JP2024030435A
An object of the present invention is to provide a resin spacer that can be cut by a shielding machine and improves the accuracy of inserting the core material, and a method for maintaining the distance between the resin core materials u...  
JP2024029992A
[Problem] It can exhibit much stronger tensile strength and pullout strength than conventional ones, does not cause misalignment when installed vertically, horizontally, or diagonally, does not require the anchor installation hole to be ...  
JP3245951U
An object of the present invention is to provide a turbulent flow concrete removal device for underground continuous walls that can improve removal efficiency and ensure joint brushing work of underground continuous walls. The present in...  
JP2024030885A
An object of the present invention is to provide a steel pipe pile that is particularly inexpensive in processing cost and can exhibit high bending strength despite being thin, and a hybrid pile that has strong integrity as a composite s...  
JP2024027275A
An object of the present invention is to provide a steel pipe connecting device that allows easy connecting work and high work efficiency. [Solution] A box joint 1 and a pin joint 2 provided at mutually opposing ends of a steel pipe, and...  
JP7441700B2
To make it easy to fit a horizontal member to a steel sheet pile wall that is built using stainless steel sheet piles and prevent corrosion due to contact of a dissimilar metal.A steel sheet pile wall is formed by connecting stainless st...  
JP7441703B2
To prevent a component from being damaged even if a connecting pin tilts in a steel pipe mechanical joint structure to fit and pin an inner joint pipe and an outer joint pipe with each other.A steel pipe mechanical joint structure compri...  
JP7441193B2
To provide a pipe unit applied for constructing a cleaning pile constructible with a small-sized heavy machine, with favorable workability and excellent in cleaning performance, and a construction method for the cleaning pile using the p...  
JP7438634B2
To provide a load-bearing body for a removal anchor, a method of using the removal anchor, and a method of manufacturing the load-bearing body, which can reliably support the necessary tension during the service period after being erecte...  
JP2024025089A
[Problem] To provide an earth retaining structure that can easily reinforce the ground on one side. [Solution] A first earth retaining wall 2 provided on the ground on one side, a second earth retaining wall 3 provided on the ground on t...  
JP2024025087A
[Problem] To realize easy construction of an earth retaining wall. [Solution] A design method for an earth retaining wall 1 in which a predetermined horizontal direction is a longitudinal direction D1 in a horizontal cross section, and t...  
JP2024025086A
An object of the present invention is to provide a design method for an earth retaining wall that makes it easy to accurately confirm the feasibility of a structure. [Solution] A design method for an earth retaining wall 1 in which a pre...  
JP7438033B2
To provide technology allowing a cut-off measure for a soil retaining wall on a reached side to be carried out in minimum hours and with manpower.A cut-off device 10 installed on a soil retaining wall composed of sheet piles having irreg...  
JP7438166B2
To provide a reinforcement method which can obtain sufficient reinforcement effect and in which there is no need to drill an excavation hole that reaches a ground or a natural ground.A reinforcement method of a concrete structure (10: fo...  
JP7437237B2
To provide a pile press-in method which removes soil effectively from joints of existing piles and which has reduced resistance between joints, to provide a joint part soil removal scraper, and to provide a press-in pile.A pile press-in ...  
JP7435970B2
To provide a countermeasure method for soil defects such as insufficient laps that occur in the laps (overlapping) between elements when constructing soil cement colonnade walls.An injection pipe 1 for soil cement columnar improvement is...  
JP7435060B2
To provide the construction method of an underground structure allowing construction of the underground structure effectively using a soil cement-made ground improvement body.The construction method of an underground structure comprises ...  
JP7436182B2
To provide an underground structure having an earth retaining member, and reduced in cost and a construction period required for a bar arrangement step by omitting the bar arrangement amount or omitting bars.In a design method of an unde...  
JP2024023122A
[Problems] A pile cap reinforcement method that can form a tapered shape on the pile head of a cylindrical steel pipe pile on site without sinking of the steel pipe pile, a steel pipe pile for reinforcing the pile cap used in the method,...  
JP7433073B2
To maintain a usual diameter, to bear an applied tensile force, and to prevent buckling of a steel pipe by an applied compressive force, too, for a concrete pile coated with steel pipes.A concrete pile body 1 is coated with an upper stee...  
JP2024021824A
[Problem] It is possible to reliably collect unconsolidated samples with simple operations during normal construction work. [Solution] The collection tool 1 is constructed by inserting an inner cylinder 10 with a collection opening 16 in...  
JP2024020928A
[Problem] Removal of deposits on the core material of a continuous wall that is easy to install and does not require special construction equipment by removing deposits attached to the male joint and preventing foreign matter from enteri...  
JP7430842B1
[Problem] To provide an artificial ground structure that secures the necessary strength of concrete and suppresses the influence of a curing sheet on the concrete surface. [Solution] An artificial ground structure includes a support pile...  
JP7429382B2
To properly expand and surely fix an expansion member to a concrete skeleton even if a locking nut is applied, and to perform nut locking.The present invention relates to a fastening anchor 1 in which an expansion member 3 in which an ex...  
JP2024017251A
An object of the present invention is to provide a method for erecting a reinforcing bar cage that can be suitably applied even if there are restrictions such as empty heads. The reinforcing bar cages 1a and 1b are telescopic ones having...  
JP2024017637A
An object of the present invention is to provide a corrosion-proof structure that can highly protect the surface of a wall in which adjacent steel pipe bodies are connected via a joint. A corrosion-resistant structure including at least ...  
JP2024018308A
An object of the present invention is to provide an earth retaining wall in which a parent pile, an auxiliary pile, and a connecting member are not exposed. [Solution] A plurality of main piles 2 inserted into the earth retaining wall co...  
JP2024018706A
The present invention provides a pile response characteristic analysis method and a pile response characteristic analysis program that can accurately calculate the pile response characteristics. [Solution] A pile response characteristic ...  
JP7428396B2
To provide a casing for ground reinforcement, which enables drilling to a desired depth while ensuring workability and safety by realizing light weight on the basis of an idea of forming a pile head through sweeping of a projection part ...  
JP7427945B2
To provide a method of constructing a building with a basement floor capable of increasing bending rigidity with an economical and rational structure by using a wall-like structure installed in the ground.A construction method of a build...  
JP7427197B2
To simplify construction and ensure sufficient tensile strength while minimizing machining of a pipe or a member to be united.A pipe coupling structure is provided with an outer peripheral groove 21 extending over a total circumference o...  
JP7427220B2
To allow for detecting a load acting on an anchor bolt of a metal anchor fixed to a concrete skeleton and notifying an administrator of information based on a detection result.A load detection device 16 provided on a metal anchor 10 fixe...  
JP2024505110A
[Problem] To provide an anchor cable for grouting, that is, an NPR anchor cable for grouting, which has large deformation, constant resistance, and support function. [Solution] Anchor cable for grouting with large deformation, constant r...  
JP7426673B2
To provide an anchor load cell capable of inexpensively replacing a strain gauge while maintaining a tensile force acting on a tensile member.A load cell is approximately cylindrical, has an anchor nut joint having a circular shape in a ...  
JP7426351B2
To provide a main bar movement preventive tool, and a reinforcing-bar cage provided with the main bar movement preventive tool preventing a main member of the reinforcing-bar cage from moving (shifting) downward relative to a reinforced ...  
JP2024014721A
An object of the present invention is to provide a measurement system that can not only measure the height of the top of concrete, but also easily measure the position of the bottom end of a tremie tube. [Solution] This is a measurement ...  
JP7425301B2
To provide a vertical joint structure of steel sheet piles reducing a time required for a construction at a construction site.A vertical joint structure 1 of steel sheet piles comprises: a first steel sheet pile 10A; a second steel sheet...  
JP7425441B2
To provide a construction method of an impervious wall excellent in water permeability coefficient and adsorptivity.A construction method of an impervious wall comprises the steps of: supplying slurry of clay minerals in the ground and p...  
JP2024013039A
An object of the present invention is to provide an underground structure, a method for constructing the underground structure, and a jig for constructing the underground structure, which can further improve pull-out resistance and sedim...  
JP7423336B2
To provide a multiple thread screw joint capable of eliminating fitting mistakes, and a steel pipe with a joint, a structure, a construction method of the structure, and a design method and a manufacturing method of the multiple thread s...  
JP7423192B2
To provide an underground continuous wall and a construction method for underground continuous walls that can easily be constructed, and that can efficiently transmit in-plane shear forces between a first element (preceding element) and ...  
JP2024011324A
An object of the present invention is to provide a load cell in which an anchor head does not shift. [Solution] It consists of a substantially cylindrical pressure receiving body and a substantially cylindrical anchor head guide provided...  
JP2024011624A
[Problem] A structure for a mountain retaining wall that is used as a permanent structure, and that allows construction of a mountain retaining wall with a design that is separate and independent from the concrete underground structure t...  
JP7422053B2
To provide a construction method of a concrete structure, etc. that enable a bottom end portion of a reinforcement cage to be installed securely at a bottom section of the concrete structure and the bottom end portion of the reinforcemen...  
JP7422055B2
To provide a reinforcement cage capable of extending/contracting vertically and changing a diameter thereof.A reinforcement cage 1 has a plurality of flexible spiral strands 11a, 11b arranged in a circumferential direction of the reinfor...  
JP7421100B2
To provide an in-steel pipe bottom lid structure which has a simple structure and which can easily position a lid member to a predetermined position in a pipe, and to provide a construction method of a tubular structure.An in-steel botto...  
JP2024009434A
An object of the present invention is to provide an earthquake-resistant design system for a composite soil pile foundation that can reduce the period required for designing piles and soil improvement bodies when the soil improvement bod...  
JP7420123B2
To provide a screw joint which can sufficiently utilize a total plastic load of a joint steel material without coming off a screw part on a compression side in an incomplete joint state where a shoulder part is not touched, and to provid...  
JP7418638B2
To provide a solidified pile forming method that performs prejetting which uses a novel excavation fluid that is a compound of a relatively small amount of active ingredients and effectively excavates hard clay layers, and that improves ...  
JP7418003B2
To provide a core material for a soil cement pile which has a sufficient vertical bearing capacity and reduces variation in a coupling force between a steel pipe, a core material composed a cylinder metal fitting and a cement pile body e...  