To perform construction works by inexpensive equipment, simplify the construction for improving its efficiency, and safely construct an arch-shaped structural body by omitting connection works carried out at high elevations in a unstable suspended condition by a crane.
In this construction method for constructing the arch-shaped structural body formed of a plurality of blocks connected together, a plurality of blocks connected together are pushed up from a construction starting point for the arch-shaped structural body, a new block is supplied to be connected into a clearance formed below the pushed up blocks, and at least one block in the connected blocks is hung and supported, and consequently, the arch-shaped structural body is constructed.
NAKADE OSAMU
MORISHITA KUNIHIRO