PURPOSE: To shorten the construction period by inserting an anchor assembly body into a hole on a ground base and pouring a poured material into the free long part sheath of the assembly body and the hollow part of a load bearing body and pouring the poured material into the hole through a pouring hole at the top edge part of the assembly body.
CONSTITUTION: An anchor assembly body 24 is inserted into a drilled hole part 24. The poured material 15 such as cement milk is introduced under pressure into the free long part sheath 9 of the assembly body 24 and a load bearing part 11. Then, the poured material 15 is poured into the drilled hole part 23 through a pouring hole 7 formed at the top edge part of the assembly body 24 and substituted with boring water.
Ikuta, Yuko
Aoki, Masamichi
Ozaki, Osamu
Watanabe, Norio
Mori, Toshihiro
Kobayashi, Yukio
Katsura, Yutaka
Mano, Hideyuki
KUMAGAI GUMI CO LTD
SHIMIZU CORP
KOUZOU KOJI KK
SUZUKI KINZOKU KOGYO KK
TOKYO SEIKO KK
NITTOC CONSTR CO LTD
RAITO KOGYO KK
KOYO KOGYO KK
Next Patent: SLURRY APPLYING DEVICE