Document |
Document Title |
JPH10506343A |
PCT No. PCT/EP90/03541 Sec. 371 Date Mar. 17, 1997 Sec. 102(e) Date Mar. 17, 1997 PCT Filed Sep. 7, 1995 PCT Pub. No. WO96/08706 PCT Pub. Date Mar. 21, 1996A low cost and rugged apparatus for assessing damage to a ship's hull. Parallel o...
|
JP2572392Y2 |
|
JP2754901B2 |
PURPOSE:To improve manpower saving and an operation rate by reading pertinent cash to be loaded from a schedule storing part based on calendar data, executing a supplementing and recovering operation in a preliminarily decided timing, an...
|
JP2572061Y2 |
|
JP2754745B2 |
In a remote maintenance system for automated teller machine comprising an automated teller machine for performing automatic transaction of cash and a supervisory arrangement for remotely supervising the automated teller machine, imaging ...
|
JPH10116364A |
To easily and efficiently generate the production plan of lubricant while the burden of a person in charge of a plan is reduced by providing a simulation means for simulating a provisional plan generated by means of a provisional plan ge...
|
JP2746860B2 |
|
JPH10113457A |
To provide an alarm generation device in which a player can specify and input a setting condition to end a game in advance, and when the setting condition is met during the game, a display and an alarm securely inform the player that the...
|
JPH10111963A |
To confirm and check the expected date of the final completion of a product by calculating completion periods of an ordered article by operation processes and also calculating the cumulative value of standby times between the respective ...
|
JP2742779B2 |
|
JP2742490B2 |
|
JP2568761Y2 |
|
JP2568760Y2 |
|
JPH1097657A |
To provide the method and device for generating working plan by which the placement of workers can be appropriately adjusted correspondingly to the fluctuation of the number of parts to be packed on each packing line of a physical distri...
|
JPH1094947A |
To supply proper amount of parts timely while interlocking to the real progress state of a production field and reducing a carrying man hour. When POP(POINT OF PRODUCT) server 6 catches a real progress state by POP terminals 7 of product...
|
JP2738732B2 |
Measurement of a physical property such as coercive force of a member to be inspected is performed at a plurality of locations in one region of the member. Similar measurement is performed in a plurality of different regions of the membe...
|
JPH1082702A |
To realize an accurate measurement of load by detecting effective power consumption of an AC three-phase asynchronous motor based on the measurements of current and voltage and then comparing the effective power consumption with a refere...
|
JP2729682B2 |
|
JP2729687B2 |
|
JP2727139B2 |
A device for analyzing working hours, which can measure and store working hours of an injection molding machine for each working status and automatically analyze working hours. Said device detects a working status of the injection moldin...
|
JP2726909B2 |
|
JP2564236Y2 |
|
JP2718561B2 |
PURPOSE:To take in the operation information of each machine tool without missing and perform accurate analysis of the operation information by storing in memory the operation information which a sequencer generated after the previous ru...
|
JPH1055497A |
To provide a fault predicting method, a control unit and a load control system using this method which predicts the endurance life of a load flexibly and speedily corresponding to the construction of system environment constituted by con...
|
JPH1049716A |
To easily perform installation to an industrial machine, to recognize and prove precise operation time by installing a time measurement unit, recording the time of engine start and engine stoppage, performing transfer to a dedicated base...
|
JP2712833B2 |
PURPOSE:To quickly conduct restoration at the time of failure by collecting history data on equipment on the factory side, by transmitting the collected history data to a support station at the time of the failure and by analyzing the ca...
|
JP2712834B2 |
|
JPH1040309A |
To make it possible to speedily know the progress state at the time of checking it by sending work progress information on occasion from a terminal equipment installed in each section to each terminal through an on-line based on a manage...
|
JP2711854B2 |
|
JP2704470B2 |
PURPOSE: To manufacture a casting product accepted to the allowable quality standard in high yield by executing the decision of acceptance in the casting product and the decision of abnormality in the casting process with a computer in t...
|
JP2697621B2 |
A signal disconnection detection apparatus includes a first counter, a first comparator, and a detector. The first counter is reset by a pulse signal received every predetermined period of a clock signal, and counts a clock signal transm...
|
JPH09330434A |
To provide an error information storing processor capable of elucidating various errors by collecting detailed equipment information at the point of an optimum time. Operating information generated by the equipment is stored in a storing...
|
JP2692093B2 |
|
JPH09305801A |
To exactly notify ticket exhaustion in advance without requiring any special equipment such as a sensor by detecting the number of issued tickets and previously notifying the ticket exhaustion when the number of issued tickets is a set n...
|
JP2674619B2 |
A video recorder system including a video recorder having an output and a plurality of operating elements which can be operated by an operator according to a desired mode of operation as outlined in operating instructions for recording a...
|
JPH09285947A |
To reduce production costs by optimizing the number of devices and the number of workers even in a production line in which one worker operates a plurality of devices. A processing capacity parameter is defined for each device variety, i...
|
JPH09287370A |
To enable quick and proper correspondence at the time of the generation of trouble by remotely predicting the maintenance periods of a large number of installed electronic blinds by statistical processing. A motor 11 is controlled by an ...
|
JP2666363B2 |
|
JP2663768B2 |
PURPOSE: To accurately manage the life of an ID card. CONSTITUTION: Information to forecast the life of an 10 card 10 is stored in a data base 21. The frequency in access of the ID card 10 is calculated by a production management compute...
|
JPH09510312A |
In an industrial plant individual work stations (108, 112, 122) are each provided with a respective stand alone reading device (2). Each individual worker has an IC card (44) carrying an integrated circuit (42) with memory in which is st...
|
JP2653999B2 |
|
JP2653729B2 |
During the manufacture of packages, printed sheets (F) are transported, by clamp bars (6) through a cutting-out station (2) of a machine. In a part of the machine located before the front waste (Df) ejection (8), a "CAMERA FLASH" unit (1...
|
JP2653558B2 |
PURPOSE:To obtain a time series data management device for reserving and searching the time series data of a large-scale plant easily, speedily, and surely. CONSTITUTION:The data length and the max. amplitude of the time series data is o...
|
JPH09231421A |
To unnecessitate a work for adjusting traffic fares and behavior certification when an employee returns by allowing the employee to call from his going-out destination to automatically register his behavior contents to the side of a mana...
|
JPH09231420A |
To set up the start and end dates of work related to important point management dates and to easily judge the start and end dates of the work from a process diagram by setting orderly relation with important point management dates to be ...
|
JP2642256B2 |
|
JP2642438B2 |
PURPOSE:To reduce the occurrence of defects and troubles so as to improve the reliability of an atomic power plant, etc., by estimating, evaluating and managing the service life and deterioration of parts of apparatuses. CONSTITUTION:App...
|
JPH09192851A |
To provide an appropriate nugget diameter by judging that the welding is inappropriate when the actual nugget forming starting time is longer than the nugget forming starting time of the target estimated nugget diameter in the delay stan...
|
JPH09193335A |
To automatically measure the length and the diameter of the tapered axial hole of a chucked roll on which a printing plate is to be prepd. and to utilize them for handling thereafter the roll on which the printing plate is to be prepd. A...
|
JP2632195B2 |
|