To surely control MgO ratio in non-metallic inclusion to ≤2.5% by controlling MgO quantity.
When steel for high strength steel wire is manufactured, in a process from the molten steel tapping-off time in a converter to a secondary refining treatment, the MgO quantity to be added into the molten steel is controlled to be ≤330g/t of the molten steel, and in the decarburize-treatment in the converter, [P] in the molten iron to be charged into the converter is controlled to be ≤0.040 mass%, and the CaO quantity to be supplied is controlled to be 12.0-21.0 kg/t in specific consumption. The MgO quantity to be supplied is controlled to be 100-1500g/t of the molten steel. Regarding a top-blowing, the blowing oxygen quantity in a primary top-blowing section in 60-80% of time from the blowing start is made different from the blowing oxygen quantity after the elapse of the above time. Regarding a bottom-blowing, the bottom-blowing gas is blown from blowing start to blowing finish so as to satisfy 0.045-0.075Nm
COPYRIGHT: (C)2011,JPO&INPIT
JP2010163681A | 2010-07-29 | |||
JP2009052107A | 2009-03-12 | |||
JP2006104506A | 2006-04-20 | |||
JP2006016639A | 2006-01-19 |
Mikio Yasuda