To dispense with the resetting work of a processing request transmission condition and the load measuring work of a test object device after reset.
The load control device 100 comprises a load information acquisition part 103 for acquiring load information showing the load generated in a server 300 of the test object from a test object server 300; a load control part 101 for determining the deviation between a load set value and a load value corresponding to the load information and calculating a transmission set value by use of the determined deviation; and a transmitting control part 102 for transmitting, based on the calculated transmission set value, a processing request quantity necessary for generating the load corresponding to the transmission set value in the server 300 of the test object and processing contents as a transmission request to a load generation device 200.
MURAYAMA TAKAHIKO
HANAKI SABURO