To provide casting equipment capable of shortening a time cycle of casting as far as possible.
A rectilinear molding board truck group mounted with upper and lower molding flasks built-into molds is formed by molding board trucks on a carry-in means 4, and a plurality of the molding board trucks on a transportation route. The molding board truck group is held between pushing-out means 7 and a buffer means 9 and is moved to a carry-out means side only by two pieces of the molding board trucks. To the carry-in means side portions of the transportation route and the portions on the carry-in means, the molding board trucks mounted with the upper and lower molding flasks built-into the molds is supplied by the carry-in means and the first pushing-out means 8. The rectilinear molding board truck group mounted with the upper and lower molding flasks built-into the molds is formed by the molding board trucks of the carry-in means and the molding board truck group on a transportation route, the two molding board trucks mounted with the upper and lower molding flasks built-into the molds already poured from the carry-out means side portion of the transportation route and the portion on the carry-out means are towed by a second towing means 10 and the carry-out means to form a space into which the two molding board trucks can advance by the carry-out means side portion of the transportation route and the portion on the carry-out means. During this time, the molten metal is poured into two unpoured mold by two pouring means 6.