Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 1,201 - 1,250 out of 5,982

Document Document Title
JP2001125612A
To make it easy to analyze trouble of production facilities by synchronously reproducing internal information of a controller controlling the production facilities, and image information and sound information of the facilities. A data ed...  
JP2001121384A
To provide a parts layout determining system for automatically determining parts layout into a parts shelf and preparing a layout drawing. This parts layout determining system 1 in a system for storing a plurality of different parts requ...  
JP3164088B2
To house works in a removing material magazine in the same number as the work number of a supply material magazine by respectively comparing the work sending-out number, the work housing number and an increase/decrease in the work number...  
JP3164354B2  
JP2001121386A
To provide a production line space-saving and facilitating maintenance by shortening line length. R-type machine tools 1, 3, 5 with equipments requiring maintenance such as X-shaft feed motors 12, centralized lubricating devices 31 oil a...  
JP2001117625A
To provide a quality monitoring device, a quality monitoring method, and a quality monitoring system for quickening the research of the cause of quality abnormality, and for improving productivity. As for data stored in an input data sto...  
JP2001117623A
To realize a schedule planning system for adjusting an optimal schedule while capturing the change of a production environment changing according to time. This system is provided with a knowledge base 13, corresponding to state change ha...  
JP2001117620A
To provide a product whose quality matches with the needs of customers, and to decrease the failure rate of a facility as a whole. Relating to a process plane scheduling device for scheduling a process schedule for plural molded faciliti...  
JP2001117621A
To provide an FA controller for integrally performing the production management of plural producing facilities in a factory by unifying the ways of thinking about indexes for production management or program structures corresponding to t...  
JP3161861B2
PURPOSE: To provide a method and apparatus for controlling a production system having high efficiency of production, high degree of freedom in system and satisfactory operability. CONSTITUTION: A plurality of operation units respectively...  
JP3161442B2
To fully automatically operate a material releasing device by delivering the same number of works from a material feeding magazine to a material releasing magazine in the same number of magazines. In releasing a material, this device is ...  
JP3161441B2
To house works in a removing material magazine in the same number as the number of works housed in a material supplied magazine by comparing the work housing number with the work sending-out number, and finishing housing of the works to ...  
JP3159062B2
To accurately control the merging of both works by starting a beginning change to change the manufacturing ratio of one of the works by going up from the beginning changing timing to change the manufacturing ratio of the other work. A be...  
JP2001109736A
To provide a system which ranks customer information on the quality of products appearing on the market in each item with an occurrence accumulated value (e.g. the number of occurrence accumulation cases or amount), specifies products th...  
JP2001110696A
To provide an operation management system and an operation management method for a semiconductor manufacturing apparatus which can obtain a precise operation factor of performances, with respect to input of various products into the semi...  
JP2001109512A
To provide a production control system and a computer readable recording medium which can maintain compatibility between alteration contents of a process procedure master and alteration contents of a back ordering file accompanying it ev...  
JP2001105284A
To facilitate the replacement of the number of facilities, man-hours, assembling order or the like in response to the production planning while quickly replacing the preparation data between plural equipment. This production indicating s...  
JP3156248B2  
JP2001101294A
To provide a delivery period managing device capable of managing two or more order delivery periods and also confirming whether or not a changed date when delivery should be performed is allowable from a history of changes of the order d...  
JP2001100830A
To provide a production history managing and retrieving method, with which production histories in production processes connected by a network can be preserved stably over a long time and the production history of a target work can be re...  
JP2001100831A
To control an installed machine at a client terminal connected to a network. This device is provided with a screen display/input part 11 for accepting retrieval conditions for retrieving a database on a server 2 and operation conditions ...  
JP2001100820A
To dispense with an interface by detecting various signals without making electrical connections with production facilities. A facility operation rate monitor 61 is composed of a detecting sensor part and a main body 13 of operation rate...  
JP2001100832A
To speedily calculate an executable delivery date, while considering the process load of real production. This system is provided with an article order managing part 1 for managing articles ordered from clients, a capability framework ma...  
JP2001101325A
To generate order information data on plural venders in accordance with the plural venders from one necessary information even if a product has hierarchy structure formed of a master material and a slave material if the plural material v...  
JP2001100833A
To prevent a planned and registered production schedule from changing excessively from the last production schedule, when correcting the schedule. When the data of production schedules for each of plural production items are registered i...  
JP2001092521A
To accurately reflect the countermeasure result to the property of surplus stock in a production planning. This inventory inspection simulation system is provided with a material requirement calculation part 501 for generating a supply i...  
JP2001092883A
To efficiently assign each working manpower to each work. A working manpower assignment supporting device is provided with a point marking means 6 which converts workload of each inputted work into a point by using a conversion rate indi...  
JP2001092520A
To execute maintenance work for production lines consisting of plural units of equipment at suitable timing reflecting the fault states of respective units of equipment and to suitably execute the stock management of maintained articles....  
JP2001092893A
To provide a method for making construction plan by which an engineer can easily make a practical construction plan in a relatively short time and can improve the efficiency and standarization of his business even when the engineer is no...  
JP3151585B2
PURPOSE: To perform high-efficient manufacture of vehicles without changing production capacity of each process after the passage of a vehicle through a welding process by only effecting regulation of the number of production vehicles at...  
JP3151908B2
PURPOSE: To display scheduled transport time in advance by calculating the working plan of components from the production plan of a post process, and calculating planned transport time from planned number of times of transport and workin...  
JP3151399B2
To provide a fcilities for producing work vehicles which permits production of vehicles of ordered models with shortest possible lead time. The facilities wherein production of vehicle bodies and production of engines run concurrently in...  
JP3153094B2
PURPOSE: To provide a manufacturing process control device which can easily specify a number of process where a trouble has occurred and can easily specify a trouble occurring time zone in the process where a trouble has occurred. CONSTI...  
JP2001084021A
To reduce a cost for maintenance by setting the cumulative working time of exchanging parts as a new life of parts at the time of parts exchanging work due to a fault so as to set the exchanging time of maintenance parts to be an optimum...  
JP2001084014A
To provide a production equipment control system capable of facilitating the evaluation of the safety of a control system. In the control system, a safety relation circuit part 1 and a non-safety relation circuit part 2 are mutually sepa...  
JP2001084020A
To efficiently manage a design process for preparing the technical information of a drawing or the like. The design process management device can display the issue result of a drawing as the progress picture 30 for each kind of machine i...  
JP2001079715A
To provide a device capable of efficiently inserting and mounting various parts even to case bodies of junction blocks of different sorts, and achieving compactness of itself. This part inserting and mounting device is provided with plur...  
JP3148873B2
PURPOSE: To operate the whole apparatus by one worker by constituting a unit type machine tool arranging robots with the machine for rough working and the machine for finish working and arranging as L-shape adjoining each machine to the ...  
JP3149855B2
To suppress a pseudo signal generated by photoelectric transfer with the light incident in a peripheral region in a photoelectric transfer region through an optical diffraction effect, by allowing a flat surface fringing the periphery of...  
JP2001075640A
To reduce the load on a communication line and the process of a fault diagnostic device and to prevent a storage medium from becoming large in capacity by calculating the stop time of a semiconductor substrate processor on alarm resettin...  
JP2001076044A
To confirm status, even at a remote place without any time lag by managing product manufacture information on drawings, instruction manuals, etc., generated at respective stages, when a product is manufactured. This product information m...  
JP2001075631A
To improve productivity by generating a lot allocation map for allocating respective lots in postprocesses to respective devices and allocating the respective lots to the respective devices. Lots for, e.g. one week are allocated to postp...  
JP2001075630A
To attain production planning so that one kind of products is obtained by as one time production as possible without making any arrangement several times within a predetermined unit period, and to reduce the possibility of the generation...  
JP2001075621A
To monitor the high speed operation of a producing device through a low speed network. When a producing device 1 starts the operation of an object to be monitored, a moving picture recording/reproducing device 4 receives a start signal f...  
JP2001075627A
To know an accounting state and a financial state by calculating profit-and-loss statements or/and balance sheets by working groups according to completion data, purchase data, sales data, and manufacture cost data and outputting them. T...  
JP2001075644A
To quickly explicate the cause of the trouble of a processor in an operation managing device for collecting and displaying operation information outputted from each processor of a line in a production process. Stop data including trouble...  
JP2001076269A
To inform an operator of an abnormal state in its early stages without changing a ladder program even if a trouble has occurred in the ladder program of a processor which has not been dealt with, in an operation managing device managing ...  
JP2001071237A
To make an information apparatus for a work section easily usable at any time by a worker. A terminal device 10 as an information apparatus for process work used by a worker M is provided in a work section Sn of a production line 1. The ...  
JP3147007B2
To alleviate the influences of vibration caused by punching to a laser machining part by providing a punch press part driven by a servomotor and the laser machining part having the lager maximum machining power than the punch press part....  
JP2001067407A
To previously calculate and evaluate an effect after introduction by applying information to a present job and evaluation data containing prospect data after a work flow system has been introduced to a calculation expression and calculat...  

Matches 1,201 - 1,250 out of 5,982