which compares the received joint insulation integrity signal with the one that identifies the track segment 11.

The analyzing unit 41 in particular compares the characteristic parameters of the received joint insulation integrity signal with predetermined values.

The characteristic parameters analyzed are the amplitude, carrier frequency, modulation frequency and bit message content of the received signal.

The predetermined values can be set on the base of a joint insulation integrity signal A not corrupted or attenuated.

Also the discriminant to evaluate the difference between one signal and the following one can be set.

As described above, in the case the joint insulation integrity signal is a bit coded message, a message can be identified as different in respect of a following message if the second one presents a Hamming distance equal to 3 in respect of the first message.

The same consideration is valid relating to track segment 12.

Preferably the joint insulation integrity signals

A and B are digital signals comprising a bit coded messages .

According to a possible embodiment of the present invention, the joint insulation integrity signal presents a carrier frequency of 500 Hz, the said signal generation unit 31 including means to generate carrier waves .

An improvement of the present invention provides that the joint insulation integrity signals A and B are obtained by a Frequency-shift keying modulation, in which the bit with value "1" presents a carrier frequency of 525 Hz while the bit with value "0" presents a carrier frequency of 475 Hz.

Advantageously the joint insulation integrity signals A and B are bit coded messages composed by 8 bit.

Furthermore, with 8 bit messages it is possible to create different type of messages according to the configuration of the track segment.

For example if the track segments are disposed like the ones of figure 3, it will be sufficient to provide a sequence like A-B-A-B.

If there is the need of another couple of mechanical joints, due to a ramification of the track segment 11, it will be sufficient to use another bit message C different from A and B.

With a double ramification of the track segment 11 another message D will be required.

As clearly appears from the figures the mechanical joint checker of the present invention brings to the realization of a method to detect a failure or breakage of a mechanical joint 21 or 22 inside a track segment.

This method provides the step of :

a) generation of a further joint insulation integrity signal A, B by the transmitting units 3 b) transmission of the joint insulation integrity signal A,B by the transmitting units 3

c) reception of the joint insulation integrity signal A, B by the receiving units 4,

d) comparison of the received joint insulation integrity signal with the one that identifies the track segment

e) set of the said track segment 11 in a occupied status .

As previously described, the message A is transmitted by the transmitting units 3 belonging to the track segment 11 and it is received by the receiving units belonging to the track segment 11.

According to a preferred embodiment the train presence detection signals and the communication signals are constituted by a wave, which wave presents an amplitude maximum value and an amplitude minimum value, the transmission of the joint insulation integrity signal occurring only during time interval of amplitude minimum value.

In this case according to a preferred embodiment the transmitting units 3 comprise timing means 32, which timing means 32 activate the signal generation unit 31 according to predetermined timing rules.

One of the possible timing rules is the one above described, e.g. activating the generation unit during the time interval of amplitude minimum value.

The timing means allow to control the timing of the transmission of the joint insulation integrity signal A, B. Furthermore the transmission of the joint insulation integrity signal A,B comprises the step of: bl) transmission of the joint insulation integrity signal A, B constituted by a bit message,

b2) transmission of the joint insulation integrity signal constituted by the logical complement of the said bit message.

In this case it is possible to provide logic control units that control and set the generation of the joint insulation integrity signal.