Abstract:
A method for removing or installing an offshore jacket structure (15) in a body of water utilises a vessel (1) having a generally planar main buoyancy section (2) having in plan view substantially the outline of a delta with an extension (4, 5) at the apex and auxiliary buoyancy sections (3, 8) extending transversely of the main buoyancy section at the ends of the base of the delta. The bottom parts (8) of the auxiliary buoyancy sections (3) are pro-vided with a rounded outer surface (11) and contain heavy fixed ballast (12). By suitable ballasting the vessel (1) may be rotated so that the main section (2) forms an angle less than 90 degrees with the water surface (17) as it is brought close to the jacket structure with the auxiliary sections (3) straddling the jacket structure. In this position the vessel is rotated towards the jacket structure while its rounded bottom portion (11) rolls on the seabed (16), thus permitting good control of the movements of the vessel in a critical phase of the removal process. Once the jacket structure (15) has been connected securely to the vessel (1), the vessel is rotated back to the initial position while still in contact with the seabed by de-ballasting the auxiliary sections (3) before it is brought to the surface. The vessel is made from stiffened flat steel plates and can therefore be efficiently manufactured in commonly equipped shipyards.

Inventors:
NATVIG BIRGER J (NO)
Application Number:
PCT/NO2004/000327
Publication Date:
May 06, 2005
Filing Date:
October 27, 2004
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
DELTA LIFTER TECHNOLOGIES AS (NO)
NATVIG BIRGER J (NO)
International Classes:
B63B35/00; B63B35/40; B63B35/42; B63C7/08; E02B17/00; E02B17/02; B63B; E02B; (IPC1-7): B63B35/42
Foreign References:
US3859804A1975-01-14
US6540441B12003-04-01
US3347052A1967-10-17
US5111764A1992-05-12
Attorney, Agent or Firm:
Oslo, Patentkontor AS. (OSLO, NO)
Download PDF:
Claims:
Claims
1. A method for removing an offshore jacket structure (15) standing on the seabed (16) in a body of water, said method comprising the steps of: (a) providing a ballastable vessel (1) having a main buoy ancy section (2) and two auxiliary buoyancy sections (3) located above and on either side of the main section (2), said main section (2) being generally horizontal in the normal floating condition of the vessel (1), (b) bringing said vessel (1) into the vicinity of the jacket structure (15), (c) ballasting the vessel (1) so as to rotate the main sec tion (2) to an approximately vertical condition and bring ing the main section into contact with the jacket structure (15), the auxiliary buoyancy sections (3) now being located on opposite sides of the jacket structure, (d) securing the vessel (1) to the jacket structure (15) and deballasting the vessel so as to raise the vessel with the jacket structure to the water surface (17) while rotat ing the main section back to the generally horizontal posi tion, c h a r a c t e r i s e d i n that in step (c) the main section is at first rotated less than 90° from the horizon tal, next it is lowered so that its lower end (11) rests on the seabed (16) adjacent to the jacket structure (15), and whereupon it is rotated beyond 90° into contact with the jacket structure (15) while its lower end (11) is in con tact, preferably in substantially rolling contact with the seabed (16).
2. A method according to claim 1, c h a r a c t e r i s e d i n that in step (d), before raising the vessel with the jacket structure, the auxiliary sections (3) are deballasted in order to rotate the vessel (1) with the jacket structure (15) while the lower end (11) of the vessel is substantially in rolling contact with the seabed until the main section (2) of the vessel forms an angle with the sea surface (17) of 30°70°, preferably about 60°.
3. A method according to claim 1 or 2, c h a r a c t e r i s e d by using a vessel (1) having in plan view substantially the shape of a delta with an exten sion (4,5) at the apex, the extension forming the fore part of the vessel and the base (8,9) of the delta forming the aft part, the auxiliary buoyancy sections (3) being lo cated at the ends (8) of the base.
4. A method according to any one of the preceding claims, c h a r a c t e r i s e d by providing the vessel (1) with heavy permanent ballast (12) in the aft part, preferably in the lower parts (8) of the auxiliary buoyancy sections (3).
5. A seagoing vessel (1) for removing or installing and transporting an offshore jacket structure (15), said vessel comprising a ballastable main buoyancy section (2) and two auxiliary buoyancy sections (3) protruding on either side of the main section, c h a r a c t e r i s e d i n that the main buoyancy section (2) is generally planar and has in plan view sub stantially the outline of an isosceles triangle with an ex tension at the apex, said extension (4,5) forming the fore part of the vessel (1) and the base (8,9) of the triangle forming the aft part, the auxiliary sections (3) being lo cated at the ends (8) of said base.
6. A vessel according to claim 5, c h a r a c t e r i s e d i n that a transverse buoyancy section (9) is bridging the gap between the auxiliary buoy ancy sections (3), each auxiliary buoyancy section (3) com prising a single column.
7. A vessel according to claim 5 or 6, c h a r a c t e r i s e d i n that at least the main section (2) of the vessel is made from stiffened flat steel plates.
8. A vessel according to claim 5,6 or 7, c h a r a c t e r i s e d i n that it is provided with heavy permanent or semipermanent ballast (12) in the aft part, preferably in the lower parts (8) of the auxiliary buoyancy sections (3).
9. A vessel according to any one of claims 68, c h a r a c t e r i s e d i n that it has a pump room (10) in the transverse buoyancy section (9) and a control room (5) in the fore part.
10. A vessel according to any one of claims 59, c h a r a c t e r i s e d i n that it has external sur faces, preferably rounded surfaces (11), at the lower ends of the auxiliary buoyancy sections (3,8) configurated to permit the vessel, when in use, to pivot towards or away from said jacket structure (15) while in contact with the seabed (16).
Description:
A method and vessel for removing offshore structures The present invention relates to a method for removing an offshore jacket structure standing on the sea bed in a body of water in accordance with the preamble of claim 1. The invention also relates to a seagoing vessel for removing or installing and transporting an offshore jacket structure as recited in the preamble of claim 5.

US 6540441 describes a transporter for removing offshore jacket structures, said transporter having an elongate cra- dle-like structure made from tubular elements. The cradle- like structure has a U-shaped cross section. When approach- hing a jacket structure to be removed, the transporter is rotated 90° and floated in vertical orientation so as to embrace the jacket on three sides. After the transporter has been attached to the jacket and the legs of the jacked severed, the transporter with the jacket is raised through de-ballasting and rotated back to the horizontal position before being towed to a predetermined destination for the jacket. Even though the transporter in its vertical posi- tion is moved towards the jacket both by means of tugs and winches, it has a quite substantial water line area which makes it prone to uncontrolled movements caused by environ- mental forces like waves, such movements being particularly critical in the connecting phase since the jacked could easily be damaged. The transporter according to US 6540441 also has the drawback of being larger than necessary in the sense that it has about twice as much buoyancy as necessary for carrying the jacket structure. This is because the sides of the U-shaped cradle will be entirely above the wa- ter in a towing situation.

The purpose of the present invention is to alleviate the drawbacks mentioned above and to provide a method and ves- sel that will permit the vessel to approach the jacket structure in a safe and controlled manner also under in- clement weather conditions, while the shape of the vessel

is such that it has little excess buoyancy and is easy to build with common shipyard technology and equipment.

This is obtained according to the invention by a method as recited in claim 1 and a vessel as recited in claim 5. Ad- vantageous embodiments of the inventions are recited in the respective dependent claims.

For better understanding of the invention it is referred to the following description of the exemplifying embodiment shown in the appended drawings, where: Figure 1 shows a schematic, isometric view of a vessel ac- cording to the invention, Figures 2-10 show side views of various stages of a method according to the invention for removing a jacket structure.

The vessel 1 shown in Figure 1 comprises a generally pla- nar, ballastable main buoyancy section 2 and two auxiliary buoyancy sections 3 protruding from the main section. At the fore end, the main buoyancy section 2 has a rectangular box section 4, also labelled the nose section, where the forward part 5 will serve as reserve buoyancy during sub- merging operations and will thus always be above the still water level. This forward part may contain a control and power room served by an umbilical cable (not shown) running from a standby and support vessel (not shown). Connected to the nose section 4 is a trapeze-shaped transition section 6, from which two diverging branch pontoon sections 7 ex- tend and are joined to footing sections 8 for the auxiliary buoyancy sections or columns 3. The footing sections 8 are joined by a transverse buoyancy section 9 bridging the gap between the distal ends of the diverging branch sections 7.

The transverse section 9 contains a pump room 10.

Generally speaking, in plan view the vessel is delta-shaped with a nose section added at the apex, or it may also be likened to a Y, except for the transverse section 9.

With the exception of the control room 5 and pump room 9, the complete vessel 1 is subdivided into ballast compart- ments. This is indicated in the side view in Fig. 2, which also shows that the footing sections 8 has a rounded bottom portion 11 which contains a heavy permanent or semi- permanent ballast 12.

The vessel 1 is preferably made as a stiffened flat plate construction all-over. Although such a construction is heavier than a tubular construction for the same buoyancy, the flat plate construction has several advantages. For in- stance, flat plate constructions can be efficiently manu- factured in shipyards due to their long established highly mechanised production lines for such structures. The steel material will not be a major cost factor in this connec- tion. The heavier plating required at the deep submergence end of the vessel will contribute to the fixed ballast needed at this end for reasons of hydrostatic stability during the submergence operation, as will be explained later. The flat plate construction further provides flat deck surfaces that will simplify and reduce the cost of providing jacket support points due to the freedom to choose the position of such points. Fig. 2 shows pre- installed jacket support stools 13 and heavy brackets 14 for connection to the jacket structure 15.

Although the size of the vessel 1 will depend on the size of the jacket structures 15 to be removed or installed, a preferred embodiment for service in the North Sea has an overall length of 115 meter, a maximum width of 100 meter and auxiliary columns 37 meter high. The steel weight is about 6200 tons and the fixed ballast 5000 ton. The dis- placement is about 30 000 ton for the main buoyancy section

and about 11 000 ton for the auxiliary buoyancy columns.

The maximum steel plate thickness is about 40 mm.

Such a vessel would be able to handle jacket structures weighing about 8000 ton.

The method according to the invention will be described be- low with reference to Figures 2-10. In Fig. 2, the vessel 1 according to the invention is shown in semi-ballasted con- dition near a jacket structure 15 to be removed. The shaded areas of the vessel indicate ballasted compartments. The vessel is brought in this position by means of tugs (not shown). No anchoring or any other form of traditional moor- ing system need be used during the manoeuvring of the ves- sel towards the jacket, thus avoiding amplified second or- der horizontal motion of the vessel.

In Fig. 3 ballast has been shifted from the fore part to the footing sections 8 to make the vessel rotate an angle less than 90° from the horizontal. The vessel may be in equilibrium in the position shown due i. a. to the fixed ballast 11. Other equilibrium positions may be obtained through proper ballast adjustments.

In Fig. 4 the vessel 1 has been moved closer to the jacket 15 so that the auxiliary buoyancy columns 3 straddle the jacket. More ballast has been added to the columns 3 in or- der to bring the rounded bottom portion 11 of the footings 8 to rest on the seabed 16 close to the jacket 15. While in this position, further ballast is added to build up suffi- cient bottom contact pressure to prevent the vessel 1 from lifting from the sea bed during design wave conditions.

During the procedure of bringing the vessel 1 to the posi- tion shown in Fig. 4, the only duty of the tugs is to coun- teract the mean environmental loads, e. g. wind, waves and current. From recordings of wave, wind and current sensors these loads are estimated and are apportioned to each tug.

From constant tension winches (not shown) on top of the nose section 5 of the vessel, lines are run through pulleys on the lower part of the vessel to the jacket where they are connected. From measurements of the mean loads in these lines, corrections of the tug trust loads will be appor- tioned to improve the ability of the tugs to counteract the mean environmental loads. The reason for this load sharing strategy is to relieve the connecting lines from carrying environmental loads so that the line strength can be used to apply manoeuvring loads only.

In Fig. 5 further ballast has been added to the auxiliary columns 3 in order to rotate the vessel beyond 90° so that the main section 2 is in contact with the jacket 15 by means of its support stools 13 and connecting brackets 14.

This removal operation assumes that the legs of the jacket structure have been cut in advance. It may be necessary to fix e. g. a sleeve arrangement around some of the legs in order to prevent the cut ends from slipping off their con- tact surfaces when bringing the vessel 1 into contact with the jacket. However, the slender shape of the fore part of the vessel makes it relatively wave transparent, thus mini- mizing the wave induced forces transferred from the vessel to the jacket.

Before lifting of the jacket can start, the brackets 14 will have to be securely connected to legs of the jacket.

These connections can be of a direct welded type, a gripper type, a wedge type, or any suitable type known to the skilled person. The purpose of these connection brackets is to carry the complete weight of the jacket as it is lifted from the seabed.

When the preparations for lifting the jacket are completed, ballast water is pumped out of the vessel 1. This may be done in a way to make it first move mainly vertically from the seabed before starting the rotation movement. In some

applications, however, it may be preferable to start the removal of the ballast water in such a way that the vessel 1 and jacket 15 are rotated while the bottom rounded part 11 of the vessel is still in contact with the seabed 16.

This sequence is illustrated in Figures 6 and 7. This will transfer some of the weight of the jacket 15 to the support stools 13 of the vessel 1, thus taking some of the stress off the connecting brackets 12. As a result, the initial lifting of the jacket can be performed in a controlled man- ner with less risk of the jacket breaking loose from the vessel due to unexpected environmental influence or other unforeseen circumstances. It will be understood that the rotating movement from the Figure 6 to the Figure 7 posi- tion, wherein the main section 2 of the vessel may have as- sumed an angle of about 60° with the water surface 17, is obtained by removing ballast from the auxiliary columns 3.

When in the Fig. 7 situation, further ballast is removed in order to lift the vessel and jacket from the seabed, as in- dicated in Fig. 8. Further de-ballasting, primarily of the transverse pontoon section 9, will bring the vessel and jacket through the position illustrated in Fig. 9 to the final position in Fig. 10. After securing the jacket 15 to the vessel 1, the vessel may be towed to the final destina- tion of the jacket.

It will be noted that during the entire procedure described above, a part of the nose section 5 is always above the wa- ter for stability reasons.

It will be understood that the vessel according to the in- vention also may be used for installing a jacket structure.

In this case, the method according to the invention will be performed essentially in the reverse order, except that no winches are necessary on the vessel.

The heavy permanent or semi-permanent ballast 12 in the vessel 1 may consist of concrete, iron or mud, brine or the

like. In this context, semi-permanent means that the bal- last may be removed, but not by simple pumps. Furthermore, the heavy ballast may at least partly be provided through the use of heavier plating than otherwise necessary in the area of the footings 8 of the columns 3. Although these columns in the exemplifying embodiment described above are shown having a quadrangular cross section, if expedient, they may have an oval or circular cross section, or consist of a cluster of tubular members, e. g. taken from legs of an already scrapped jacket structure.

In the embodiment described above the water depth permits the vessel to be set down on the seabed before attachment to the jacket. However, it is also possible to use the ves- sel according to the invention in somewhat deeper water where the vessel would not be able to touch the seabed without becoming totally immersed. In such cases, the ves- sel will still approach the jacket at an angle, but this will occur at some distance above the seabed. The draft of the vessel will be determined by the amount of overhang permitted by the available capacity in the vessel to shift the centre of buoyancy to compensate for the offset centre of gravity.

Although the invention has been described above with refer- ence to a specific exemplifying embodiment, it will be clear to the skilled person that the invention may be var- ied and modified within the frame of the invention defined by the elements of the appended claims and their equiva- lents.