Abstract:
Method of assembling a tubular floating structure and its use A first and a second tubular member (11, 12) are welded to opposite sides of a stiffening ring (10) in order to obtain a double-segment (12/11). Further segments (13, 14) can be added to form a tubular multi-segment with stiffening rings (10) in between adjacent 5 tubular members (11, 12, 13). The resulting multi-segment (12/11/13) is used as a tub- ular buoyancy module in a floating offshore structure.

Inventors:
STIESDAL HENRIK (DK)
Application Number:
PCT/DK2023/050203
Publication Date:
February 22, 2024
Filing Date:
August 17, 2023
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
STIESDAL OFFSHORE AS (DK)
International Classes:
B63B3/06; B21D51/18
Domestic Patent References:
WO2019000066A12019-01-03
Foreign References:
FR2395903A11979-01-26
US4618757A1986-10-21
EP0282126A21988-09-14
Attorney, Agent or Firm:
TROPA APS (DK)
Download PDF:
Claims:
CLAIMS

1. Method for assembling a buoyancy module of a tubular floating offshore structure, wherein the method comprises providing a first tubular member (11) and a first stiffening ring (10) for a first segment and a second tubular member (12) and a second stiffening ring (10) for a second segment, each of the first and second tubular members (11, 12) comprising a first edge (11 A, 12A) and an opposite second edge (11B, 12B); wherein the method further comprises, for each of the first and second segments, providing the corresponding stiffening ring (10) lying flat down and having an outer circumference larger than the circumference of the first edge (11 A, 12A) of the corresponding tubular member (11, 12), placing the tubular member (11, 12) with its first edge (11 A, 12 A) onto the stiffening ring (10) within the outer circumference and welding the first edge (11 A, 12 A) to the stiffening ring (10) from above; after turning both welded segments upside down, so that their corresponding stiffening ring (10) is facing upwards, lifting one of the segments with the second edge (1 IB, 12B) of its tubular member (11, 12) onto the stiffening ring (10) of the other of the segments and welding the second edge (1 IB, 12B) to the stiffening ring (10) from above to form a double-segment (12/11) with one of the stiffening rings (10) at the top and with a downward facing second edge (1 IB, 12B) without stiffening ring (10) at the bottom.

2. Method according to claim 1, wherein the method comprises providing a third stiffening ring (10) lying flat down and having a third outer circumference larger than the circumference of a first edge (13A) of a third tubular member (13), placing the third tubular member (13) with its first edge (13A) onto the third stiffening ring (10) within the third outer circumference and welding the first edge (13 A) of the third tubular member (13) to the third stiffening ring (10) so as to provide a third segment; after turning the third segment upside down, so that the third stiffening ring (10) is facing upwards, lifting the double-segment (12/11) with the second edge (1 IB, 12B) of the lower of the segments onto the third stiffening ring (10) and welding it to the third stiffening ring (10) from above so as to provide a triple segment (12/11/13).

3. Method according to any preceding claim, wherein the method comprises providing a first welding station (1) comprising a plurality of rollers (5, 6) arranged in circular configuration and configured for rotationally supporting the first stiffening ring (10) on the rollers (5, 6) in horizontal orientation during the welding between the first tubular member (11) and the first stiffening ring (10), wherein the method comprises maintaining a first welding machine (15) for the welding at a fixed location of the first welding station (1) and doing the welding of the first tubular member (11) to the first stiffening ring (10) while rotating the first ring (11) about its vertical central axis (X).

4. Method according to claim 3, wherein the method comprises providing a second welding station (1’) comprising a plurality of other rollers (5, 6) arranged in circular configuration and configured for rotationally supporting the first tubular member (11) with its second edge (1 IB) facing downwards when the respective first stiffening ring (10) is facing upwards; wherein the method comprises,

- after welding of the first tubular member (11) to the first stiffening ring (10) in the first welding station (1) so as to provide the first segment, lifting the first segment off the first welding station (1) and turning the first segment upside down so that the first stiffening ring (10) is facing upwards;

- after welding of the second tubular member (12) to the second stiffening ring (10) in the first welding station (1) so as to provide the second segment, lifting the second segment off the first welding station (1) and turning the second segment upside down so that the second stiffening ring (10) is facing upwards;

- after having been turned, lifting the first and second segment onto the second welding station (T), one above the other, and forming a double-segment (12/11) with an upper and a lower segment by welding the second edge (11B, 12B) of the upper of the two segments (11, 12) to the stiffening ring (10) of the lower of the two segments (11, 12) in the second welding station (T) with the rollers (5, 6) rotationally supporting the second edge (1 IB, 12B) of the lower of the two segments (11, 12);

- maintaining a second welding station (15) at a fixed location of the second welding station (T) and doing the welding from above the lower of the two stiffening ring (10) while rotating the double-segment (12/11) about its vertical central axis.

5. Method according to claim 4 when dependent on claim 2, comprising

- lifting the double-segment (12/11) off the second welding station (T) and onto a storage station (1”), - after welding of the third tubular member (13) to the third stiffening ring (10) in the first welding station (1) so as to provide the third segment, and after turning the third segment upside down with the third stiffening ring (10) facing upwards, lifting the third segment onto the second welding station (T),

- then, lifting the double segment (12/11) off the storage station (1”) onto the third stiffening ring (10) in the second welding station (T) and welding the second edge (1 IB, 12B) of the lower of the tubular members (11, 12) of the double-segment (12/11) onto the third stiffening ring (10) and forming a triple-segment (12/11/13) of the first, second and third segment,

- lifting the formed triple-segment (12/11/13) off the second welding station (1’).

6. Method according to claim 4 or 5, wherein the second welding station (1’) comprises a support-ring (9) or support-plate in between the rollers (5, 6) and the second edge (1 IB) of the first tubular member (11) , wherein the method comprises lifting the first segment off the first welding station (1) and turning it upside down and lifting it onto the support-ring (9) or support-plate of the second welding station (T) prior to welding of the double segment (12/11) in the second station (1’).

7. Method according to anyone of the claims 3-6 wherein the rollers (5, 6) of at least one of the first and second welding stations (1, 1’) comprises first rollers (5) that support the combination of tubular member (11, 12, 13, 14) and stiffening ring (10) from below and second rollers (6) that abut the combination sideways, and wherein the method comprises guiding the combination by the second rollers (6) during rotation and simultaneous welding.

8. Use of a method according to any preceding claim for assembling a buoyancy module of a tubular floating wind turbine offshore structure.

Description:
Method of assembling a tubular floating structure and its use

FIELD OF THE INVENTION

The present invention relates to method of assembling a tubular floating structure for an offshore support, for example for an offshore wind turbine.

BACKGROUND OF THE INVENTION

Offshore wind turbine support platforms, for example as disclosed in US patent application US2020/269960, as well as other types of support platforms in offshore industry, for example as disclosed in international patent application WO2021/053361 for a floating fish farm, comprise buoyancy tanks that are moored to the seabed in order to keep the structure at the desired location.

For large platforms, the buoyancy tanks are correspondingly large, and fabrication can be a challenge. Typically, the buoyancy tanks are manually assembled and welded from curved steel plates supported by stiffening rings and stringers in a process that resembles shipbuilding and is highly labour-intensive. In a more industrial process, buoyancy tanks may be fabricated by the assembly and welding of complete, pre-fabricated, tubular elements welded together edge-to-edge in a row so that they form the tank with the desired tubular length. In order for the tubular members to maintain their tubular shape when in water, stiffening rings are inserted into the tubular member and welded to the inner surface of the tubular member as a measure against hydrostatic and dynamic pressure when installed under offshore conditions.

Stiffening rings are heavy, increase the expenses, and require time for installation, and therefore it is desired to reduce their number and facilitate production as well as shorten production time. Further, the insertion of the stiffening ring requires that the inner circle of the tubular member matches the outer circle of the stiffening ring with only small tolerances. However, due to the large size of the tubular member there is a risk that its diameter varies or that the shape of the segment deviates slightly from the circular shape and becomes oval, for example caused by handling and transport of the segment. Such deviation of the diameter and deviations from circular shape may lead to difficulties when inserting the circular stiffening ring. This is especially problematic when the segment is oriented with its central axis horizontally. Accordingly, it is better to insert the ring when the segment has its axis oriented vertically. However, in this case, when the welding is done along both edges of the ring, one welding has to be done from below the ring, which increases difficulty in the welding process. Each method has its disadvantages.

Accordingly, it would be desirable to find an improved assembly method which overcomes these disadvantages.

In other technical field, assembly of tubular members into an elongate tank is implemented as a standard, for example when assembling silos in agriculture. In some silo structures, the segments are provided with inner rings that are used for assembly with bolts. Other examples are found in French patent document FR2395903 in which the segments are provide with rings at their opposite ends and then stacked step-by step, and adjacent rings welded to each other by welding from the side. Side-welding of such rings is difficult, however, especially if the welding should be water-tight. Accordingly, the methods known from silo production appear not successfully applicable in production of large-scale buoyancy tanks for floating offshore structures.

Consequently, there is a need for other and improved assembly principles.

DESCRIPTION / SUMMARY OF THE INVENTION

It is therefore an objective of the invention to provide an improvement in the art. In particular, it is an objective to provide an assembly method for buoyancy tanks in offshore structures, especially for offshore wind turbines. This objective and further advantages are achieved with an assembly method as well as its use as described below and in the claims.

In short, two tubular members are welded to opposite sides of a stiffening ring in order to obtain a double-segment. Further segments can be added to form a tubular multi- segment with a stiffening ring, which is a structure-stabilizing ring, in between adjacent tubular members. The resulting multi-segment is used as a tubular buoyancy module in a floating offshore structure.

In the following, the term tank is used alongside the term tubular buoyancy module because this is according to the terminology in the technical field. Similarly, a segment for the tubular buoyancy module will also be called a tank segment or simply a segment.

The assembly method comprises the following two main steps:

1. Fabrication of tank segments

2. Assembly of tank segments to form a complete tank

A tank segment comprises a cylindrical tubular member and a stiffening ring. The tubular member forms a wall of the segment and of the final complete tank. Both parts are made of steel. The tubular member has a first edge and an opposite second edge at opposite ends of the tubular member. The stiffening ring has a first surface and an opposite second surface at opposite sides of the stiffening ring. The stiffening ring also has an outer circumference that is provided larger than the outer circumference of the first edge of the tubular member, and an inner circumference that is provided smaller than the inner circumference of the first edge of the tubular member. This way, there is some tolerance when positioning the tubular member on the stiffening ring.

In fabrication of a tank segment, the stiffening ring is placed flat horizontal with a central axis oriented vertical, having its first surface upwards and resting on its second surface. The tubular member is then placed onto the stiffening ring from above with a vertical axis that is concentric or approximately concentric with the vertical central axis of the stiffening ring. Due to the concentricity of the vertical axes the tubular member and the stiffening ring, the tubular member will rest on the first surface of the stiffening ring in a position where the outer circumference of the first edge of the tubular member is within the outer circumference of the first surface of the stiffening ring, and the inner circumference of the first edge of the tubular member is outside the inner circumference of the first surface of the stiffening ring. In this position the tubular member and the stiffening ring are joined by welding, the welding forming a watertight seam. Since the outer circumference of the first edge of the tubular member is within the outer circumference of the first surface of the stiffening ring, and the inner circumference of the first edge of the tubular member is outside the inner circumference of the first surface of the stiffening ring, the welding is a fillet weld type, which may be carried out with or without full penetration. Due to the vertical axis orientation of the tubular member and the stiffening ring the welding is carried out in a horizontal position, which is very convenient for execution.

After the completion of the fabrication of a tank segment, where the tubular member and the stiffening ring have been joined, the tank segment is rotated 180 degrees around a horizontal axis. While the stiffening ring has been placed below the tubular member during fabrication of the segment, it is positioned above the tubular member after rotation. The segment is now resting on the downwards facing second edge of the tubular member, and the second surface of the stiffening ring now forms the upper surface of the tank segment.

Assembly of tank segments is carried out by placing a second segment on top of a first segment. The second segment is placed from above with a vertical axis that is concentric or approximately concentric with the vertical axis of the first segment and with the second edge of its tubular member resting on the second surface of the stiffening ring of the first segment. Due to the concentricity of the vertical axes, the second segment will be placed in a position where the outer circumference of the second edge of the second tubular member is within the outer circumference of the second surface of the stiffening ring of the first segment, and where the inner circumference of the second edge of the tubular member of the second segment is outside the inner circumference of the second surface of the stiffening ring of the first segment. In this position the tubular member of the second segment and the stiffening ring of the first segment are joined by welding, the welding forming a watertight seam.

As the outer circumference of the second edge of the tubular member of the first segment is within the outer circumference of the second surface of the stiffening ring of the second segment, and the inner circumference of the second edge of the tubular member of the first segment is outside the inner circumference of the second surface of the stiffening ring of the second segment, the welding is a fillet weld type, which may be carried out with or without full penetration. Due to the vertical axis orientation of the tubular member and the stiffening ring the welding is carried out in a horizontal position, which is very convenient for execution.

This method of fabrication and assembly of tank segments has a number of advantages over conventional techniques.

Due to the welding being made with the segment on the respective stiffening ring, instead of the ring being inserted into the segment, time is saved, and the requirements for tolerances between the tubular member and the stiffening ring are less, which eases fabrication substantially.

Similarly, due to the placing of the tubular member on top of the stiffening ring during fabrication of the segments, tolerance requirements between individual tubular members are significantly reduced. In conventional manufacturing methods where the tubular members are placed directly on top of each other, the diameter and roundness of two adjacent tubular members need to be the same in order to obtain a joint without stress concentrations arising as a consequence of misalignment between the tubular members. In the manufacturing method according to the invention, certain variations of diameter and roundness of two adjacent tubular members are allowable, since the stiffening ring inserted between the tubular members will significantly reduce stress concentrations arising as a consequence of misalignment between the tubular members.

All in all, the method is an improvement in the assembly of buoyancy elements for offshore structures, for example when used for assembling a buoyancy module of a tubular floating wind turbine offshore structure.

In some concrete embodiments, a first welding station is provided which comprises a plurality of rollers which are arranged in circular configuration, and which are configured for rotationally supporting a first stiffening ring on the rollers in horizontal orientation during the welding between a first tubular member and the first stiffening ring. As it will become apparent below, this first station is used for welding of subsequent tubular members onto respective rings in order to provide additional segments for assembling multi-segment tubes. In the first welding station, one or more welding machines are provided for the welding.

In some embodiments one or more welding machines are places on both the outside and the inside of the tubular member, thereby facilitating simultaneous welding on both sides of the welding seam.

The welding machines are advantageously provided at fixed locations of the first welding station, and the welding of the tubular member to the stiffening ring is done while rotating the combination of tubular member and stiffening ring about its vertical central axis, instead of moving the head along the edge.

This practical embodiment is advantageous in that the stationary welding machines need minimal and only simple mechanical support as compared to welding machines moving around the ring, as in the case of large movements of the head, precision can be a challenge. This is especially so when the segments have a diameter in the range of 5 to 15 meters.

In an advantageous embodiment, a second welding station is provided, comprising a plurality of rollers arranged in circular configuration and configured for rotationally supporting the first segment with its second ring-free edge when the respective first ring is facing upwards and in horizontal orientation.

In practice, after welding of the first tubular member to the first stiffening ring in the first welding station in order to obtain the first segment, the resulting first segment is turned upside down so that the first stiffening ring is facing upwards, and the first segment is lifted onto the second welding station with the rollers rotationally supporting the second edge of the first segment.

Optionally, for protection of the rollers against the potentially sharp downward facing edge, a support ring or support plate is provided between the downward facing edge and the rollers. After welding of the second tubular member to the second stiffening ring in the first welding station, the resulting second segment is turned upside down so that the second ring is facing upwards. The second segment is lifted onto the first ring of the first segment in the second welding station to form a double segment.

Advantageously, as explained for the first welding station, one or more welding machines are places on both the outside and the inside of the tubular member, thereby facilitating simultaneous welding on both sides of the welding seam. The welding machines are advantageously provided at fixed locations of the second welding station, and the welding of the segment to the ring is done while rotating the two segments about their vertical axes, instead of moving the head along the edge.

Optionally, the height of the welding heads of the welding machines are adjustable, for example by being mounted on the arm of a welding robot. Thereby, the height of the welding head can be adjusted to match the height of the single segment. However, if all segments have a single standardized height, no height adjustment of the head is necessary.

For extending the multi-segment structure in length even further, which is typically done in practice in order to construct a buoyancy module of a desired height, additional segments can be fabricated and joined to the segments that are already joined by welding.

In a preferred embodiment, an additional segment is fabricated using the same method as that used to fabricate the first segment. After fabrication, this additional segment is turned upside down and is lifted onto the second welding station. Then, the already assembled structure comprising two or more segments is placed from above on top of the additional segment with a vertical axis that is concentric or approximately concentric with the vertical axis of the additional segment. In this position the tubular member of the first segment and the stiffening ring of the second segment are joined by welding, the welding forming a watertight seam.

This method may be repeated with as many segments as relevant in order to achieve the desired height It is pointed out here that the method of lifting the already combined multi-segment with two or more segments onto an additional segment may appear counterintuitive as compared to lifting one single segment after the other on top of the already welded multisegment. However, as will be explained below, this arrangement is made for good reason, as the welding head does not have to be lifted upwards with each added segment. Instead, by lifting the already welded multi-segment first to a storage station and then always onto only a single segment for next the welding, the welding head need not be lifted higher than the height of the single segment, which is typically in the range of 2 to 10 meters.

As mentioned above, for protection of the rollers, the second welding station optionally comprises a support-ring or support-plate in between the rollers and the second downward facing edge of the single segment that is lifted off the first and onto the second welding station. This is the more important, the more segments are welded together into an elongate tube, as the weight increases proportionally.

Advantageously, one, but rather both, welding stations comprise not only first rollers that support the combination of segment and ring from below but also second rollers that abut the combination sideways for positioning and guiding the rings and tubular members correctly during rotation and simultaneous welding.

SHORT DESCRIPTION OF THE DRAWINGS

The invention will be explained in more detail with reference to the drawing, where FIG. 1 illustrates a rotational support arrangement for a welding station;

FIG. 2 shows three stations for the welding;

FIG. 3 A shows a first assembly step in perspective view

FIG. 3B shows a first assembly step in a side view;

FIG. 4-9 show subsequent steps for assembly of a double-segment;

FIG. 10A shows a further assembly step in perspective view with a third segment in side view;

FIG. 10B shows a further assembly step in perspective view with a third segment in preparation;

FIG. 11 A shows assembly of triple-segment in a side view; FIG. 1 IB shows assembly of triple-segment in perspective view;

FIG. 12 illustrates a side view of a movement of a triple-segment to a storage station;

FIG. 13 illustrates a side view of a triple-segment in the storage station;

FIG. 14 illustrates a perspective view of a triple-segment in the storage station and preparation of a fourth segment in the first welding station;

FIG. 15 A shows welding machines in the first and second welding station in perspective view;

FIG. 15B shows an enlarged section of a welding machine in the first welding station.

DETAILED DESCRIPTION / PREFERRED EMBODIMENT

FIG. 1 illustrates a rotational support arrangement for a welding station 1. It comprises a plurality of first rollers 5 on corresponding first frames 4 for rotationally supporting circular tubular segments from below for welding. The first frames 4 and first rollers 5 are arranged in a circular configuration for supporting corresponding circular structures. It also comprises second rollers 6 on corresponding second frames 7 for abutting such circular tubular structures from the side and guide them properly in rotational movement about a vertical central axis.

Optionally, the second rollers 6 are radially movable in and out in a horizontal direction. This is useful if the segment diameter changes and also in order to easier fit a ringshaped segment into the roller station 1, even if it deviates slightly from a circle.

FIG. 2 shows three stations for the welding. A first welding station 1 and a second welding station 1’ are provided in addition to a third station, which is a storage station 1”, the latter comprising a stationary support ring 9’. A support ring 9 is provided on the second welding station 1’, for example similar to the support ring 9’ of the storage station 1”. With further reference to FIG. 1, the support ring 9 is supported by the first rollers 5 and secured to be guided in a circle by the second rollers 6. Instead of the support ring 9, a support plate is optionally used on the second welding station 1’.

FIG. 3 A in perspective view and FIG. 3B in a side view show a first assembly step using the first welding station 1 and second welding station 1’. A stiffening ring 10 is placed onto the support rollers 5 of the first welding station 1 for rotation about a vertical axis X, guided by the second rollers 6 abutting its outer periphery. FIG. 4 illustrates the placement of a first tubular member 11 onto the stiffening ring 10 with the first edge 11 A of the first tubular member 11 abutting the upper surface of the stiffening ring 10. Advantageously, the first edge 11 A has a smaller diameter than the stiffening ring 10 in order to ensure that the entire first edge 11A is resting on the stiffening ring 10 and is leaving sufficient space for a fillet weld, even if the first edge 11A is slightly deviating from a circular shape, for example due to deformation by transport and handling. The orientation of the first tubular member 11 being positioned on top of the stiffening ring 10 has an advantage in that the welding can be done from above, which is easier that welding from below, especially due to the melting of metal during the welding.

FIG. 5 A illustrates the turning and movement of the first segment fabricated by welding of the tubular member 11 and the stiffening ring 10 from the first welding station 1 onto the second welding station 1 ’ . The final result of the turned first segment onto the second welding station 1’ is illustrated in FIG. 5B. The arrow 8 illustrates the orientation of the segment relatively to the upside-down orientation in FIG. 5 A, where the arrow 8 points downwards. While, the first edge 11 A of the first tubular member 11 is welded to the first stiffening ring 10, the second edge 11B of the first tubular member 11 is resting on the support ring 9 but not getting fastened to the support ring 9, as the support ring 9 remains on the rollers 5 of the second support station 1 ’ for supporting the various segments which are subsequently placed with their downward facing edge onto the support ring 9.

FIG. 6 illustrates the preparation of a second segment, where the first edge 12A of the second tubular member 12 is welded to a second stiffening ring 10 in the first welding station 1. The second stiffening ring 10, in the present exemplified case, is similar in dimensions to the first stiffening ring 10, although, this is not strictly necessary. The procedure is identical to the one for the first segment, illustrated in FIG. 4 and explained above.

As illustrated in FIG. 7A, once finished with the welding in the first welding station 1, the second segment is turned and lifted onto the top of the first segment in the second welding station 1’ such that the second and downward facing edge 12B of the second segment 12 is abutting the first stiffening ring 10 of the first segment 11 for welding, which is illustrated in FIG. 7B. By the welding in the second welding station 1’, the two segments form a double segment 12/11 with two tubular segments 11, 12 fastened to each other with the first stiffening ring 10 as a single ring in between the two mutually adjacent tubular members 11, 12 and the second stiffening ring 10 at the top. The second edge 1 IB of the first segment 11 is resting on the support ring 9.

In the illustrated procedure, the first segment is lifted onto the second welding station 1’, and the second segment is lifted on top of the first segment. Alternatively, the first segment is lifted off the first welding station 1 and onto the storage station 1”, and the second segment after welding is lifted from the first welding station 1 onto the second welding station 1’, after which the first segment is lifted from the storage station 1” onto the second segment in the second welding station 1’. This is possible but not preferred, as it requires an additional lifting operation. Noting the substantial size of the segments, with typically 5-10 meters diameter, the number of operations is advantageously minimized.

Subsequently, the double-segment 12/11 is lifted off the second welding station 1’ and, as illustrated in FIG. 8, stored in the storage station 1 ’ ’ with the downward facing second edge 1 IB of the first tubular member 11 resting on the support ring 9’ of the storage station 1”.

FIG. 9 illustrates the welding of a third tubular member 13 to a third stiffening ring 10. As illustrated in FIG. 10A, the resulting third segment is lifted off the first welding station 1, turned, and lifted with the downward facing second edge 13B of the third tubular member 13 onto the upper surface of the support ring 9 of the second welding station 1’ and with its stiffening ring 10 facing upwards, as illustrated in FIG. 10B.

As illustrated in FIG. 11 A, the double segment 12/11 is then lifted off the storage station 1 ’ ’ and with the downwards facing second edge 1 IB of the first tubular member 11 onto the third support stiffening ring 10 on top of the third tubular member 13, resulting in a configuration as illustrated in FIG. 11B. In the second welding station 1’, the downwards facing second edge 1 IB of the first tubular member 11 is welded onto the third support stiffening ring 10 on top of the third tubular member 13 to form a triple-segment 12/11/13.

As illustrated in FIG. 12, the triple-segment 12/11/13 is lifted off the second welding station 1’ and, as shown in FIG. 13, stored in the storage station 1”. As illustrated in FIG. 14, a fourth segment is produced in the first welding station 1 by using a further tubular member 14 and a further stiffening ring 10, and the explained procedure repeated for as many segments as desired to form the final buoyancy structure.

Although, requiring additional lifting steps, the illustrated procedure has some advantages as compared to an alternative, in which the double-segment 12/11 is not lifted off the second welding station 1’ but the third segment 13 is lifted onto the top of the double segment 12/11, and the fourth segment 14 is lifted on top of the triple-segment. By lifting and moving the double segment 12/11, and correspondingly the triple segment 12/11/13 twice, namely from the second welding station 1’ to the storage station l” "and back onto the second welding station 1’ when a further single segment has been placed in the second welding station 1’, it is always the lowest segment in the second welding station 1’ that is welded. Accordingly, a welding head in the second welding station 1’ need not be lifted upwards due to addition of segments. As the tubular members 11, 12, 13, 14 of the segments typically have the same height, there is no need for moving the welding head for the assembly upwards with every added ring, which minimizes complexity in construction and operation as well as speed, in particular because the lifting and welding at the two stations 1, 1’ can be done simultaneously.

A welding machine 15 is illustrates in FIG. 15A and in close up view in FIG. 15B. As illustrated in FIG. 15 A, welding of the third tubular member 13 onto the corresponding stiffening ring 10 can be done simultaneously with the welding of the second tubular member 12 onto the stiffening ring 10 already welded to the first tubular member 11 of the first segment.

As illustrated in FIG. 15B, the welding machine 15 has a stationary base 16 and welds the third tubular member 13 onto the third stiffening ring 10 from above. The welding machine 15 has a linked arm 17 or moving the welding head 18 to the welding location. The distance of the welding head 18 from the stationary base 16 is adjustable for slight variations of the welding position and angle, but the welding machine 15 is not configured for reaching to the upper edge 13B of the third tubular member 13. This was explained above with the objective of simplicity of the welding station 15. However, as explained above in detail, it makes it necessary to move the longer multi-segments onto the storage station 1 ’ ’ and then from the storage station 1 ’ ’ onto the top of the stiffening ring 10 of a segment with only a single tubular member, once this additional singlesegment has been fabricated in the first welding station 1 and moved to the second welding station 1’.