Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
RESOURCE MANAGEMENT METHOD AND DEVICE IN WIRELESS COMMUNICATION SYSTEM
Document Type and Number:
WIPO Patent Application WO/2022/131804
Kind Code:
A1
Abstract:
A resource management method carried out by an integrated access and backhaul (IAB) node in a communication system, according to one embodiment of the present invention, may comprise the steps of: receiving, from an upper-level node of an IAB node, a first upper layer signaling signal for resource configuration of the IAB node; receiving, from the upper-level node of the IAB node, a second upper layer signaling signal for resource configuration of the IAB node; and, on the basis of the first and second upper layer signaling signals, determining that an IAB-mobile terminal (IAB-MT) and an IAB-distributed unit (IAB-DU) constituting the IAB node carry out communication by being multiplexed by any one scheme among time division, frequency division and spatial division.

Inventors:
NOH HOON DONG (KR)
LEE MOON SIK (KR)
LEE JAE SEUNG (KR)
Application Number:
PCT/KR2021/019131
Publication Date:
June 23, 2022
Filing Date:
December 15, 2021
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
ELECTRONICS & TELECOMMUNICATIONS RES INST (KR)
International Classes:
H04W72/04; H04W84/04; H04W92/20
Other References:
ZTE, SANECHIPS: "Discussion on IAB duplexing enhancements", 3GPP DRAFT; R3-206564, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Online; 20201102 - 20201112, 23 October 2020 (2020-10-23), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051945948
ERICSSON: "Remaining issues on IAB resource configuration and multiplexing", 3GPP DRAFT; R1-1912133, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. Reno, U.S.; 20191118 - 20191122, 8 November 2019 (2019-11-08), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051819966
NOKIA, NOKIA SHANGHAI BELL: "Enhancements for resource multiplexing among IAB backhaul and access links", 3GPP DRAFT; R1-2008863, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. e-Meeting; 20201026 - 20201113, 23 October 2020 (2020-10-23), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051945399
INTEL CORPORATION: "Discussion on IAB Backhaul DL Power Control", 3GPP DRAFT; R1-2005894, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. e-Meeting; 20200817 - 20200828, 8 August 2020 (2020-08-08), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051917796
CEWIT: "Discussions on enhancements to resource multiplexing between child and parent links of an IAB node", 3GPP DRAFT; R1-2006329, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG1, no. e-Meeting; 20200817 - 20200828, 8 August 2020 (2020-08-08), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051917977
Attorney, Agent or Firm:
E-SANG PATENT & TRADEMARK LAW FIRM (KR)
Download PDF: