PURPOSE: To prevent any breakdown from occurring, by installing a mooring rope whose one end is connected to a buoyant body and the other end is connected to a mooring buoy having the specified buoyancy, while absorbing an increment in mooring rope tension with a sink and float action.
CONSTITUTION: A guide 2 is installed in an intermediate sinker 1 attached to the seabed B via a rope 5 and a mooring rope 3 is guided and supported via this guide 2. One end of the mooring rope 3 is connected to a buoyant body A while the other end is connected to a mooring buoy 4 having the specified buoyancy. When tension in the mooring rope 3 varies as the buoyant body A shifts to some extent, the mooring buoy 4 sinks and floats according to this tension whereby a state of tension comes loose, thus any breakdown can be prevented.
JPS61150892 | MOORING GEAR |
WO/2021/003555 | A SYSTEM FOR APPLYING A FLUID TO A CHAIN OR CABLE |
JP6966393 | Mooring system |
YAMAMOTO SHIGERU
JPS56158394U | 1981-11-26 | |||
JPS5128918A | 1976-03-11 | |||
JPS56135395U | 1981-10-14 |