PURPOSE: To save man-power in field work by planting anchor bolts on an anchor plate, and placing a pedestal reinforced cage assembling a vertical main reinforcement and a hoop in advance to the peripheral surface of an anchor bolt by dropping-in.
CONSTITUTION: A required number of anchor bolts 3 are planted on an anchor plate 1 by means of nuts 2, and a template 4 is mounted on the upper parts of the anchor bolts 3. While, one end of an anchor reinforcement 7 is incorporated into a pedestal reinforced cage A assembling a vertical main reinforcement 5 and a hoop 6 in advance. The pedestal reinforced cage A is placed to the peripheral surfaces of the anchor bolts 3. In addition, a earn reinforced cage B assembling a beam main reinforcement 8 and a strap reinforcement 9 in advance is dropped between the pedestal reinforced cages A and connected to the other end of the anchor reinforcement. According to the constitution, field work can be easily carried out.
KIRIYAMA SHINICHI