To provide a method of enclosing underground contaminants by cutoff walls.
Movements of ground water where a contaminant 1 is eluted are slowed by installing cutoff walls 3 which surround the contaminant 1 under the ground and do not reach an impermeable layer 2 and by slowing the flow velocity of the underground water in an inside 4. The flow velocity of the underground water at a specific place of the inside 4 is adjusted by changing either/both of an installing width B for cutoff walls 3 which are perpendicular to the flow of the underground water or/and an installing depth H. Since the flow velocity of the underground water at the specific place of the inside 4 is constant when the ratio of the installing width B to the installing depth H is constant, a plan depending on a nomogram using the formula can be made.
FURUMOTO ICHIJI
YAMAMOTO CHIKASHI
KUWABARA MASAHIKO
HARADA KENJI
OGISHIMA TATSUYA
ISHIDA HIDEKI
YOSHIHARA SHIGEKI
KUBO MASAAKI
SARAUMI AKIO
MORITA HIROO
OKAMOTO SHINSAKU
IWATA HIDEKI
PUBLIC WORKS RES CT
FUDO CONSTRUCTION CO
SHIMIZU CONSTRUCTION CO LTD
HONMAGUMI KK
JPH1060882A | 1998-03-03 | |||
JPH10317307A | 1998-12-02 |
Next Patent: METHOD OF MANUFACTURING CONCRETE CAISSON ON WATER AND ITS EQUIPMENT