To provide a building patrol work schedule generation device which easily and surely perform the patrol work and the assignment work without using an assignment board or nameplates.
A work schedule generator operates an input part 16c of an office 16 to display not only arrays, which are divided by work days, regions, works for pairs of workers, and works for single workers, for customer buildings to be patrolled in a month on a first display area 18 of a display part 16b and bit also a work schedule, where work days and workers correspond to each other, on a second display area 20 and selects a desired customer building from arrays of customer buildings displayed on the first display area 18 to indicate and input it with a mouse 16d and indicates and inputs a prescribed column, which corresponds to prescribed work day and worker in the work schedule displayed on the second display area 20, with the mouse 16d. Then, this customer building is deleted on the display of arrays of customer buildings displayed on the first display area 18, and this customer building is displayed in a prescribed column of the work schedule displayed on the second display area 20.
FUJIMORI SHUICHI
YAMAZAKI SATOSHI
NAKANO AKIO
SHIMOTSUMA KAZUO
MABUCHI KOZO