To provide a construction waste material recycle system capable of efficiently performing the recycle of construction waste material to reduce the ratio of disposal.
This system comprises (a) a plurality of waste material supplying source servers having a waste material quantity calculation means for estimating and determining the discharge quantity and discharge time of waste materials based on a plan expected to discharge the waste materials, and a waste material quantity transmitting means for transmitting the discharge quantity and discharge time of waste materials by e-mail; (b) a plurality of waste material supplying designation servers having a required quantity calculation means for determining the required quantity and required time of waste materials based on a plan using waste materials, and a necessary quantity transmitting means for transmitting the required quantity and required time of waste materials by e-mail; and (c) an intermediate processing server having a distribution processing means for distributing the waste materials supplied from the supplying source to the supplying designation based on the required quantity and required time of waste materials, and a delivery planning means for planning the delivery of waste materials according to the supplying designation of waste materials determined by the distribution processing means.
Tadashi Takahashi
Takashi Watanabe
Masakazu Aoyama
Suzuki Mitsuyoshi
Kazuya Nishi
Yasuhiko Murayama