Document |
Document Title |
JP2020180463A |
To make a scaffold connection tool easily attached to a flange of a post and to prevent falling of a wedge member after attachment.A scaffold connection tool comprises: a box-shaped body portion 2; and a wedge member 3 stored in the body...
|
JP3228703U |
To perform an operation for unfastening a belt when disassembling a scaffold in a belt fastening unit incorporated in a scaffold plate fixing device used when assembling a temporary work scaffold under a bridge, using a rod-shaped tool s...
|
JP6781454B2 |
To provide a scaffold board connector capable of easily connecting a scaffold board, and capable of removing only a partial scaffold board after connection.A constitution of a connector 1 comprises a connector body 10, at least a pair of...
|
JP3228209U |
To change the position of a connecting pipe or a connected pipe by connecting the connected pipe and the connecting pipe so as to be perpendicular to each other while maintaining a certain level of strength even if it is a simple operati...
|
JP6768023B2 |
To provide a device for preventing assembly material from coming out in a wedge binding type scaffold that can be easily manufactured.The present invention is directed to a device for preventing assembly material from coming out in which...
|
JP2020159134A |
To provide a method of constructing a building that enables work on a stable scaffold.The method includes: a scaffold installation step of installing a scaffold 1 along an outer circumference of a construction range of a building 5 and p...
|
JP6759391B2 |
To provide a temporary scaffold connection structure capable of fixing a connection pipe at uniform length by restricting poor appearance and strength degradation of a welding portion with the connection pipe.In the structure where a con...
|
JP2020139301A |
To provide a gable-side preceding balustrade capable of reducing the number of components and suppressing a unit cost and production cost.A gable-side preceding balustrade 10 of the present invention comprises: an upper balustrade 20; a ...
|
JP2020139388A |
To improve a workability of a temporary floor material removal work for removing a temporary floor material erected or suspended between horizontal members by a gripping metal fitting and to reduce a burden or a load on the work of an op...
|
JP6749618B2 |
To provide a member for a temporary scaffold capable of enhancing workability of assembly and removal, and simply manufacturable.A member 1 for a temporary scaffold comprises a pair of wedge cutouts 5 and 6 fixed by a wedge member 4 to a...
|
JP6751172B2 |
|
JP6749600B2 |
To provide a preceding handrail that facilitates fitting work especially to a connection receiving part at a high location on a support post.A preceding handrail 1 has a connection receiving part 83 provided at a prescribed interval in a...
|
JP6746551B2 |
To provide a temporary scaffold capable of preventing, so to call, pull-out such that connected support members are pulled out due to an external force when support members are connected to each other in series in the vertical direction ...
|
JP6741817B1 |
To provide a good workability when fixing a scaffold plate, and to enable an operator to work safely and with peace of mind on the scaffold. A fixture of an embodiment includes an upper metal fitting, a lower metal fitting, and a lock me...
|
JP6738451B1 |
To complete the attachment work of all members from the lower side of a scaffold plate in a scaffold plate fixture. An upper member A, a lower member B, and a bolt C for fastening the scaffold plate X are formed, and a holding portion 10...
|
JP6734828B2 |
To provide a support member for temporary scaffold capable of connecting a support member in a vertical direction in series without using relationship between tenon and tenon.A support member for rooting 1 comprises: a support body 2 hav...
|
JP6729881B2 |
To provide a fastening device for fastening a column and a joint member to each other for a scaffold.In a fastening device pressed-abutting a tip fastening part of a joint fixture to a surface of a column by press-fitting a wedge piece b...
|
JP6726975B2 |
To provide a baseboard device mounted along a side part in the girder direction of a scaffold board faced to an outside space from a work space of a scaffold construction body.A baseboard device is the baseboard device positioned in both...
|
JP6723364B2 |
An apparatus for fixing a scaffold plank for a scaffold is disclosed. One embodiment of the disclosed apparatus for fixing a scaffold plank for a scaffold is an apparatus for fixing a scaffold plank for a steel pipe scaffold for a scaffo...
|
JP6716508B2 |
To provide a novel structure capable of eliminating hammering work and eliminating the impact sound, and smoothly connecting an end of one cylindrical bar to the other columnar bar.A fixing metal fitting 10 is provided on a column 1, a r...
|
JP6713599B1 |
To provide a morning glory device which can be installed adjacent to two anti-building side portions constituting a protruding corner of a wedge-tied scaffold without using a mounting bracket dedicated to the protruding corner. A morning...
|
JP6709921B1 |
To reduce a gap between a scaffolding plate and an outer wall surface and a gap between adjacent scaffolding plates when scaffolding plates are provided so as to line up along a curved outer wall surface. A scaffolding plate 1 is adjuste...
|
JP6703392B2 |
To provide a seismic control clamp capable of improving energy absorption performance, and a temporary structure.A seismic control clamp 10 having a seismic control function of absorbing seismic energy is configured by coupling two clamp...
|
JP6695152B2 |
To provide an attachment metal part for a kick plate, where the kick plate is arranged along an edge near end part of a passage floorboard in a vertical posture, that is, a gap between the kick plate and the passage floorboard is reduced...
|
JP6695545B1 |
To provide a binding device in a wedge binding type scaffold capable of smoothly performing binding and releasing work and binding work at the time of packing by holding an unlocked wedge at an appropriate position. , Provide an unlocked...
|
JP6689073B2 |
To provide a scaffold board fixing device that enables firm anchoring force of a scaffold board and that facilitates attaching and removing work.A scaffold board fixing device that fixes ends of a plurality of scaffold boards 2 arranged ...
|
JP6685630B1 |
To provide a scaffolding plate capable of preventing an object from falling when connecting to each other. The scaffolding board 1 is a rectangular scaffolding board main body 4 having a long side 2 and a short side 3, a first connecting...
|
JP6683877B1 |
To propose a cloth frame with a floor which can eliminate a gap formed between a horizontal member and a beam and can suppress a fallen deformation of a gripping metal fitting without using an extra member. An upper flange, a lower flang...
|
JP6676363B2 |
To avoid a connection member, for connecting a horizontal material to a post by using a wedge, from being loosened from the post in a case of pulling out of the wedge, at an intersection part with the horizontal material connecting the p...
|
JP6671878B2 |
To provide a member for a temporary scaffold capable of enhancing workability of assembly and removal, and simply manufacturable.A member 1 for a temporary scaffold comprises a pair of wedge cutouts 5 and 6 fixed by a wedge member 4 to a...
|
JP3225550U |
To provide a single pipe connecting jig which is lightweight and robust and can efficiently perform a single pipe connecting work. A connecting jig has a cylindrical first member 10 having an inner diameter capable of inserting a single ...
|
JP2020033725A |
To provide a scaffold panel for a temporary scaffold and a stacking structure thereof that inhibit coupling tools of a plurality of scaffold panels from interfering with each other when the scaffold panels are vertically stacked even whe...
|
JP2020033726A |
To provide a scaffold panel connector that even when a horizontal member of a scaffold panel held by holding means is a circular cross section member, inhibits the holding means from rotating around the circular cross section member.A co...
|
JP3225284U |
To provide a pipe clamp used for assembling a temporary work scaffold at a construction site. In a pipe clamp composed of a receiving member 2, a holding member 4, and fastening bolts and nuts 6, 7, a bottom plate portion 9 in a wide reg...
|
JP6648059B2 |
To provide a scaffold beam frame capable of exerting the function of a connecting pin as required without using the connecting pin as a separate member.A connecting pin 20 that can be exposed at the upper end side of a support 10 is stor...
|
JP2020023804A |
To provide a lock device for preventing the upward movement of a jaw fitting in a tightened state in a wedge binding device used for a scaffold or the like.In a wedge binding device, a jaw fitting (12) fixed to a connecting member is pla...
|
JP2020023780A |
To provide a packaging box capable of surely holding a flap in a state of folded outward a barrel part, and having a lock piece hardly hindering work.A connector 3 of a rectangular industrial sheet 2 covers scaffolding 1 of a constructio...
|
JP2020023856A |
To provide a scaffold assembly device which is easily used in a work of assembling a small-scale temporary scaffold and is more safe.A scaffold assembly device includes a fixed member 11 fixed to an erected installed pipe, a rotary membe...
|
JP2020020126A |
To provide a wedge binding device used in a scaffold such as a temporary scaffold.In a wedge binding device in a scaffold, a wedge member (17) is inserted from above to below and driven from a standby position (P1) to a binding position ...
|
JP2020020170A |
To provide a joint device allowing a column and a lateral stay to be easily assembled while strength of a scaffold structure is maintained.A joint device is provided to connect a column and a lateral stay. The column includes a column bo...
|
JP6638895B2 |
|
JP6634238B2 |
|
JP2019218776A |
To improve the convenience in positioning work between a horizontal member and a vertical member constituting a temporary structure such as a scaffold or supporting.A fixture A disposed between a horizontal member B and a vertical member...
|
JP6616633B2 |
|
JP3224040U |
To provide a height-adjustable bracket capable of easily attaching and detaching a bracket and easily extending the height of an existing support device, and a support device using the bracket. A support pipe, a male screw portion 101 pr...
|
JP6608149B2 |
|
JP6602281B2 |
|
JP6589240B2 |
|
JP6590229B2 |
|
JP6586333B2 |
|