PURPOSE: To surely transmit shearing forces from the foundation to pile as well as raise the safety of pile head treating operation by a method in which a projected or recessed cover is closely formed on the head of a pile and a recessed or projected cover is also formed on the downside of the foundation, and both the covers are mutually contacted.
CONSTITUTION: A recessed or projected portion 6a is formed on the downside of the footing 2 of the foundation of a building and covered with a cover 6. A projected or recessed portion 5a is also formed or the head of a pile 4 to bear the foundation and covered with a cover 5. Both the covers 5 and 6 are mutually contacted to form a pin-joint between the foundation and the pile. A floating resistor 11, e.g., reinforcing bar may also be inserted into the central parts of the covers 5 and 6 are needed. The pile head treating operation can thus be safely performed, and shearing force can be surely transmitted to the pile head.
SEKINE KUNIO
ADACHI SANKICHI
MIYAZAKI TAKESHI
ISHIHARA SEIKICHI
JPS5938429A | 1984-03-02 |