Title:
CONSTRUCTION METHOD FOR REINFORCED CONCRETE BRIDGE PIER
Document Type and Number:
Japanese Patent JP3835716
Kind Code:
B2
Abstract:
PROBLEM TO BE SOLVED: To reduce the reinforcing bar assembling work and heavy hoist work on work scaffolds, to shorten the construction period, and to reduce the cost.
SOLUTION: A first form structural body A and a first form structural body B are assembled with a first and a second concrete form bodies 6, 8 containing a form main body 10 made of a precast concrete board, and a second form structural body 28 containing intermediate tie hoops 44 and separators 24 is assembled. A bending main member is erected at the construction site of a concrete bridge pier, and the first form structural body B and the second form structural body 28 are combined and connected to construct a concrete form rectangular on the plan view. Concrete is placed inside the concrete form.
Inventors:
Terukatsu Sasaya
Katsutoshi Hirano
Katsutoshi Hirano
Application Number:
JP20859497A
Publication Date:
October 18, 2006
Filing Date:
July 17, 1997
Export Citation:
Assignee:
Fujita Co., Ltd.
International Classes:
E01D19/02; (IPC1-7): E01D19/02
Domestic Patent References:
JP52142839A | ||||
JP55108504A | ||||
JP6057710A | ||||
JP8035210A | ||||
JP6264414A | ||||
JP6081476A | ||||
JP6306933A | ||||
JP4011804U | ||||
JP7268812A | ||||
JP61206709U | ||||
JP10121417A | ||||
JP10102423A |
Attorney, Agent or Firm:
Shigeru Noda
Previous Patent: LIQUID INJECTION SEALING UNDERFILLING MATERIAL
Next Patent: RUSTPROOF FOAMED PLASTIC TUBE AND ITS MANUFACTURE
Next Patent: RUSTPROOF FOAMED PLASTIC TUBE AND ITS MANUFACTURE