Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
CORRECTION SHEAR THEORY CALCULATION METHOD FOR JACKING FORCE IN VERTICAL JACKING METHOD CONSTRUCTION PROCESS
Document Type and Number:
WIPO Patent Application WO/2023/226237
Kind Code:
A1
Abstract:
Disclosed in the present invention is a correction shear theory calculation method for jacking force in a vertical jacking method construction process. The method comprises: firstly analyzing components of the jacking force: according to the vertical jacking method construction process, determining that the jacking force should be equal to the sum of head-on resistance, the frictional resistance between pipes and soil, the self-weight of vertical pipes and the water pressure above the vertical pipes; back-calculating n values at different jacking distances by using a soil shear failure method, the n values being the ratio of the radius Rc of a top surface of a circular truncated-cone-shaped failure area to the outer radius r of the vertical pipes, and correcting a shear failure model area in the soil shear failure method according to a change rule of the n values with the increase of the jacking distances; determining the head-on resistance according to the calculated n values in combination with the corrected shear failure model for the jacking force in the vertical jacking method; determining the self-weight of the vertical pipes, the water pressure above the vertical pipes and the frictional resistance between the pipes and the soil according to the soil shear failure method; correcting the jacking force in a formation stage of the failure area, and determining a correction coefficient m; and finally, calculating the corrected jacking force.

Inventors:
WANG XIAO (CN)
WEI XINJIANG (CN)
WEI GANG (CN)
ZHU CHENGWEI (CN)
ZHANG LISHA (CN)
ZHANG SHUYUAN (CN)
MA JINGHAO (CN)
ZHANG ZENAN (CN)
Application Number:
PCT/CN2022/117727
Publication Date:
November 30, 2023
Filing Date:
September 08, 2022
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
ZHEJIANG CITY UNIV (CN)
International Classes:
G06F30/20; G06F17/18; G06F113/14; G06F119/14
Foreign References:
CN114925528A2022-08-19
CN111783025A2020-10-16
CN105512411A2016-04-20
JP2020016012A2020-01-30
Other References:
WANG SHOUSHENG, GE CHUNHUI: "Study of Vertical Pipe Jacking Calculation Method", SPECIAL STRUCTURES, vol. 26, no. 5, 31 October 2009 (2009-10-31), pages 18 - 21, XP009550740, ISSN: 1001-3598
YAN ZIHAI; ZHOU FENGMIAO; WEI XINJIANG; WANG XIAO; WEI GANG: "Review and Prospects on Standpipe Lifting Method in Shield Tunnels", MODERN TUNNELLING TECHNOLOGY, ZHONGTIE XI'NAN KEXUE YANJIUYUAN, CN, vol. 55, no. S2, 30 November 2018 (2018-11-30), CN , pages 108 - 120, XP009550845, ISSN: 1009-6582, DOI: 10.13807/j.cnki.mtt.2018.S2.014
Attorney, Agent or Firm:
HANGZHOU QIUSHI PATENT OFFICE CO., LTD. (CN)
Download PDF: