Title:
METHOD AND SYSTEM FOR AUTOMATIC ESTABLISHMENT OF OPTIMAL SCHEDULE FOR CONSTRUCTION PROJECT
Document Type and Number:
WIPO Patent Application WO/2024/010137
Kind Code:
A1
Abstract:
Disclosed is a method and system for automatic establishment of an optimal schedule for a construction project. The disclosed method of automatic establishment of an optimal schedule for a construction project is a computer-implemented method of automatic establishment of an optimal schedule for a construction project, the method including: providing project data, standardized schedule data, and characteristic data (S10); generating project schedule data by combining the project data, the standardized schedule data, and the characteristic data (S20); and deriving an optimal project schedule by processing the project schedule data through a scheduling optimization algorithm (S30).
Inventors:
YOO BYUNG CHUL (KR)
BAEK HYEON GI (KR)
LEE HYUN IL (KR)
PARK YONG DUK (KR)
JEONG KI YONG (KR)
KIM JAE EUN (KR)
BAE SYUNG HOUN (KR)
BAEK HYEON GI (KR)
LEE HYUN IL (KR)
PARK YONG DUK (KR)
JEONG KI YONG (KR)
KIM JAE EUN (KR)
BAE SYUNG HOUN (KR)
Application Number:
PCT/KR2022/013566
Publication Date:
January 11, 2024
Filing Date:
September 08, 2022
Export Citation:
Assignee:
SAMSUNG ENG CO LTD (KR)
International Classes:
G06Q50/08; G06F17/18; G06Q10/04; G06Q10/06
Foreign References:
KR100968708B1 | 2010-07-06 | |||
JP2002207851A | 2002-07-26 | |||
US20220101235A1 | 2022-03-31 | |||
US20170286508A1 | 2017-10-05 | |||
US20190377602A1 | 2019-12-12 |
Attorney, Agent or Firm:
Y.P.LEE, MOCK & PARTNERS (KR)
Download PDF: