To omit a connecting work in simulation tests.
Railway substation monitoring control equipment includes: a setting means 8 that selects a receiving circuit breaker 2 to be simulated to output an apparatus selection signal and makes it possible to set an operating time of the receiving circuit breaker 2; a simulation processing means 10 that, when an operating time of the the receiving circuit breaker 2 is set by the setting means 8 and a control execution signal is input, outputs a status signal after the operating time of the receiving circuit breaker 2 has passed; a control processing means 9 that recognizes a receiving circuit breaker 2 to be simulated by an apparatus selection signal and outputs a control execution signal to the simulation processing means 10 when a control command signal as a command to turn on the receiving circuit breaker 2 is input from a central direction center 6 and a status signal when a status signal is inputted from the simulation processing means 10; and an input/output processing means 11 that, when a status signal is input, transmits a status signal to the central direction center 6.
COPYRIGHT: (C)2006,JPO&NCIPI
JP11015515A | ||||
JP2002059835A | ||||
JP5083886A | ||||
JP2001213316A | ||||
JP2000016295A |
Toshihide Kodama
Takenaka Ikuo
Keigo Murakami