To provide a method of lining of a tunnel enabling preferable construction of an arch section (a top end) by securing filling performance, density and solidity of concrete.
A pair of right and left side walls 3, 4 are constructed by placing ordinary concrete 2. Fluid concrete 5 is placed to construct the arch section 6 connected to the pair of side walls 3, 4 while arranging a pressure sensor 13 on the side of a surface of a form 1 and a filling detecting sensor 12 on the side of the natural ground G. An air-bleeding hole 11 is formed in the top end 7 of the arch section 6, and blow-up ports 9, 10, (8) are arranged between the top end 7 of the arch section 6 and two ends 6a, 6b, respectively. The fluid concrete 5 is placed through the blow-up ports 9, 10, (8).
NODA KOHEI
JP2008088696A | 2008-04-17 | |||
JPH09268888A | 1997-10-14 | |||
JPH10169196A | 1998-06-23 | |||
JP2004301616A | 2004-10-28 | |||
JP2009155819A | 2009-07-16 | |||
JP2003056296A | 2003-02-26 | |||
JP2008088691A | 2008-04-17 |
JPN6013026567; 金子稔、坂井孝、安田正雪、末岡英二: '振動を利用したコンクリート充填検知システムに関する基礎実験' コンクリート工学年次論文集 Vol.24,No.1, 2002, 第1527-1532頁, 社団法人日本コンクリート工学協会
Tadashi Takahashi
Takashi Watanabe
Yoshifumi Saeki
Next Patent: SOUND INSULATING FLOOR STRUCTURE