Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
SYSTEM AND METHOD FOR POSITIONING A DRILLING RIG
Document Type and Number:
WIPO Patent Application WO/2019/098852
Kind Code:
A1
Abstract:
A system (1 ) and a method for positioning a drilling rig (2) arranged to drill in a ground (99) are described, the system (1 ) comprising: - a positioning jig (3) including at least one coupling portion (31 ); - a drilling rig (2) including at least two coupling portions (21 ); - at least two anchoring elements (4, 4A, 4B) including an upper coupling portion (41 ) and a lower coupling portion (42), wherein - the lower coupling portion (42) of the anchoring element (4, 4A, 4B) is arranged to be releasably fixed to the ground (99); and - the upper coupling portion (41 ) of the anchoring element (4, 4A, 4B) is arranged to be connected to the coupling portion of the positioning jig and to the coupling portion of the drilling rig, so that the upper coupling portion of the anchoring element can optionally be connected to the positioning jig or the drilling rig.

Inventors:
FJELDE OLE GUNNAR (NO)
Application Number:
PCT/NO2018/050281
Publication Date:
May 23, 2019
Filing Date:
November 16, 2018
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
COMROD AS (NO)
International Classes:
E21B7/02; E02D13/04; E21B15/00
Domestic Patent References:
WO2009155639A12009-12-30
Foreign References:
US2562276A1951-07-31
US3212589A1965-10-19
KR101205620B12012-11-27
Other References:
See also references of EP 3710664A4
Attorney, Agent or Firm:
HÅMSØ PATENTBYRÅ AS (NO)
Download PDF:
Claims:
C l a i m s

1. A system (1 ) for positioning a drilling rig (2) arranged to drill in a ground (99), the system (1 ) comprising:

- a positioning jig (3) including at least one coupling portion (31 );

- a drilling rig (2) including at least two coupling portions (21 );

c h a r a c t e r i z e d i n that the system further comprises:

- at least two anchoring elements (4, 4A, 4B) including an upper coupling por tion (41 ) and a lower coupling portion (42), wherein

- the lower coupling portion (42) of the anchoring element (4, 4A, 4B) is ar- ranged to be releasably fixed to the ground (99); and

- the upper coupling portion (41 ) of the anchoring element (4, 4A, 4B) is ar ranged to be connected to the coupling portion (31 ) of the positioning jig (3) and to the coupling portion (21 ) of the drilling rig (2), so that the upper coupling por tion (41 ) of the anchoring element (4, 4A, 4B) can optionally be connected to the positioning jig or the drilling rig.

2. The system (1 ) according to claim 1 , wherein the positioning jig (3) includes a centring device.

3. The system (1 ) according to claim 2, wherein the centring device is a rod (33).

4. The system (1 ) according to any one of the preceding claims, wherein the upper coupling portion (41 ) and the lower coupling portion (42) of the anchoring ele ment (4, 4A, 4B) are interconnected via an articulated connection.

5. The system (1 ) according to claim 4, wherein the articulated connection com prises a universal joint (44).

6. The system (1 ) according to any one of the preceding claims, wherein the upper coupling portion (41 ) of the anchoring element (4, 4A, 4B) includes means (43,

46) for a vertical positioning of the corresponding coupling portions (21 , 31 ) be longing to the positioning jig (3) and the drilling rig (2).

7. The system (1 ) according to claim 6, wherein at least one of the anchoring ele ments (4A, 4B) includes a device for infinitely variable height adjustment of the drilling rig.

8. The system (1 ) according to any one of the preceding claims, wherein the an choring element (4, 4A, 4B) and the drilling rig (2) are held together with a ten sioning device (23).

9. A method for positioning a drilling rig (2) arranged to drill in a ground (99), the method comprising the step of:

- indicating a desired centre position (88C) for the drilling rig; the method being c h a r a c t e r i z e d i n that it further comprises the steps of:

- providing a positioning jig (3) and two anchoring elements (4, 4A, 4B);

- connecting the anchoring elements (4, 4A, 4B) to the positioning jig (3); - placing the centre (3C) of the positioning jig (3) in such a way that it corre sponds with the desired centre position (88C) for drilling rig (2);

- fixing the anchoring elements (4, 4A, 4B) to the ground (99);

- removing the positioning jig (3) from the anchoring elements (4, 4A, 4B); and

- connecting the drilling rig (2) to the anchoring elements (4, 4A, 4B).

AMENDED CLAIMS

received by the International Bureau on 13 March 2019 (13.03.2019)

A system (1 ) for positioning a drilling rig (2) arranged to drill in a ground (99), the system (1 ) comprising:

- a positioning jig (3) including at least one coupling portion (31 );

- a drilling rig (2) including at least two coupling portions (21 );

c h a r a c t e r i z e d i n that the system further comprises:

- at least two anchoring elements (4, 4A, 4B) including an upper coupling por tion (41 ) and a lower coupling portion (42), wherein

- the lower coupling portion (42) of the anchoring element (4, 4A, 4B) is ar ranged to be releasably fixed to the ground (99); and

- the upper coupling portion (41 ) of the anchoring element (4, 4A, 4B) is ar ranged to be connected to either the coupling portion (31 ) of the positioning jig (3) or to the coupling portion (21 ) of the drilling rig (2).

The system (1 ) according to claim 1 , wherein the positioning jig (3) includes a centring device.

3. The system (1 ) according to claim 2, wherein the centring device is a rod (33).

4. The system (1 ) according to any one of the preceding claims, wherein the upper coupling portion (41 ) and the lower coupling portion (42) of the anchoring ele ment (4, 4A, 4B) are interconnected via an articulated connection.

The system (1 ) according to claim 4, wherein the articulated connection com prises a universal joint (44).

The system (1 ) according to any one of the preceding claims, wherein the upper coupling portion (41 ) of the anchoring element (4, 4A, 4B) includes means (43, 46) for a vertical positioning of the corresponding coupling portions (21 , 31 ) be longing to the positioning jig (3) and the drilling rig (2).

The system (1 ) according to claim 6, wherein at least one of the anchoring ele ments (4A, 4B) includes a device for infinitely variable height adjustment of the drilling rig.

The system (1 ) according to any one of the preceding claims, wherein the an choring element (4, 4A, 4B) and the drilling rig (2) are held together with a ten sioning device (23).

9. A method for positioning a drilling rig (2) arranged to drill in a ground (99), the method comprising the step of:

- indicating a desired centre position (88C) for the drilling rig; the method being c h a r a c t e r i z e d i n that it further comprises the steps of: - providing a positioning jig (3) and two anchoring elements (4, 4A, 4B);

- connecting the anchoring elements (4, 4A, 4B) to the positioning jig (3);

- placing the centre (3C) of the positioning jig (3) in such a way that it corre sponds with the desired centre position (88C) for drilling rig (2);

- fixing the anchoring elements (4, 4A, 4B) to the ground (99);

- removing the positioning jig (3) from the anchoring elements (4, 4A, 4B); and

- connecting the drilling rig (2) to the anchoring elements (4, 4A, 4B).

Description:
SYSTEM AND METHOD FOR POSITIONING A DRILLING RIG

The invention relates to a system for positioning a drilling rig arranged to form a cut-out in a ground, the system comprising a positioning jig, a drilling rig and an anchoring element. The invention further relates to a method for positioning the drilling rig. Background of the invention

When forming a hole or a slot in a ground, for example in an outlying field or on a moun tain, it is known to use a drilling rig which is attached to a vehicle, for example a lorry, an excavator or a cross-country vehicle, in this connection referred to as a mobile drilling rig. When the drilling rig is being moved to a construction site, the drilling rig is usually ar- ranged in a horizontal position on the vehicle. At the construction site, the vehicle is posi tioned, and the drilling rig is raised to a vertical operative position. Before drilling, the drill ing rig is adjusted in such a way that the centre axis of the drill will have a desired angle to a ground plane, usually perpendicular to the ground. During drilling, the drill must usually be subjected to a vertical force which pushes the drill down into the ground. For a drilling rig attached to a vehicle, the necessary force may be provided by the weight of the drilling rig and vehicle.

Alternatively, a free-standing drilling rig may be used. By a free-standing drilling rig will be understood, here, a drilling rig which can be moved on a small trailer arranged to be pulled by a passenger car or a light cross-country vehicle, for example an AT V. The free- standing drilling rig may also be transported by a helicopter. The free-standing drilling rig is generally positioned manually, maybe by means of a small crane, a pulley lifting tackle or a winch. Because of low weight, the movable drilling rig must quite possibly be an chored to the ground, so that it can subject the drill to the necessary force towards the ground. The anchoring may, for example, be done by extending a chain or a rope from the top of the drilling rig to an anchoring attachment in the ground.

In an initial phase of the drilling, only a portion of the drill is generally in contact with the ground, and the drill may be subjected to great horizontal forces. A good sideways an choring of the drilling rig may thereby be necessary. Transport, positioning and anchoring of a free-standing drilling rig may be demanding, for example in a hilly terrain or on the mountain. When drilling far away from roads, it is com mon to use a helicopter to transport the drilling rig. Prior-art free-standing drilling rigs are usually provided with two or more supporting feet which are anchored to the ground. The supporting feet are preferably anchored to a mountain or a boulder by means of expand ing dowels. Alternatively, the anchoring may comprise a strap, a chain, a turnbuckle or a combination of several elements.

If the rig is to be positioned over an unconsolidated ground, for example bog or moraine, a hole may first be formed, which is filled with concrete, and to which the drilling rig is then anchored. When at least one supporting foot has been anchored to the base, the drilling rig is adjusted in such a way that the centre axis of the drill gets a correct angle to the ground plane, usually perpendicular. Then the other supporting feet may be positioned and secured to the ground. When the drilling rig has been secured sufficiently to the base and correctly positioned, the drilling may start. The transport and positioning of a free-standing drilling rig may take several days. The drilling itself may often be carried out in a substantially shorter time, maybe within an hour by favourable ground conditions. There is a desire within the art to increase the service life of the drilling rig, and a simpler positioning of the drilling rig is considered an effective measure. A higher utilization of the drilling rig is particularly important when the drilling operation includes helicopter transport.

Patent document US2562276A discloses a mobile drilling rig comprising a frame arranged to stand supportingly against a base. A drilling device is arranged to be moved vertically along the frame, the drilling device including a handle arranged to give the drilling device a downward force. Patent document W02009155639A1 discloses a platform arranged to carry a drill for geo logical ground samples. The platform includes a plurality of supporting legs, wherein at least some of the supporting legs can be adjusted in length.

The invention has for its object to remedy or reduce at least one of the drawbacks of the prior art or at least provide a useful alternative to the prior art. The object is achieved through the features that are specified in the description below and in the claims that follow. General description of the invention

The invention is defined by the independent claims. The dependent claims define advan tageous embodiments of the invention.

The invention relates to a system for positioning a drilling rig arranged to drill in a ground, the system comprising:

- a positioning jig including at least one coupling portion;

- a drilling rig including at least two coupling portions;

- at least two anchoring elements including an upper coupling portion and a lower coupling portion, wherein

- the lower coupling portion of the anchoring element is arranged to be releasably fixed to the ground; and

- the upper coupling portion of the anchoring element is arranged to be connected to the coupling portion of the positioning jig and to the coupling portion of the drilling rig, so that the upper coupling portion of the anchoring element can optionally be connected to the positioning jig or the drilling rig.

By providing a system according to the invention, it is possible to achieve a simpler posi tioning of a drilling rig, compared with the prior art. A prior-art drilling rig is typically an chored to the ground via one or more anchoring elements attached to the drilling rig. This requires the entire drilling rig to be positioned in the correct position before it may be se- cured. This is often a heavy and demanding operation, especially in hilly terrain.

The invention involves releasing the anchoring elements from the drilling rig and pre positioning and fixing them to the ground by means of a positioning jig. Then the drilling rig is connected to the anchoring elements.

The coupling portion of the positioning jig and the coupling portion of the drilling rig are identical and correspond with an upper coupling portion belonging to the anchoring ele ment. The coupling portions of the positioning jig and the drilling rig may be sleeves sur rounding a portion of the upper coupling portion of the anchoring element. Alternatively, the coupling portion may include a profile, for example a U-profile.

The anchoring elements and the positioning jig may be of limited sizes and weights, mak ing it possible for a person to carry them if necessary. The positioning jig is arranged to position the anchoring elements and not to absorb a load or a force. Thereby the position ing jig may be formed from a light material, for example aluminium. When drilling is to take place, the anchoring elements and the positioning jig are trans ported to the construction site. The upper coupling portions of the anchoring elements are connected to the coupling portions of the positioning jig. The positioning jig is placed in a correct position and the lower coupling portions of the anchoring elements are fixed to the ground, for example by the use of a prior-art bolt connection. After the anchoring elements have been secured to the ground, the positioning jig is removed, and the anchoring ele ments are ready to receive and be attached to the drilling rig.

When the drilling rig arrives at the construction site, the drilling rig may immediately be connected to the secured anchoring elements and arranged in an approximately correct position. By the use of a helicopter, the drilling rig, for example, may be lowered directly onto the anchoring elements. Thereby, in a vulnerable terrain, the drilling rig may be posi tioned without temporary storage in the terrain. If the drilling rig is transported on the ground, it may be connected to the anchoring elements in a slanted or lying position.

The drilling rig must be positioned in two planes, a first sideways plane and a second Ion- gitudinal plane. The drilling rig described herein may be connected to two or more anchor ing elements. If the drilling rig is arranged to be connected to two anchoring elements, the two anchoring elements may be arranged to position the drilling rig in the first plane. In the second plane, the drilling rig may be positioned with straps or brace rods. If the drilling rig is arranged to be connected to three anchoring elements, the three anchoring elements may be used to position the drilling rig in both the first and the second plane.

When the drilling has been carried out, the drilling rig may be disconnected from the an choring elements and transported to the next site. When establishing a pylon line compris ing a plurality of pylons, anchoring elements may advantageously be pre-positioned at several construction sites, so that the drilling rig may be transported directly to and from the construction sites. Thereby the drilling rig may be utilized more efficiently, and money connected to transporting the drilling rig may be saved.

The positioning jig may include a centring device. The centring device may be a rod.

When establishing a high-voltage line, for example, there are great demands for exact positioning of the pylons, in both the horizontal plane and the vertical plane. The position in the horizontal plane is normally found with a GPS, and the centre for the pylon and the cut-out for the pylon are typically indicated with a centre mark in or on the ground.

For correct positioning of the anchoring element, the centre of the positioning jig must correspond with the centre of the cut-out. The centring device may include an eyehole on the positioning jig, and/or a rod and/or a bubble level. The rod may be arranged to be moved vertically in the positioning jig and may include a device for carrying the positioning jig, for example a lockable sleeve. In a lower end portion, the rod may be provided with a point. When the positioning jig is being positioned, the point of the rod is placed on the centre mark. When the rod is vertical, the anchoring elements are in the correct positions for fixing to the ground. When the anchoring elements have been fixed to the ground, the positioning jig may be removed and moved to the next construction site.

The upper coupling portion and the lower coupling portion of the anchoring element may be interconnected by an articulated connection. The articulated connection may comprise a universal joint. The articulated connection makes it possible to secure the lower coupling portion to the ground in a plane that is different from the horizontal plane of the positioning jig and the drilling rig. An articulated connection is particularly advantageous on an une ven base, for example a vertical portion of a mountain or a stone, and may enable vertical fixing of the lower coupling portion. The articulated connection may be lockable so that the upper coupling portion of the an choring element may keep a vertical position after the positioning jig has been removed.

By locking the upper coupling portion of the anchoring element in a vertical position, the connection of the drilling rig to the anchoring elements may be simplified if the connection is done vertically by the use of a crane or a helicopter. The upper coupling portion of the anchoring element may include means for a vertical positioning of the corresponding coupling portions belonging to the positioning jig and the drilling rig. When the anchoring elements are fixed to the ground, they will most likely have different heights. To place the drilling rig at a correct angle to the ground, at least one of the anchoring elements may include means that make it possible to adjust the vertical position of at least one of the coupling portions of the positioning jig and the drilling rig. In practice, the demands for accuracy will be greater for the drilling rig than for the position ing jig. The height adjustment may be stepped and, for example, comprise a plurality of holes arranged to receive a bolt. The coupling portion of the drilling rig may include an end face arranged to rest on the bolt, and the end portion of the drilling rig may include one or more corresponding bolt holes.

At least one of the anchoring elements may comprise a device for infinitely variable height adjustment of the drilling rig. An infinitely variable height adjustment can give a more pre cise height adjustment than a stepped height adjustment. An infinitely variable height ad- justment may comprise a clamp, a screw connection or a hydraulic cylinder. The clamp may be secured to the anchoring elements when the drilling rig is placed in a desired posi tion. Alternatively, a portion of the coupling portion of the anchoring element may be pro vided with an external threaded portion arranged to receive a nut, wherein the nut may be used for both raising, lowering and holding the coupling portion of the drilling rig in the desired position. The anchoring element may include several nuts and a nut may be a counternut. In a further embodiment, the infinitely variable adjustment may comprise a hydraulic cylinder.

The anchoring element and the drilling rig may be held together with a tensioning device. The tensioning device is arranged to hold the drilling rig in a locked vertical position when the drill is being pushed into the ground, thereby subjecting the drill to a necessary force towards the ground when drilling.

The tensioning device may, for example, be a tension rod, a chain, a turnbuckle, a ten sioning strap or a rope. The tensioning device may be a combination of said devices. The tensioning device may be secured to the anchoring element, to the ground or to a portion of a tree.

The invention also relates to a method for positioning a drilling rig arranged to drill in a ground, the method comprising the steps:

- indicating a desired centre position for the drilling rig;

- providing a positioning jig and two anchoring elements;

- connecting the anchoring elements to the positioning jig;

- placing the centre of the positioning jig in such a way that it corresponds with the desired centre position for the drilling rig;

- fixing the anchoring elements to the ground;

- removing the positioning jig from the anchoring elements; and

- connecting the drilling rig to the anchoring elements.

In what follows, examples of preferred embodiments are described, which are illustrated in the accompanying drawings, in which:

Figure 1 shows a general view of elements for a system according to the invention, comprising a positioning jig, a drilling rig with a drill, and first, second and third anchoring elements; Figure 2 shows the positioning jig viewed from the front, the positioning jig being con nected to the second and the third anchoring element, and the ground being even;

Figure 3 shows the positioning jig connected to the first and the second anchoring element and a positioning rod, and the ground being uneven and comprising a concrete foundation;

Figure 4 shows the positioning jig connected to two second anchoring elements, and the ground being uneven;

Figure 5 shows two anchoring elements fixed to the ground and released from the positioning jig;

Figure 6 shows the drilling rig connected to two anchoring elements;

Figure 7 shows figure 6 viewed from the side;

Figure 8 shows the same as figure 6, but the drill is in a drilling position in the ground;

and Figure 9 shows a slot-shaped cut-out after drilling and after the system has been re moved.

The figures are shown in a simplified and schematic manner, and details that are not im portant to elucidate what is new in the invention may have been left out in the figures. The various elements in the figures are not necessarily shown to scale. Like and correspond- ing elements will be indicated by the same reference numbers in the figures. Any posi tional indications (such as "over", "under", "between") refer to positions shown in the fig ures.

Figure 1 shows a general view of elements for a system 1 for positioning a drilling rig 2 according to the invention. The system comprises:

- a positioning jig 3 including two coupling portions 31 ;

- a drilling rig 2 including two coupling portions 21 , and a drill 22; and

- two anchoring elements 4.

The anchoring element 4 comprises an upper coupling portion 41 and a lower coupling portion 42, the two coupling portions 41 and 42 being interconnected via a universal joint 44. The upper coupling portion 41 is arranged to be connected to the coupling portion 31 of the positioning jig 3 and the coupling portion 21 of the drilling rig 2 by the coupling por tions 31 and 21 surrounding the coupling portion 41 of the anchoring element 4. The lower coupling portion 42 of the anchoring element 4 is arranged to be releasably fixed to a ground 99 (see figures 2-8). The upper coupling portion of the anchoring element 4 comprises a stepped height ad justment, shown in the form of a plurality of holes 46 arranged to receive a bolt (not shown). In use, the end faces 32 belonging to the drilling rig 2 and the positioning jig 3 rest supportingly against the bolt. By positioning the bolt in different holes 46, the height of the drilling rig 2 and the positioning jig 3 can be adjusted. The anchoring element 4 is pro- vided with a stepped height adjustment as described.

In an alternative embodiment 4A, the anchoring element 4 may include a mechanical infi nitely variable height adjustment, shown in the form of an external threaded portion 47 with a corresponding nut 43. The end faces 32 belonging to the drilling rig 2 and the posi tioning jig 3 rest supportingly against the nut 43. By moving the nut axially along the threaded portion 47, the height of the drilling rig 2 and the positioning jig 3 can be adjust ed.

In a further alternative embodiment 4B, the anchoring element 4 may include a hydraulic infinitely variable height adjustment, shown in the form of a hydraulic cylinder 48. The end faces 32 rest supportingly against a flange 49 attached to the cylinder 48. The lower cou- pling portion 42 is attached to a piston rod 48b. By hydraulically adjusting the length of stroke of the piston rod 48b, the height of the drilling rig 2 and the positioning jig 3 can be adjusted.

The centre spacings CC1 between the two coupling portions 31 of the positioning jig 3 and the two coupling portions 21 of the drilling rig 2 are equal. Figures 2-4 show the positioning jig 3 viewed from the front, including two anchoring ele ments 4, 4A, 4B fixed to a flat ground 99 (figure 2) or uneven ground (figures 3-8). The positioning jig 3 and the drilling rig 2 may be connected to identical or different anchoring elements 4, 4A, 4B.

Two anchoring elements 4, 4B, 4C are attached to the positioning jig, and the positioning jig 3 is centred over an indicated centre 88C for the drilling rig. In figures 3 and 4 the posi tioning jig 3 also includes a centre rod 33. The point 33 of the centre rod is positioned in the centre 88C. When the positioning jig 3 is centred and the centre rod 33 and the an- choring elements 4, 4B, 4C are vertical, the lower coupling portions 42 of the anchoring elements 4, 4B, 4C are fixed to the ground, for example with bolts, as shown in figures 2- 8.

Figure 3 shows the anchoring element 4 fixed to the ground 99 via a concrete foundation 98. The anchoring elements 4A, 4B are fixed directly to the ground 99. The universal joint

44 makes it possible to adjust the lower coupling portions 42 in several planes so that maximum contact is achieved between the lower coupling portion 42 and the ground 99.

Figure 5 shows two mechanically adjustable anchoring elements 4A fixed to the ground 99 after the positioning jig 3 has been removed. The centre spacing CC1 is the same as for the drilling rig 2 (figure 1 ).

Figures 6 and 7 show the drilling rig 2 positioned for drilling. Figure 6 shows the drilling rig 2 from the front. Figure 7 shows the drilling rig 2 from the side. The two end faces 32 of the drilling rig are resting against the nuts 43. The nuts 43 are so adjusted that the drilling rig 2 is perpendicular. Two tension rods 23 connect the drilling rig 2 to the anchoring ele- ments 42, so that the drilling ring 2 does not lift from the ground 99 when the drill 22 is being pushed into the round 99 during drilling. In an alternative embodiment, the tension rod 23 may be a chain, a tensioning strap, a turnbuckle or a combination of several ele ments.

In the longitudinal direction (figure 7), the drilling rig 2 is positioned with adjustable straps 24 anchored to the ground 99. In an alternative embodiment (not shown), the straps 24 may be anchored to a portion of a tree (not shown).

Figure 8 shows the same as figure 6, but the drill 22 is in a drilling position for forming a slot 89 in the ground 99.

Figure 9 shows the ground 99 after the slot 89 has been formed and the system 1 has been removed. After the system 1 has been removed, the only visible mark on the ground 99, apart from the slot 89, will, in the main, be the bolt holes 51.

It should be noted that all the above-mentioned embodiments illustrate the invention, but do not limit it, and persons skilled in the art may construct many alternative embodiments without departing from the scope of the attached claims. In the claims, reference numbers in brackets are not to be regarded as restrictive.

The use of the verb "to comprise" and its different forms does not exclude the presence of elements or steps that are not mentioned in the claims. The indefinite article "a" or "an" before an element does not exclude the presence of several such elements.

The fact that some features are indicated in mutually different dependent claims does not indicate that a combination of these features cannot be used with advantage.