電鉄用変電所監視制御装置
Document Type and Number:
Japanese Patent JP4365742
Kind Code:
B2
Abstract:

To omit a connecting work in simulation tests.

Railway substation monitoring control equipment includes: a setting means 8 that selects a receiving circuit breaker 2 to be simulated to output an apparatus selection signal and makes it possible to set an operating time of the receiving circuit breaker 2; a simulation processing means 10 that, when an operating time of the the receiving circuit breaker 2 is set by the setting means 8 and a control execution signal is input, outputs a status signal after the operating time of the receiving circuit breaker 2 has passed; a control processing means 9 that recognizes a receiving circuit breaker 2 to be simulated by an apparatus selection signal and outputs a control execution signal to the simulation processing means 10 when a control command signal as a command to turn on the receiving circuit breaker 2 is input from a central direction center 6 and a status signal when a status signal is inputted from the simulation processing means 10; and an input/output processing means 11 that, when a status signal is input, transmits a status signal to the central direction center 6.

COPYRIGHT: (C)2006,JPO&NCIPI


Inventors:
Yoshihiro Miyamoto
Application Number:
JP2004218449A
Publication Date:
November 18, 2009
Filing Date:
July 27, 2004
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Mitsubishi Electric Corporation
International Classes:
H02J13/00; B61L27/00; H02J3/00
Domestic Patent References:
JP11015515A
JP2002059835A
JP5083886A
JP2001213316A
JP2000016295A
Attorney, Agent or Firm:
Masuo Oiwa
Toshihide Kodama
Takenaka Ikuo
Keigo Murakami