Abstract:
Provided is a reinforced concrete construction method with which it is possible to prevent a temporary assembly waiting time even when work at an erecting site takes time. This reinforced concrete construction method comprises: a temporary assembly step for forming a reinforced concrete unit 2 by temporarily assembling a plurality of stages of horizontal reinforcing bars by means of a temporary assembly jig installed at a temporary assembly site; a temporary placement step for lifting a transfer jig 5 by means of a lifting mechanical device via a lifting jig 3, transferring the reinforced concrete unit 2 from the temporary assembly jig to the transfer jig 5, conveying the transfer jig 5 together with the reinforced concrete unit 2 to a temporary placement site S2 by means of the lifting mechanical device, attaching a temporary placement jig 6 to the transfer jig 5, and temporarily placing the transfer jig 5 together with the reinforced concrete unit 2 via the temporary placement jig 6; and an erecting step for conveying the temporarily-placed transfer jig 5 together with the reinforced concrete unit 2 to an erecting site, and performing a work of erecting the reinforced concrete unit 2.
Inventors:
YAMAMOTO HIDEAKI (JP)
MUNEKIYO MASAYA (JP)
MUNEKIYO MASAYA (JP)
Application Number:
PCT/JP2022/032285
Publication Date:
March 30, 2023
Filing Date:
August 26, 2022
Export Citation:
Assignee:
YAMAMOTO CONSTRUCTION CO LTD (JP)
NOP CARRY CORP (JP)
NOP CARRY CORP (JP)
International Classes:
E04G21/12
Foreign References:
JP2020051234A | 2020-04-02 | |||
JP2002322642A | 2002-11-08 | |||
JP2006125038A | 2006-05-18 | |||
JP2017043952A | 2017-03-02 | |||
JPH03105667U | 1991-11-01 | |||
JP2005248699A | 2005-09-15 | |||
US20200354957A1 | 2020-11-12 | |||
US8381479B1 | 2013-02-26 |
Attorney, Agent or Firm:
FUJIKAWA Tsuneo (JP)
Download PDF: