To carry out-three-dimensional and more natural greening and greening through the four seasons to the face of a slope by free planting containing woody plants without a limitation regarding a planting range and the thickness, etc., of a vegetation base material by providing a slope greening method proper to planting to the face of the slope of a bedrock and the surface section, etc., of existing or new slope stabilizing structure itself.
In the method of construction, a plurality of anchor materials 2 such as lock bolts are fixed onto an inclined ground 1, and a weather-resistant mat 4 having water permeability and an outflow preventive function to a vegetation base material such as a borrow material is supported to the ground 1 at an interval through the strong fixing force of these anchor materials. Accordingly, the housing space of the vegetation base material is formed between the ground 1 and the weather-resistant mat 4 while the fluidized vegetation base material is injected into the housing space, and plants are planted to the vegetation base material.
JPS62233341 | CONSTRUCTION WORK OF BLOCK FOUNDATION |
JPS58178725 | WATER DRAINING PIPE |
JP3047263 | CONSTRUCTION OF FILLER CAGE |
SAITO KENZO
DAICEL CHEM
FUJIKO KK