Document |
Document Title |
JP2024007187A |
An object of the present invention is to safely and smoothly deal with a case where a portion of a plurality of wires supporting a work unit that performs work at height is broken. [Solution] A work unit control system includes a first c...
|
JP2024005983A |
An object of the present invention is to provide a technology that allows easy access to equipment including single-use members. [Solution] A working structure of the present disclosure is provided in a working space where equipment carr...
|
JP2024003987A |
An object of the present invention is to provide a suspended scaffold assembly method that simplifies the structure and significantly increases the efficiency of the suspended scaffold assembly work. [Solution] There is an existing suspe...
|
JP7414769B2 |
To provide an installation tool that can simply install an installation stand or a scaffold.An installation tool includes a base part arranged along the horizontal direction when the installation tool is installed on a wall surface, a fi...
|
JP3245221U |
[Problem] To provide a downstairs work vehicle that can construct the substructure of a temporary pier without using any scaffolding equipment such as fixed scaffolding designed for each site, which has been used in the past. [Solution] ...
|
JP7410697B2 |
To provide a construction method which can surely perform scatter curing of joint parts between an outer peripheral column and outer peripheral beams.A column side curing unit 10 having such a width in a horizontal direction as to cover ...
|
JP2024000601A |
[Problem] To improve work efficiency and reduce man-hours. [Solution] A construction method for a reinforced concrete building having a steel stairway installed in a stairway and a reinforced concrete frame that partitions the stairway i...
|
JP7409780B2 |
To provide a suspension tool for suspension scaffold which can be installed with simple constitution without working of an object to be installed and can enhance versatility to the object to be installed, and a suspension tool.A suspensi...
|
JP7408173B2 |
|
JP7407222B2 |
|
JP2023184204A |
To provide a scattering prevention cure system which is relatively a light-weight and can be easily replaced by releasing a connection part and having a lifting device for supporting a scattering prevention curing body support body in an...
|
JP7400391B2 |
To provide a formwork device and an automatic formwork installation system capable of saving labor while maintaining high accuracy.A formwork device includes a concrete formwork placed facing the side of the planned concrete placement ar...
|
JP7397723B2 |
To improve maintainability in a building girth part structure.A girth 60 extended along outer wall panels 18, 40 is detachably engaged with a connection member 44. A holding part 44D of the connecting member 44 can hold a wall tie materi...
|
JP2023174034A |
To achieve both positioning control and tension control.A mobile control device 1 comprises: a torque calculation unit 2 that receives information regarding the moving target of a moving object 8 and provides a control signal to a winch ...
|
JP2023172160A |
To provide means that contributes to improvement in the efficiency of fixing work for a suspended scaffold.The present invention relates to a method for installing a suspended scaffold, which comprises: fitting by insertion a hook X3 hav...
|
JP7390812B2 |
To provide a scaffold capable of safely and easily opening a space where a working floor in a projecting state is installed.In a scaffold 1 having a working floor 3 attached to a column 12 and used in a projecting state projecting from a...
|
JP2023170016A |
To provide a suspended scaffold assembling method remarkably heightened in assembling work efficiency of a suspended scaffold.Multiple cables 5 are suspended and fixed to lower flanges 2a of a pair of flange members 2 by a worker A of a ...
|
JP2023170017A |
To provide a mobile apparatus that can move smoothly and reliably in a predetermined direction even when a shape of a structure changes midway.A mobile apparatus is configured to fix an upper stage rail 17 which is a first mobile member ...
|
JP2023165269A |
To provide a suspending jig for a hanging scaffold that can easily and quickly suspend a high safety hanging scaffold.A suspending jig 1 for a hanging scaffold suspending a hanging scaffold 4 held between two beams provided in parallel c...
|
JP3244542U |
An object of the present invention is to provide an inspection device for a flexible bracket for a solar power plant, which has a simple structure, is easy to attach and detach, and has a short construction time. The flexible bracket ins...
|
JP7374753B2 |
To provide a storage type scaffold capable of being stored compactly.A storage type scaffold in one embodiment includes: a base portion fixed to a pole upwardly extending from a ground surface; a rotation shaft supported by the base port...
|
JP2023159523A |
To provide a wind power blade inspection device capable of performing maintenance work such as coating and repair of an outer peripheral surface of a blade of a wind power generator.In a horizontal shaft type wind power generator compose...
|
JP2023159863A |
To provide a bracket for a work floor which can be stably installed by a window frame.A bracket 2 for a work floor includes: a first bracket 10 which includes a first body arm 11 extending toward an outdoor side from an indoor side on a ...
|
JP2023158875A |
To provide a device for preventing falling in a pipe that can move smoothly inside a pipe line that consists of multiple pipe bodies and is arranged at an angle, can be easily and securely fixed at a desired position, and has excellent s...
|
JP2023158876A |
To provide scaffolds for work in pipe excellent in safety and allowing detachment on temporary stairs installed in an obliquely placed pipe line to be easily carried out, and moveable scaffolds for work in the pipe easily installed at a ...
|
JP7364264B2 |
|
JP2023149636A |
To provide an unloading device capable of saving labor required for unloading.An unloading device 20 has: a loading platform 24 that is movably supported in a vertical direction by a column 22 extending in the vertical direction; a first...
|
JP2023146252A |
To provide a method for installing a support frame that does not require a large work area around a building to be constructed, can be easily and inexpensively installed with almost no fastening work, and can be used for construction on ...
|
JP2023140932A |
To reduce man-hours when working on inclined planes.A mobile scaffold for inclined surfaces 100 includes a scaffold frame 10 having a pair of main frames 11 and a plurality of subframes 12, and a first traveling portion 20 that can move ...
|
JP7354859B2 |
To provide an attachment metal fitting for a scaffold capable of easily changing a position of the attachment metal fitting at a floor material end.An attachment metal fitting 150 comprises a cylindrical body 151 having a first open hole...
|
JP3243939U |
An object of the present invention is to provide a connecting member for a suspended scaffold that can reduce the gap between scaffold boards while using a simple structure. [Solution] A connecting member 2 used by being placed in the ga...
|
JP7350535B2 |
To protect a lower part of a bridge from a corrosive environment and to efficiently inspect the lower part, sides, and upper part of the bridge.A scaffolding 100 for bridge inspection comprises: a first scaffolding panel 10 arranged usin...
|
JP7347452B2 |
To provide a securing structure for a column and a securing method for the column requiring no arrangement of fire curing under a scaffold board and no other temporary scaffolds when a column for a handrail and like and allowing the colu...
|
JP7345425B2 |
To obtain a spandrel wall scaffolding device that can provide a scaffolding even in a narrow area.A spandrel wall frame constituting a skeleton of a spandrel wall 16 is also used as a spandrel wall scaffolding device 10. Particularly, th...
|
JP2023128713A |
To provide a horizontal adjustment mechanism of a scaffold for a cavity facility that can smoothly install upper layer scaffold blocks so as to be in a horizontal state when installing it.The present invention relates to a horizontal adj...
|
JP3243672U |
[Problem] A mobile type used for shield tunnels that facilitates construction work, reduces work safety risks and construction difficulty, ensures smooth progress of each construction process, improves work efficiency, and shortens const...
|
JP3243674U |
[Problem] To provide a sliding cart for reversing a platform for a large storage tank, which ensures safety, improves work efficiency, reduces costs, and shortens construction time. [Solution] It is used for construction on a wall plate ...
|
JP3243678U |
[Problem] The present invention provides an inspection and maintenance lifting device for a wind power generation tower that allows a small number of workers to assemble and lower a lifting cage constructed on one rack rail and two guide...
|
JP7339195B2 |
To provide a method for selecting a temporary scaffold that is provided in a super-high-rise building which completes a repair work in a scheduled construction period and can reduce a cost.A method for selecting a temporary scaffold inst...
|
JP2023123249A |
To provide an unloading device that can stably transport materials to a high place without swaying back and forth from side to side, even when materials necessary to assemble scaffolding are placed on it, and to prevent materials, etc. f...
|
JP2023120013A |
To provide a lifting device capable of accurately comprehending abnormalities based on the operating state of the lifting device and advantageous for stable and efficient operation of the lifting device.A lifting device 14 includes an op...
|
JP2023120016A |
To provide a lifting device which is advantageous for suppressing increase in facility cost while enabling remote operation of the lifting device and manpower saving in a site.An operation state detection part 28 for detecting an operati...
|
JP2023120022A |
To provide a control program of a lifting device capable of accurately understanding abnormalities based on the operating state of the lifting device and advantageous for stable and efficient operation of the lifting device.A lifting dev...
|
JP2023117754A |
To provide a hanging scaffold which can be built by moving members constituting the scaffold downward from above.A hanging scaffold includes a beam joint 200 for connecting a plurality of deck beams 300. At an end of the deck beam 300, a...
|
JP2023117759A |
To safely dispose a panel member in a desired position when deck beams constituting a hanging scaffold are joined so as to be turned.A hanging scaffold includes a beam joint 50 which connects a first deck beam 21 and a second deck beam 2...
|
JP2023117755A |
To provide a compact and strong scaffold with a high degree of freedom while using a light-weight member.A suspension scaffold 1 comprises a plurality of deck beams 20-35 coupled so as to be in a rectangular shape in a plan view. The dec...
|
JP7332426B2 |
To provide a pipe for a scaffold capable of increasing bending strength without increasing an outer diameter size and reducing an increase in weight, and the scaffold using the same.A scaffolding pipe 20 is composed of an outer pipe 21 f...
|
JP7325048B2 |
To provide a panel-like structure that can be reduced in weight while maintaining required bending strength and rigidity, and a suspension scaffold using the same.A panel-shaped structure according to one embodiment comprises a hollow bo...
|
JP7324501B2 |
To provide a connecting fitting which can be utilized as means for connecting a suspended scaffold temporarily installed in an inspection and maintenance work site such as a bridge in the longitudinal direction.Two pipe clamps 1A and 1B ...
|
JP7324176B2 |
To install a scaffold for constructing a top slab when erection of the scaffold from a floor surface is difficult, due to close setting of a tank 301 and a wall body 401.A scaffold unit 101 is set in a first stored attitude 101-Q, by fol...
|