To provide an elastic ballast track construction confirmation device provided with structure capable of confirming easily a clearance between an elastic material on a sleeper bottom face and weight regulating concrete without a worker requiring a waist to be bent when constructing an elastic ballast track.
The elastic ballast track construction confirmation device is attached with a camera to photograph a clearance in the vicinity of the sleeper central part includes a vertical moving mechanism and a rotary mechanism, and is provided with the structure capable of confirming easily the clearance without the worker requiring the waist to be bent. A dimension of the clearance is calculated based on a photographed image, an amount of a filler is determined based on the calculated dimension, and the determined amount of the filler is injected.
WO/2005/106123 | METHOD FOR DELIVERING REPLACEMENT RAIL TIES USING GPS TECHNIQUES |
JP2021092022 | CRUSHED STONE SPLASH PREVENTION MATERIAL |
JP2009203376 | RUBBER MOLDING |
WATANABE HARUKI
YANO YOSHISUKE
KARASAWA MAMORU
HANAKAWA KAZUHIKO
NOJIMA NANA
HIGASHI NIPPON RYOKAKU TETSUDO