Document |
Document Title |
JP6562544B2 |
|
JP6560773B1 |
To provide a scaffolding construction method for constructing a work scaffolding around a pier of a bridge erected on a water area without using a pontoon. In a scaffolding construction method for constructing a work scaffold 4 using a s...
|
JP6560774B1 |
To provide a scaffolding construction method for constructing a work scaffolding around a pier of a bridge erected on a water area without using a pontoon. A carry-in path 8 from a land on one side of a bridge to a target bridge pier 1 i...
|
JP6558069B2 |
|
JP2019129936A |
To provide a lifting tool for a work on a tree capable of lifting, while changing two steps, and dispensing with removing a rope for a safety belt on the tree, when performing a work on the tree such as standing tree pruning.Two steps 1,...
|
JP6549286B1 |
To safely and efficiently construct a basic skeleton. The scaffolding device has a horizontal support rod 21 attached above the skeleton reinforcing bar 13, and the horizontal support rod 21 is provided with an outer strut receiving memb...
|
JP2019099992A |
To provide a fixing device of a lifting tool allowing installation of the lifting tool such as a step ladder on a floor at an optional distance from a rising part of a handrail or the like, and allowing free setting of the lifting tool o...
|
JP6532997B1 |
To provide a method for safely installing a suspended scaffold for repairing a viaduct beam constructed on an in-service railway or a road without restricting traffic on the railway or the road. It is a method of installing a moving scaf...
|
JP2019085695A |
To provide a working gondola allowing easy setting of a fall prevention flap at a fall prevention position and excellent in operability.A working gondola 1 comprises: a gondola body 2 formed into a rectangular parallelepiped box shape; a...
|
JP2019075028A |
To output integrated quantities and each data of a drawing substantially at the same time by creating the drawing of a temporary scaffold and integrating the quantities of scaffold constituting members.A design/integration supporting sys...
|
JP6514272B2 |
|
JP6514677B2 |
|
JP6511270B2 |
|
JP3221055U |
To provide a concentrating station building where the MRF of a telephone line, which is called a concentrating station building of a telephone company, can be inspected and installed / removed. Provide a work floor to use. A movable floo...
|
JP2019065573A |
To provide a work gondola suitably used in a narrow space.This work gondola is provided with: a floor 3 that constitutes a floor surface 3a; supports 4 that are erected on both sides of the floor 3 in a width direction; a handrail 5 that...
|
JP2019060187A |
To improve safety by preventing a horizontal member for supporting a scaffold plate from being downwardly inclined toward a tip end, when not a square steel pipe with a specified size, but a round steel pipe with a small diameter is used...
|
JP6499569B2 |
|
JP6491449B2 |
|
JP2019035251A |
To provide a multipurpose bracket for a plate wall using a molded member in which a wall skelton and a temporary scaffold can be operated in parallel.A wall skelton A of a structure is formed by laying and assembling, using splines 6 and...
|
JP6475019B2 |
|
JP6474151B2 |
|
JP2019027145A |
To provide an installation method for a falling object protective device capable of reducing the risks of dropped tool accidents and falling worker accidents.An installation method for a falling object protective device is used for a han...
|
JP6470556B2 |
|
JP6464535B2 |
|
JP6467097B1 |
To safely and quickly perform installation work of a rail or the like in a building without leaning out from the parapet, and to easily apply it to a building having a different width of the parapet with respect to an outer wall. Provide...
|
JP6460682B2 |
|
JP6449423B1 |
To realize efficient installation work of an elevator device at low cost. A work gondola according to the present embodiment is a work gondola used for installing an elevator device, and is provided on a base arranged between a pair of g...
|
JP2018204334A |
To provide a suspension scaffold panel which can construct a temporary scaffold for performing repair and maintenance work over the whole periphery and the whole face of a cylindrical building, and its construction method.In rectangular ...
|
JP2018204333A |
To provide a suspension scaffold panel which can be safely and easily connected and removed.In rectangular suspension scaffold panels which are connected to a horizontal direction, rod-shaped or tubular hanging metal fittings are arrange...
|
JP2018537603A |
A cargo transportation platform used for construction work, which consists of a support structure that can be fixed to a building and extends outward from the building, and a deck that can be mounted on the support structure so as to ext...
|
JP6441285B2 |
|
JP2018193731A |
To provide a simple type scaffold for a steel tower which can be detachably attached to the outside of a main pillar of a steel tower formed of angle steel and further can be attached and detached easily by carrying it to the top of the ...
|
JP6432854B1 |
To provide a work scaffold in a boiler, an exchange device for the water wall of the boiler, and a method for exchanging the work scaffold in the boiler, which can easily exchange the work scaffold for inspection even after the work scaf...
|
JP3219090U |
To provide a steady rest guide device for an elevating body, which can suppress contact resistance between a guide wire and a guide member as much as possible to prevent early deterioration, and can quickly and smoothly elevate and eleva...
|
JP2018188904A |
To provide an insert holding structure for scaffold construction which can be attached to a component panel by an easy operation, and can effectively use a material by repeatedly using the component panel.An insert holding structure inst...
|
JP6426917B2 |
|
JP2018168575A |
To provide a movable work floor apparatus which does not incline securely the work floor installed inside the cylindrical structure and does not obstruct work.The movable work floor apparatus 20 having a work floor freely movable up and ...
|
JP6409353B2 |
|
JP6407062B2 |
|
JP6401937B2 |
|
JP2018529037A |
According to at least one aspect of the present disclosure, the concrete formwork is a cast wall portion having a concrete contact surface and a reinforcing surface, and a plurality of braces movably connected to the reinforcing surface ...
|
JP2018155061A |
To provide a mobile scaffold device with simple constitution and high work efficiency, and applicable to a bridge which is difficult for an automobile to cross.The mobile scaffold device is configured to move a scaffold below a bridge gi...
|
JP2018155060A |
To provide a mobile scaffold device with simple constitution and high work efficiency, and applicable to a bridge which is difficult for an automobile to cross.The mobile scaffold device is configured to move a scaffold below a bridge gi...
|
JP6400657B2 |
|
JP6396543B1 |
To provide a scaffolding fixture which can shorten the scaffolding installation work time and does not damage a structure or the like to be repaired. A scaffolding fixture X to be fixed to a support pile 100 of a structure is provided wi...
|
JP6388834B2 |
|
JP6386204B1 |
To provide a scaffolding unit capable of improving work efficiency by making it possible to easily and easily perform a work of fastening to a support column. A scaffolding unit 1 which is surrounded and fixed to a circular support S fro...
|
JP6375141B2 |
|
JP6368209B2 |
|
JP6366472B2 |
|