Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
竪配管の施工方法
Document Type and Number:
Japanese Patent JP7309317
Kind Code:
B2
Abstract:
To enable efficient clearance adjustment work, upon sequentially connecting a plurality of vertical pipe members to construct a vertical pipeline.SOLUTION: A method for substantially connecting a plurality of vertical pipe members to construct a vertical pipeline, is characterized in repeatedly steps of: mounting a position adjustment jig 2 at an upper end part of a vertical pipe member fixed to a building in advance; using the position adjustment jig 2 to adjust a position of a lower end part of a next vertical pipe member to an upper end part of the vertical pipe member fixed to the building in advance; and welding and connecting the upper end part of the vertical pipe member fixed to the building in advance and the lower end part of the next vertical pipe member. With the position adjustment jig 2, an interval between end parts of vertical pipe members is adjusted, which in turn can perform interval adjustment work efficiently, shorten a work time and reduce man-hours.SELECTED DRAWING: Figure 2

Inventors:
Tatsuya Miyake
Takanori Kato
Application Number:
JP2017218861A
Publication Date:
July 18, 2023
Filing Date:
November 14, 2017
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Takasago Thermal Engineering Co., Ltd.
International Classes:
F16L1/00; E04F17/08; E04G21/18
Domestic Patent References:
JP2006316927A
JP3487812B2
JP8199819A
JP4158174A
JP200374188A
JP968289A
JP2010121395A
JP11303406A
Attorney, Agent or Firm:
Koji Hagiwara
Tetsuo Kanemoto



 
Previous Patent: receiver

Next Patent: DEVICE FOR APPLYING LABEL TO CONTAINER