PURPOSE: To enable jack-up by making the remainder jack devices bear reaction force in the case they are reshored after only pair of jack devices of two pairs of jack devices arranged to both sides of the existing column are expanded to push up and bear a building, and repeating the same stage of work in the following.
CONSTITUTION: Two pairs of jack devices 2a and 2b are arranged to the peripheral surface of the existing column 1 of a building, one pair of jack devices 2a only of them are expanded, and a built-up column member 8 is mounted to a specific position under the jack device 2b to bear the same jack device 2b. After that, the jack device 2a is reduced and, at the same time, reaction force is borne on the horizontal member 8 to expand the jack device 2b, and the building is jack up. After the completion of expansion, the jack device 2a is reduced in the same manner to mount the built-up column horizontal member 8 and a built-up column diagonal 9 to specific positions. The jack-up and mounting of the built-up column horizontal member, etc., are repeated to jack up the building up to a specific height.
WO/2001/029338 | SHEAR WALL PANEL |
JP3348977 | COLUMN FORMING METHOD OF STRUCTURE AND DEVICE THEREOF |
JPS59210154 | MOVING SCAFFOLD FOR CONSTRUCTION WORK |
GOMI HARUTO
MOTOMUNE TERUYOSHI
TANIJIRI HIDEO
MARU TAKAHIRO