Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
AZIMUTH ESTIMATION FOR DIRECTIONAL DRILLING
Document Type and Number:
WIPO Patent Application WO/2019/118184
Kind Code:
A1
Abstract:
A method may comprise measuring during a survey operation a gravitational field data using a survey accelerometer and magnetic field data using a survey magnetometer and determining during a drilling operation an azimuth of a wellbore based on the gravitational field data and the magnetic field data obtained during the survey operation. A system may comprise a drilling rig; a pipe string attached to the drilling rig; a bottom hole assembly attached to the pipe string, wherein the bottom hole assembly comprises at least one sensor; a drill bit, wherein the at least one sensor measure a revolutions-per-minute (RPM) of the drill bit; and a computing subsystem.

Inventors:
SOBHANA RASHOBH RAJAN (SG)
Application Number:
PCT/US2018/062983
Publication Date:
June 20, 2019
Filing Date:
November 29, 2018
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
HALLIBURTON ENERGY SERVICES INC (US)
International Classes:
E21B47/09; E21B7/04; G01D21/02; G01P15/00; G01R33/02
Foreign References:
US20130151157A12013-06-13
US5452518A1995-09-26
US20100211318A12010-08-19
US20110196612A12011-08-11
US20140163888A12014-06-12
Attorney, Agent or Firm:
TUMEY, Corey (US)
Download PDF:
Claims:
CLAIMS

What is claimed is:

1. A method, comprising:

measuring during a survey operation a gravitational field data using a survey accelerometer and magnetic field data using a survey magnetometer; and

determining during a drilling operation an azimuth of a wellbore based on the gravitational field data and the magnetic field data obtained during the survey operation.

2. The method of claim 1, wherein determining the azimuth comprises estimating an axial component of a magnetic field in the wellbore.

3. The method of claim 2, wherein estimating the axial component of the magnetic field comprises estimating the axial component of the magnetic field based on a magnetic dip angle determined during the survey operation.

4. The method of claim 3, wherein estimating the axial component of the magnetic field further comprises estimating the axial (z) component of the magnetic field based on an inverse of the gravitational field data obtained during the survey operation.

5. The method of claim 4, wherein the inverse is a Moore-Penrose pseudoinverse.

6. The method of claim 1, wherein estimating the azimuth comprises estimating the azimuth determining an inclination of the wellbore based on the gravitational field data measured during the survey operation or additional gravitational field data measured during the drilling operation.

7. The method of claim 1, wherein determining the azimuth during the drilling operation, comprises determining the azimuth during the drilling operation without obtaining magnetic field data during the drilling operation.

8. The method of claim 1, further comprising computing Boxy = bxs2 4- bys 2 during the survey operation or the drilling operation, wherein bxs is a magnetic field vector in a x direction and bys is a magnetic field vector in a y direction.

9. The method of claim 8, further comprising updating Boxy during the survey operation by computing

10. The method of claim 8, further comprising updating Boxy during the drilling operation by computing Boxy' n), for N samples, i.e., (n— N + l to n) and computing Boxy(n)— BoxyRatio * mean Boxy' .

11. A system comprising:

a drilling rig;

a pipe string attached to the drilling rig;

a bottom hole assembly attached to the pipe string, wherein the bottom hole assembly comprises at least one sensor;

a drill bit, wherein the at least one sensor measure a revolutions -per-minute (RPM) of the drill bit; and

a computing subsystem connected to the at least one sensor and configured to:

measure a gravitational field data using a survey accelerometer and magnetic field data using a survey magnetometer; and

determine an azimuth of a wellbore based on the gravitational field data and the magnetic field data.

12. The system of claim 11, wherein the computing sub system is further configured to estimate an axial component of a magnetic field in the wellbore.

13. The system of claim 12, wherein the computing sub system is further configured to estimate the axial component of the magnetic field based on a magnetic dip angle.

14. The system of claim 13, wherein the computing sub system is further configured to estimate the axial (z) component of the magnetic field based on an inverse of the gravitational field data.

15. The system of claim 14, wherein the inverse is a Moore-Penrose pseudoinverse.

16. The system of claim 11, wherein the computing sub system is further configured to estimate the azimuth determining an inclination of the wellbore based on the gravitational field data

17. The system of claim 1 1, wherein the computing sub system is further configured to determine the azimuth during the drilling operation without obtaining magnetic field data.

18. The system of claim 1 1, wherein the computing sub system is further configured to compute Boxy = I bxs + bys , wherein bxs is a magnetic field vector in a x direction and bys is a magnetic field vector in a y direction.

19. The system of claim 18, wherein the computing sub system is further configured to update Boxy by computing

20. The system of claim 18, wherein the computing sub system is further configured to update Boxy by computing Boxy'(n ), for N samples, i.e , (n— N + 1 to n) and computing Boxy(n ) = BoxyRatio * mean(Boxy').

Description:
AZIMUTH ESTIMATION FOR DIRECTIONAL DRILLING

TECHNICAL FIELD

[0001] The present description relates in general to azimuth estimation in the presence of magnetic field interferences, and more particularly to, for example, without limitation, azimuth estimation for directional drilling.

BACKGROUND

[0002] Magnetic measurements obtained during wellbore drilling may be affected by external interferences such as from ferromagnetic interferences from drill string, ore deposits in a bottom- hole assembly (BHA), and interaction of drilling fluids and debris with the earth's magnetic field.

[0003] The description provided in the background section should not be assumed to be prior art merely because it is mentioned in or associated with the background section. The background section may include information that describes one or more aspects of the subject technology.

BRIEF DESCRIPTION OF THE DRAWINGS

[0004] FIG. 1A is a diagram of an example well system, in accordance with aspects of the subject disclosure.

[0005] FIG. 1B is a diagram of an example well system that includes a measurement tool in a wireline measurement environment, in accordance with aspects of the subject disclosure.

[0006] FIG. 1C is a diagram of an example well system that includes a measurement tool in a measurement while drilling (MWD) environment, in accordance with aspects of the subject disclosure.

[0007] FIG. 2 is a graph of an azimuth estimation error in a noiseless environment.

[0008] FIG. 3 is a graph of an azimuth estimation error in a noisy environment.

[0009] FIG. 3 is a graph of an azimuth estimation error in a noisy environment.

[0010] FIG. 4 is a graph of another azimuth estimation error in a noisy environment.

[0011] FIG. 5 is a graph of another azimuth estimation error in a noisy environment.

[0012] FIG. 6 is a graph of an another estimation error in a noisy environment.

[0013] FIG. 7 is a flowchart of illustrative operations that may be performed for azimuth determination for a wellbore, in accordance with aspects of the subject disclosure.

[0014] In one or more implementations, not all of the depicted components in each figure may be required, and one or more implementations may include additional components not shown in a figure. Variations in the arrangement and type of the components may be made without departing from the scope of the subject disclosure. Additional components, different components, or fewer components may be utilized within the scope of the subject disclosure.

DETAILED DESCRIPTION

[0015] The detailed description set forth below is intended as a description of various implementations and is not intended to represent the only implementations in which the subject technology may be practiced. As those skilled in the art would realize, the described implementations may be modified in various different ways, all without departing from the scope of the present disclosure. Accordingly, the drawings and description are to be regarded as illustrative in nature and not restrictive.

[0016] In directional drilling, inertial and position sensors are vital components for the service to be effective. A combination of gravity, magnetic field and, sometimes, angular sensors are used to obtain the location and direction of a wellbore. While gravity sensors or accelerometers provide inclination and gravity tool-face (TF), magnetometers, in conjunction with the accelerometers, help to obtain azimuth or direction of the well bore.

[0017] For measurement while drilling (MWD) applications, use of magnetometers is limited by external interferences such as from ferromagnetic interferences from drill string, ore deposits in bottom-hole assembly (BHA), and interaction of drilling fluids and debris with the earth's magnetic field. Such interferences influence the precision of magnetometers inducing azimuth estimation error. Hence, it is challenging to accurately measure azimuth while drilling.

[0018] In accordance with various aspects of the subject disclosure, systems and methods are provided for measuring azimuth using locally computed tool-face (TF) and magnetic field information provided by the survey grade magnetometers in the directional module (DM).

[0019] FIG. 1A is a diagram of an example well system 100a. Well system 100a includes measurement system 108 and a subterranean region 120 beneath the ground surface 106. A well system may include additional or different features that are not shown in FIG. 1A. For example, well system 100a may include additional drilling system components, wireline measurement system components, etc.

[0020] Subterranean region 120 may include all or part of one or more subterranean formations or zones. The example subterranean region 120 shown in FIG. 1A includes multiple subsurface layers 122 and a wellbore 104 penetrated through subsurface layers 122. Subsurface layers 122 may include sedimentary layers, rock layers, sand layers, or combinations of these and other types of subsurface layers. One or more of the subsurface layers may contain fluids, such as brine, oil, gas, etc. Although the example wellbore 104 shown in FIG. 1A is a vertical wellbore, measurement system 108 may be implemented in other wellbore orientations. For example, measurement system 108 may be adapted for horizontal wellbores, slanted wellbores, curved wellbores, vertical wellbores, or combinations of these.

[0021] The example measurement system 108 includes a measurement tool 102, surface equipment 1 12, and a computing subsystem 110. In the example shown in FIG. 1 A, measurement tool 102 may be a downhole measurement tool that operates while disposed in wellbore 104. The example surface equipment 1 12 shown in FIG. 1A operates at or above surface 106, for example, near well head 105, to control measurement tool 102 and possibly other downhole equipment or other components of well system 100. The example computing subsystem 1 10 may receive and analyze measurement data from measurement tool 102. A measurement system may include additional or different features, and the features of a measurement system may be arranged and operated as represented in FIG. 1 A or in another manner. In some instances, all or part of computing subsystem 110 may be implemented as a component of, or can be integrated with one or more components of, surface equipment 112, measurement tool 102 or both. In some cases, computing subsystem 1 10 may be implemented as one or more computing structures separate from surface equipment 112 and measurement tool 102.

[0022] In some implementations, computing subsystem 110 may be embedded in measurement tool 102, and computing subsystem 1 10 and measurement tool 102 may operate concurrently while disposed in wellbore 104. For example, although computing subsystem 110 is shown above surface 106 in the example shown in FIG. 1A, all or part of computing subsystem 1 10 may reside below surface 106, for example, at or near the location of the measurement tool 102.

[0023] Well system 1 OOzz can include communication or telemetry equipment that allows communication among computing subsystem 110, measurement tool 102, and other components of measurement system 108. For example, the components of measurement system 108 may each include one or more transceivers or similar apparatus for wired or wireless data communication among the various components. For example, measurement system 108 may include systems and apparatus for optical telemetry, wireline telemetry, wired pipe telemetry, mud pulse telemetry, acoustic telemetry, electromagnetic telemetry, or a combination of these and other types of telemetry. In some cases, measurement tool 102 receives commands, status signals, or other types of information from computing subsystem 110 or another source. In some cases, computing subsystem 110 receives measurement data, status signals, or other types of information from the measurement tool 102 or another source.

[0024] Measurement operations may be performed in connection with various types of downhole operations at various stages in the lifetime of a well system. Structural attributes and components of surface equipment 112 and measurement tool 102 may be adapted for various types of measurement operations. For example, measurement may be performed during drilling operations, during wireline measurement operations, or in other contexts. As such, surface equipment 1 12 and measurement tool 102 may include, or may operate in connection with drilling equipment, wireline measurement equipment, or other equipment for other types of operations.

[0025] In some examples, measurement operations may be performed during wireline measurement operations. FIG. 1B shows an example well system 100έ that includes measurement tool 102 in a wireline measurement environment. In some example wireline measurement operations, surface equipment 112 includes a platform above surface 106 equipped with a derrick 132 that supports a wireline cable 134 that extends into wellbore 104. Wireline measurement operations may be performed, for example, after a drill string is removed from wellbore 104, to allow measurement tool 102 to be lowered by wireline or measurement cable into wellbore 104.

[0026] In some examples, measurement operations may be performed during drilling operations. FIG. 1C shows an example well system 100c that includes measurement tool 102 in a measurement while drilling (MWD) environment. Drilling is commonly carried out using a string of drill pipes connected together to form a drill string 140 that is lowered through a rotary table into wellbore 104. In some cases, a drilling rig 142 at surface 106 supports drill string 140, as drill string 140 may operate to drill a wellbore penetrating subterranean region 120. Drill string 140 may include, for example, a kelly, drill pipe, a bottomhole assembly, and other components. The bottomhole assembly on the drill string may include drill collars, drill bits, measurement tool 102, and other components. The measurement tools may include measuring while drilling (MWD) tools, logging while drilling (LWD) tools, and others.

[0027] In some implementations, measurement tool 102 includes one or more accelerometers 191, magnetometers 193, angular sensors 195, and/or other sensors. A determination of the azimuth, cp, of wellbore 104 may be determined during a drilling operation based on data obtained by measurement tool 102 (e.g., by accelerometer 191 and/or magnetometer 193) during a survey operation, using the derivation provided as follows.

[0028] Let G(n ) = [g x (n), g y (n), g 7 (n)] T be the gravitational field vector obtained from local accelerometer 191 and B(n) = [b x (n), b y (n), b z (n)\ be the magnetic field vectors

I 2 2 obtained from the local magnetometer 193. During a stationary survey Boxy = / b xs + b ys , the magnetic dip angle y may be computed using DM.

[0029] In the long collar method, azimuth is computed as, where f is the azimuth, a is the gravitational tool-face (GTF), decl is the magnetic declination and Q is the inclination. Defining b = as the magnetic tool-face (MTF), we have:

b x (ri)— Boxy cos b,

b y (n) = Boxy sin b.

[0030] Substituting the above in Eq. (1) and simplifying, provides:

[0031] However, in the presence of magnetic interferences, the computed MTF b and b z (n) may be erroneous. This may introduce error in Eq. (2). Accordingly, systems and methods disclosed herein obtain the azimuth, f (h), without using the locally measured magnetic field parameters (e.g., locally measured during drilling operations).

[0032] In particular, it is known that:

(3) are the total gravitational and magnetic fields, respectively. Therefore, normalized

as:

Sign of b z (n) may be positive or negative. In examples, an azimuth with both signs may be computed and the answer that may be the closest to a survey azimuth may be chosen. In another example, to solve the sign ambiguity may be to first compute:

In examples, if |sin y - <pl \ < \ sin y - f2 \, then sign of b z (ri) may be positive, else, negative.

Defining the normalized gravitational components: g x (n = - sin Q cos a,

g y (n ) = sin 0 sin a.

In examples, Eq. (3) may be written as: si h gB t = — sin Q cos a Boxy cos /? + sin Q sin a B oxy sin /? + b z ( )g z (n) (7) From Eq. (7), it may then be determined, for normalized magnetometer data, that sin yBr - b z (n)g z (n)

cos ( + /?) -Boxy sin Q (8) and,

Substituting equations (4), (8), and (9) into equation (2), provides the azimuth, f.

[0033] It may be noted that equation (8) may depend primarily on g : (n), the estimated b z ( n), y and the measured inclination Q. Hence azimuth estimation using the modified equation (2) does not depend on the local magnetic field vector. Since the inclination may be slowly changing, g z (n) averaged over N samples is used in the above equations in order to mitigate the random noise components.

[0034] The“Boxy” may be periodically updated using existing techniques during a survey and/or drilling operations. For example, a technique to update Boxy during a survey may include first computing the local Boxy as Boxy' and secondly computing the xyRatio = In examples

a technique to update Boxy during drilling operations may include first computing the local Boxy, Boxy'(n), for N samples, i.e., (n— N + 1 to n) and secondly computing Boxy(n ) = Boxy Ratio * mean(Boxy').

[0035] Figures 2-6 are charts illustrating simulated results of the proposed method above with a conventional long collar method of computing azimuth. No GTF estimation error is assumed in the simulations shown. In Figure 2, root-mean-square (RMS) estimation error e RMS obtained for magnetometer data with no external noise is shown. While the conventional algorithm achieves e RMS = 0.21 ° , the proposed method achieves e RMS = 0.01 ° . In order to examine the performance of the proposed algorithm, white Gaussian noise (WGN) with different signal-to-noise ratio (SNR) was added to the clean magnetometer data. Figures 3-6 show the results obtained for the noisy cases. The RMS error e RMS obtained in each case is tabulated in Table 1. Table 1 is RMS azimuth estimation error e RMS (in degree) compared to a signal to noise ratio. From the presented results, the proposed method outperforms the conventional method in estimating the azimuth angle. Table 1

[0036] From the presented results, it may be seen that the disclosed method outperforms the conventional method in estimating the azimuth angle.

[0037] FIG. 7 shows illustrative operations that may be performed (e.g., by measurement system 108) for azimuth determination (e.g., while drilling). At block 700, during a survey operation in a wellbore, gravitational field data (e.g., G(«)) may be obtained using a survey accelerometer and magnetic field data (e.g., B(n)) is obtained using a survey magnetometer. In examples“Boxy” may be determined from the obtained gravitational field data and magnetic field data as described above.

[0038] At block 702, during a drilling operation in the wellbore, the azimuth, cp, of the wellbore is determined based on the gravitational field data and/or the magnetic field data obtained during the survey (e.g., based on the determined Boxy with equations (6), (8), and (9) substituted into equation (2) above). For example, determining the azimuth based on the gravitational field data and/or the magnetic field data obtained during the survey may include estimating an axial (z) component of the magnetic field. Estimating the axial component of the magnetic field may include estimating the axial (z) component of the magnetic field based on a sine of a magnetic dip angle (g) determined using a directional module (DM) during the survey. Estimating the axial component of the magnetic field may also include estimating the axial (z) component of the magnetic field based on an inverse (e.g., a Moore-Penrose pseudoinverse) of the gravitational field data obtained during the survey. Estimating the azimuth may include estimating the azimuth using the inclination measured during the survey and/or during drilling operations. In this way, the azimuth can be determined, during drilling operations, without obtaining or using magnetic field data during the drilling operations. In examples“Boxy” may be periodically updated as noted above.

[0039] In accordance with various aspects, systems and methods are provided that allow better estimation of azimuth in the presence of magnetic interferences, include azimuth determination independent of magnetic tool-face estimation, allow azimuth determination while drilling in the presence of magnetic interferences based on the gravitational tool-face and magnetic field information obtained during a stationary survey, and/or achieve better position control for rotary steerable systems (RSS) while drilling.

[0040] This method and system may include any of the various features of the compositions, methods, and system disclosed herein, including one or more of the following statements. [0041] Statement 1. A method may comprise measuring during a survey operation a gravitational field data using a survey accelerometer and magnetic field data using a survey magnetometer, and determining during a drilling operation an azimuth of a wellbore based on the gravitational field data and the magnetic field data obtained during the survey operation.

[0042] Statement 2. The method of statement claim 1, wherein determining the azimuth comprises estimating an axial component of a magnetic field in the wellbore.

[0043] Statement 3. The method of statements 1 or 2, wherein estimating the axial component of the magnetic field comprises estimating the axial component of the magnetic field based on a magnetic dip angle determined during the survey operation.

[0044] Statement 4. The method of statements 1 to 3, wherein estimating the axial component of the magnetic field further comprises estimating the axial (z) component of the magnetic field based on an inverse of the gravitational field data obtained during the survey operation.

[0045] Statement 5. The method of statement 4, wherein the inverse is a Moore-Penrose pseudoinverse.

[0046] Statement 6. The method of statements 1 to 3, wherein estimating the azimuth comprises estimating the azimuth determining an inclination of the wellbore based on the gravitational field data measured during the survey operation or additional gravitational field data measured during the drilling operation.

[0047] Statement 7. The method of statements 1 to 3 or 6, wherein determining the azimuth during the drilling operation, comprises determining the azimuth during the drilling operation without obtaining magnetic field data during the drilling operation.

[0048] Statement 8. The method of statements 1 to 3, 6, or 7, further comprising computing

Boxy = Jb xs 2 + b ys 2 during the survey operation or the drilling operation, wherein b xs is a magnetic field vector in a x direction and b ys is a magnetic field vector in a y direction.

[0049] Statement 9. The method of statements 1 to 3 or 6 to 8, further comprising updating Boxy during the survey operation by computing Boxy' and BoxyRatio = Boxy -

[0050] Statement 10. The method of statements 1 to 3 or 6 to 9, further comprising updating Boxy during the drilling operation by computing Boxy'in), for N samples, i.e., (n— N + 1 to n) and computing Boxyin) = BoxyRatio * mean(Boxy').

[0051] Statement 11. A system may comprise a drilling rig; a pipe string attached to the drilling rig; a bottom hole assembly attached to the pipe string, wherein the bottom hole assembly comprises at least one sensor; a drill bit, wherein the at least one sensor measure a revolutions- per-minute (RPM) of the drill bit; and a computing subsystem connected to the at least one sensor and configured to: measure a gravitational field data using a survey accelerometer and magnetic field data using a survey magnetometer; and determine an azimuth of a wellbore based on the gravitational field data and the magnetic field data.

[0052] Statement 12. The system of statement 11, wherein the computing sub system is further configured to estimate an axial component of a magnetic field in the wellbore.

[0053] Statement 13. The system of statements 11 or 12, wherein the computing sub system is further configured to estimate the axial component of the magnetic field based on a magnetic dip angle.

[0054] Statement 14. The system of statements 11 to 13, wherein the computing sub system is further configured to estimate the axial (z) component of the magnetic field based on an inverse of the gravitational field data.

[0055] Statement 15. The system of statements 11 to 14, wherein the inverse is a Moore-Penrose pseudoinverse.

[0056] Statement 16. The system of statements 11 to 15, wherein the computing sub system is further configured to estimate the azimuth determining an inclination of the wellbore based on the gravitational field data

[0057] Statement 17. The system of statements 11 to 16, wherein the computing sub system is further configured to determine the azimuth during the drilling operation without obtaining magnetic field data.

[0058] Statement 18. The system of statements 11 to 17, wherein the computing sub system is further configured to compute Boxy = bx 2 + b y 2 wherein b xs is a magnetic field vector in a x direction and b ys is a magnetic field vector in a y direction.

[0059]

[0060] Statement 19. The system of statement 18, wherein the computing sub system is further configured to update Boxy by computing Boxy' and BoxyRatio =

[0061]

[0062] Statement 20. The system of statement 18, wherein the computing sub system is further configured to update Boxy by computing Boxy'(n), for N samples, i.e., (n— N + 1 to n) and computing Boxy(n) = BoxyRatio * mean(Boxy').

[0063] In one aspect, a method may be an operation, an instruction, or a function and vice versa. In one aspect, a clause or a claim may be amended to include some or all of the words (e.g., instructions, operations, functions, or components) recited in other one or more clauses, one or more words, one or more sentences, one or more phrases, one or more paragraphs, and/or one or more claims.

[0064] To illustrate the interchangeability of hardware and software, items such as the various illustrative blocks, modules, components, methods, operations, instructions, and algorithms have been described generally in terms of their functionality. Whether such functionality is implemented as hardware, software or a combination of hardware and software depends upon the particular application and design constraints imposed on the overall system. Skilled artisans may implement the described functionality in varying ways for each particular application.

[0065] A reference to an element in the singular is not intended to mean one and only one unless specifically so stated, but rather one or more. For example,“a” module may refer to one or more modules. An element proceeded by “a,” “an,” “the,” or“said” does not, without further constraints, preclude the existence of additional same elements.

[0066] Fleadings and subheadings, if any, are used for convenience only and do not limit the invention. The word exemplary is used to mean serving as an example or illustration. To the extent that the term include, have, or the like is used, such term is intended to be inclusive in a manner similar to the term comprise as comprise is interpreted when employed as a transitional word in a claim. Relational terms such as first and second and the like may be used to distinguish one entity or action from another without necessarily requiring or implying any actual such relationship or order between such entities or actions.

[0067] Phrases such as an aspect, the aspect, another aspect, some aspects, one or more aspects, an implementation, the implementation, another implementation, some implementations, one or more implementations, an embodiment, the embodiment, another embodiment, some embodiments, one or more embodiments, a configuration, the configuration, another configuration, some configurations, one or more configurations, the subject technology, the disclosure, the present disclosure, other variations thereof and alike are for convenience and do not imply that a disclosure relating to such phrase(s) is essential to the subject technology or that such disclosure applies to all configurations of the subject technology. A disclosure relating to such phrase(s) may apply to all configurations, or one or more configurations. A disclosure relating to such phrase(s) may provide one or more examples. A phrase such as an aspect or some aspects may refer to one or more aspects and vice versa, and this applies similarly to other foregoing phrases.

[0068] A phrase“at least one of’ preceding a series of items, with the terms“and” or“or” to separate any of the items, modifies the list as a whole, rather than each member of the list. The phrase“at least one of’ does not require selection of at least one item; rather, the phrase allows a meaning that includes at least one of any one of the items, and/or at least one of any combination of the items, and/or at least one of each of the items. By way of example, each of the phrases“at least one of A, B, and C” or“at least one of A, B, or C” refers to only A, only B, or only C; any combination of A, B, and C; and/or at least one of each of A, B, and C.

[0069] It is understood that the specific order or hierarchy of steps, operations, or processes disclosed is an illustration of exemplary approaches. Unless explicitly stated otherwise, it is understood that the specific order or hierarchy of steps, operations, or processes may be performed in different order. Some of the steps, operations, or processes may be performed simultaneously. The accompanying method claims, if any, present elements of the various steps, operations or processes in a sample order, and are not meant to be limited to the specific order or hierarchy presented. These may be performed in serial, linearly, in parallel or in different order. It should be understood that the described instructions, operations, and systems can generally be integrated together in a single software/hardware product or packaged into multiple software/hardware products.

[0070] In one aspect, a term coupled or the like may refer to being directly coupled. In another aspect, a term coupled or the like may refer to being indirectly coupled.

[0071] Unless otherwise specified, terms such as top, bottom, front, rear, side, horizontal, vertical, and the like refer to an arbitrary frame of reference, rather than to the ordinary gravitational frame of reference. Thus, such a term may extend upwardly, downwardly, diagonally, or horizontally in a gravitational frame of reference.

[0072] The disclosure is provided to enable any person skilled in the art to practice the various aspects described herein. In some instances, well-known structures and components are shown in block diagram form in order to avoid obscuring the concepts of the subject technology. The disclosure provides various examples of the subject technology, and the subject technology is not limited to these examples. Various modifications to these aspects will be readily apparent to those skilled in the art, and the principles described herein may be applied to other aspects.

[0073] All structural and functional equivalents to the elements of the various aspects described throughout the disclosure that are known or later come to be known to those of ordinary skill in the art are expressly incorporated herein by reference and are intended to be encompassed by the claims. Moreover, nothing disclosed herein is intended to be dedicated to the public regardless of whether such disclosure is explicitly recited in the claims. No claim element is to be construed under the provisions of 35 U.S.C. §112, sixth paragraph, unless the element is expressly recited using the phrase“means for” or, in the case of a method claim, the element is recited using the phrase“step for”.

[0074] The title, background, brief description of the drawings, abstract, and drawings are hereby incorporated into the disclosure and are provided as illustrative examples of the disclosure, not as restrictive descriptions. It is submitted with the understanding that they will not be used to limit the scope or meaning of the claims. In addition, in the detailed description, it can be seen that the description provides illustrative examples and the various features are grouped together in various implementations for the purpose of streamlining the disclosure. The method of disclosure is not to be interpreted as reflecting an intention that the claimed subject matter requires more features than are expressly recited in each claim. Rather, as the claims reflect, inventive subject matter lies in less than all features of a single disclosed configuration or operation. The claims are hereby incorporated into the detailed description, with each claim standing on its own as a separately claimed subject matter.

[0075] The claims are not intended to be limited to the aspects described herein, but are to be accorded the full scope consistent with the language claims and to encompass all legal equivalents. Notwithstanding, none of the claims are intended to embrace subject matter that fails to satisfy the requirements of the applicable patent law, nor should they be interpreted in such a way.