Title:
MODELLING A POWER PRODUCTION NETWORK FOR DISTRIBUTING THE LOAD
Document Type and Number:
WIPO Patent Application WO/2009/083639
Kind Code:
A1
Abstract:
The modelling arrangement of the configuration situation of the electric power transmission network according to the invention comprises a modelling element (7) designed to be installed in each generator of the electric power transmission network. The modelling element (7) is arranged to measure the state of the said switches until an open switch is detected and to detect the corresponding generator on the basis of the closed switch and thus to model the power transmission network comprising the detected generators and the area of the power transmission network belonging to the same electric network via closed switches.

More Like This:
JP2007535888Power supply device
Inventors:
SAIKKONEN ARI (FI)
KAAS TOM (FI)
KLOCKARS STIG (FI)
Application Number:
PCT/FI2008/050702
Publication Date:
July 09, 2009
Filing Date:
December 02, 2008
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
WAERTSILAE FINLAND OY (FI)
SAIKKONEN ARI (FI)
KAAS TOM (FI)
KLOCKARS STIG (FI)
International Classes:
H02J4/00; H02J13/00
Foreign References:
US4808835A1989-02-28
Other References:
KAI HUANG ET AL: "A novel algorithm for agent based reconfiguration of ring-structured shipboard power system", INDUSTRY APPLICATIONS CONFERENCE, 2005. FOURTIETH IAS ANNUAL MEETING. CONFERENCE RECORD OF THE 2005 HONG KONG, CHINA 2-6 OCT. 2005, PISCATAWAY, NJ, USA,IEEE, vol. 2, 2 October 2005 (2005-10-02), pages 1311 - 1316, XP010842552, ISBN: 978-0-7803-9208-3
Attorney, Agent or Firm:
AWEK INDUSTRIAL PATENTS LTD OY (Lautatarhankatu 6, Helsinki, FI)
Download PDF:
Claims:
Claims

1. A modelling arrangement of a configuration situation of an electric power transmission network of ships, characterized in that the arrangement comprises a modelling element (7) designed to be installed into each generator of the electric power transmission network, each generator (1 ) of the network being connectable to the other generators via two connection routes having equipped with different switches (2, 3), the power transmission network being a line or a loop and the generators having consecutive identifiers, the modelling element (7) being arranged to measure a state of said switches in both connection routes until an open switch or end is detected at said routes and to detect on the basis of each closed switch the corresponding generator of the closed switch and to model the power transmission network comprising the detected generators and an area of the power transmission network belonging to the same electric circuit via the closed switches.

2. An arrangement according to claim 1 , characterized in that the arrangement comprises a data vector comprising generator-specific elements (12) in which element a certain part (14) of it is designed for status data of the switches and the modelling element (7) is arranged to update the generator-specific element of the data vector and the status data of the switches and the data vector being arranged to be broadcast to other generators of the network.

3. An arrangement according to claim 1 or 2, characterized in that the modelling element (7) is arranged to use the identifiers of the generators.

4. An arrangement according to claim 3, characterized in that the modelling element (7) is arranged to first measure the first connection route and then the second connection route.

5. An arrangement according to claim 4, characterized in that the modelling element (7) is arranged to repeatedly measure the status data of the switches.

6. An arrangement according to claim 4 or 5, characterized in that the modelling element is carried out by means of software.

7. An arrangement according to claim 4 or 5, characterized in that the modelling element is carried out by means of an ASIC circuit or other electric circuit. 8. An arrangement according to claim 6 or 7, characterized in that the modelling element is installed in a generator.

9. An arrangement according to claim 8, characterized in that the generator is installed in the power transmission network.

10. A method of modelling a configuration situation of an electric power transmission network, characterized in that the arrangement is designed to be carried out in each of the generators of the electric power transmission network, each generator (1 ) of the network being connectable to other generators via two connection routes having different switches (2, 3), the power transmission network being a line or a loop and the generators having consecutive identifiers, the method comprising the steps of:

- measuring (62, 64) the status of said switches on both connection routes until a closed switch (63, 66) is detected on said routes,

- detecting (63) on the basis of each closed switch the corresponding generator of the closed switch and - modelling (65) a part of the power transmission network comprising the detected generators and an area of the power transmission network belonging to the same electric circuit via the closed switches.

11. A method according to claim 10, characterized in that in the detection and modelling steps the configuration of the network and the consecutive identifiers of the generators are used.

12. A method according to claim 10 or 11 , characterized in that the measuring step is arranged to first measure the status of the switches the first connection route, subsequent to which the status of the switches of the second connection route is measured.

13. A method according to claim 12, characterized in that the measurement data of the switches is arranged to be transmitted to a certain place of the data vector, the data vector being arranged to be broadcast to other generators of the power transmission network.

14. A method according to claim 13, characterized in that the method is arranged to repeatedly measure the status data of the switches.

Description:

MODELLING A POWER PRODUCTION NETWORK FOR DISTRIBUTING THE LOAD

Field of invention The present invention relates to an electric power transmission network to which electricity-producing devices and loads can be connected. The invention especially relates to electrical power transfer networks in ships.

Background art The electric power transmission networks of ships are relatively small.

Generators are connected thereto for supplying the ship's demand of electric power. Each generator is driven by a power source, such as a diesel engine. The generators run in the electric network at the same speed so as to have the same frequency in all places of the electric network. It is not possible to economically store electricity, so the production of electricity must correspond to the consumption of electricity of the network. Thus there must be some kind of arrangement in the power transmission network for distributing the load among the generators.

A known way is to use droop adjustment, i.e. deviation adjustment. Each generator has a power production line as a function of the frequency of the network. When the load is large, the frequency of the network tends to increase, and when the load is small, the frequency tends to increase. Thus, the disadvantage is that the frequency of the constant state of the system depends on the load of the system.

Another way is to use so-called isosynchronic load distribution. In this method the average load of the system is used for establishing the set values for the generators for distributing the load. The principle of the isosynchronic adjustment is similar to deviation adjustment, but it does not depend so much on the load of the network.

Digital data communication buses have become more common to replace the older analog buses used for load distribution. The advantages of digital buses are their accuracy, reliability, lack of disturbances. Analog solutions have, however, been

very adaptable to various configurations of the network. With a digital solution, it is difficult to mimic an analog power transmission network. Typically the power transmission network comprises switches the state of which can be changed, if necessary, either automatically or manually. Software, circuit board or other apparatus used for load distribution easily becomes very complex.

Brief description of the invention

The aim of the present invention is to reduce the above-mentioned disadvantages caused by digital solutions. The aim is achieved as described in the main claim. The dependent claims describe the various embodiments of the invention.

The modelling arrangement of the configuration situation of the electric power transmission network comprises a modelling element 7 designed to be installed in each generator of the electric power transmission network. In the power transmission network each generator 1 can be connected to other generators via two separate connection routes provided with a switch 2, 3. The power transmission network is a line or a loop and the generators have consecutive identifiers. The modelling element 7 is arranged to measure the state of the said switches on both connection routes until an open switch is detected at the routes and to detect the corresponding generator on the basis of the closed switch and to model the power transmission network comprising the detected generators and the area of the power transmission network belonging to the same electric circuit via closed switches.

List of figures

In the following the invention is described in more detail by reference to the figures in the appended drawings, in which

Figure 1 illustrates an example of the power transmission network connection of the generator according to the invention,

Figures 2 and 3 illustrate the possible network topologies,

Figure 4 illustrates the detection of the network according to the invention,

Figure 5 is an example of a data communications vector sent in the data communications network and Figure 6 is an example of the inventive method.

Description of the invention

Figure 1 illustrates an example of a generator 1 and its connection to a power transmission network 4. As can be seen, the generator is connected to the power transmission network by two switches 2, 3. Thus, the part between the switches can be interpreted as being a part of the power transmission network, because electric current can flow through it when at least one switch is closed. Due to two switches, electric power can be fed from the generator to both directions of the power transmission network 4 or to either direction only. Generator 1 is driven by, for example, an internal combustion piston engine or a gas turbine. Due to the use of two generator-specific switches the power transmission network is very adaptable. Thus, each generator has two connection routes to the rest of the network.

Figures 2 and 3 illustrate possible network topologies. The power transmission network 4, 5 can be a line or a loop. These are the only possible network topologies for detecting of the network according to the invention. In relatively small networks, such as in ships, this is not a disadvantage. In fact, this can facilitate planning of the network.

Each generator 1 - 1 G has its own identifier. Consecutive machines in the network have consecutive identifiers. If a new generator is added to a point in an existing network, it and the generators after it must be given a new identifier. Thus the identifier of the generator can be used for outlining the position of the generator, as is shown later.

Figure 4 illustrates an example of the operation according to the invention. In order to make isosynchronic load sharing possible, a number of parameters/signals must

be transmitted between generators. A CAN bus (Controller Area Network) 6 is used for transmitting the data. The transmission takes place as a common transmission, i.e. all generators see the same data. The data are sent in, for example, a data vector (figure 5) comprising generator-specific elements 12. Preferably the generator- specific element begins with the generator identifier 13, subsequent to which there are fields for various signal data, parameters and status data 14 of the switches. Each generator updates the element shown to it.

In the example of figure 4 the generator N+1 , more specifically the network determining element 7 of the generator determines the statuses of the power transmission network 4. The determining is made by measuring, for example, wave impedance from the power transmission network for determining whether the switches are closed or open. The determining process is started in one direction in the network. It is preferable to determine the checking directions and sequence in order to utilize the generator-specific identifiers. In this text the directions are determined either "forward" or "backward". The checking directions can, however, be named as desired. Additionally the checking direction sequence can also be carried out in the preferred sequence: "forward" first or "backward" first.

In the situation of figure 4 the generator N+1 starts determining the statuses of the switches "backwards", whereby the first encountered switch 8 is observed to be closed, i.e. its status value is 1 in this example. The network determining element 7 can from this measurement detect that the generator N belongs to the same area of the power transmission network belonging to the same electric circuit. The determining of status is continued "backwards", until the switch 9, being open, is detected. Such a switch gets a status of 0. An open switch means that the following generator does not belong to the same area of the power transmission network and the checking in that direction can be ended. All switches that have been detected to be closed simultaneously indicate the generators (the generator following the switch) belonging to the same group. This is possible by using consecutive generator-specific identifiers. When one direction has been checked, the opposite direction will be checked, i.e. in the case of figure 4, "forward". It is detected that the first switch 10 to be checked is

open, i.e. it receives a status of zero, and the check in direction "forward" is ended. Switch 11 is thus not checked, as it does not belong to the area of the same power transmission network. With the measured status data of the switches the network determination element can model the area of the power transmission network forming a common electric circuit. The status data of the switches are positioned in the field 14 of the generator-specific element 12 of the data vector reserved for the status data of the switches. See figure 5. The data vector is broadcast via the CAN bus to other generators. All generators can, when necessary, receive the information about the status data checks of the switches made by other generators through the broadcast data vector.

Each generator performs the switch status check and the modelling of the network area and comprises a similar network determination element 7 and independently determines which other generators belong to the same power transmission network.

Thus no central unit is needed. The configuration of the network (changes in the status of the switches) can thus take place simultaneously.

The network determination element can be realized as a software or an electric circuit. The software can be loaded into the memory of the generator and executed in a processor suitable for the purpose. An embodiment for this is an ASIC circuit (Application Specific Integrated Circuit). Subsequent to modelling the part of the network the generators in the same electric circuit can divide the load by using the data about the average load of the network and the current load. Even though the figures do not show the loads, it is obvious that loads can be connected to the electric power transmission network.

Figure 6 shows an example of the method according to the invention for modelling the configuration situation of the electric power transmission network of ships. The method is designed to be carried out in each generator of the electric power transmission network. As was mentioned in the above, in the network each generator

1 can be connected via two connection routes having equipped with switches 2, 3 to other generators, the electric power transmission network being a line or a loop and the generators having consecutive identifiers.

The method comprises the steps of: measuring 62, 64 the state of the said switches on both connection routes until an open switch 63, 66 is detected at the routes, detecting 63 the corresponding generator on the basis of the closed switch and thus modelling 65 the part of the power transmission network comprising the detected generators and the area of the power transmission network belonging to the same electric network via closed switches. In the detection and modelling step the configuration of the network and the consecutive identifiers of the network are used.

The measuring step is preferably arranged to first measure the status of the switches of the first connection route, subsequent to which the status of the switches of the other connection route is measured.

In the example of figure 6 the measuring is started with the first route 61. The status of the first detected switch is measured 62. If the switch is closed 63, the next switch of the first route is measured. Because the switch is closed, the generator corresponding to it is added to the same part of the network as the generator 65 performing the measurement. Thus the modelling of the part of the network progresses at each measurement. When the measurement detects a switch with the status "open", the measurement 66 of the route is stopped and the system check whether the other route has already been measured 67. If both routes have been measured 67, measurement of the second route 68 is started. The measurement of the second route is performed in the same way as that of the first route.

The measurement data of the switches are arranged to be transmitted to a certain point of the data vector, the data vector being arranged to be commonly transmitted to other generators of the power transmission network. The method, like the apparatus, is arranged to repeatedly measure the status data of the switches. As can be seen, the embodiment according to the invention can be carried out by means of a number of solutions. Thus, it will be apparent that the invention is not limited to the examples mentioned in this text. Thus, any inventive embodiment can be carried out within the scope of the invention.