Title:
METHOD AND APPARATUS FOR HOP-BY-HOP FLOW CONTROL
Document Type and Number:
WIPO Patent Application WO/2021/068158
Kind Code:
A1
Abstract:
The present disclosure relates to methods and apparatuses. According to some embodiments of the disclosure, a method performed by a communication device, includes: receiving, from a base station, a first configuration information indicating a threshold to configure the communication device, wherein the threshold is associated with data volume; determining whether congestion happens at the communication device based on the threshold; and transmitting a congestion indication to a first parent node via a Backhaul Adaptation Protocol (BAP) signaling message when it is determined that the congestion happens at the communication device.
Inventors:
WU LIANHAI (CN)
LÖHR JOACHIM (DE)
BASU MALLICK PRATEEK (DE)
SHI JIE (CN)
WANG HAIMING (CN)
HAN JING (CN)
LÖHR JOACHIM (DE)
BASU MALLICK PRATEEK (DE)
SHI JIE (CN)
WANG HAIMING (CN)
HAN JING (CN)
Application Number:
PCT/CN2019/110340
Publication Date:
April 15, 2021
Filing Date:
October 10, 2019
Export Citation:
Assignee:
LENOVO BEIJING LTD (CN)
International Classes:
H04W28/10
Domestic Patent References:
WO2019190650A1 | 2019-10-03 |
Foreign References:
CN110248376A | 2019-09-17 | |||
CN107736004A | 2018-02-23 |
Other References:
HUAWEI, HISILICON: "Flow control for IAB networks", 3GPP DRAFT; R2-1912367 FLOW CONTROL FOR IAB NETWORKS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Chongqing, China; 20191014 - 20191018, 4 October 2019 (2019-10-04), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051790412
SAMSUNG: "DL End-to-end flow control in IAB network", 3GPP DRAFT; R3-194996_WASR3-193981_FLOWCONTROL_V0.1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Chongqing, China; 20191014 - 20191018, 4 October 2019 (2019-10-04), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051792046
LG ELECTRONICS INC., LG UPLUS: "Further details for DL flow control", 3GPP DRAFT; R2-1913819 FURTHER DETAILS FOR DL FLOW CONTROL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Chongqing, China; 20191014 - 20191018, 4 October 2019 (2019-10-04), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051791810
HUAWEI & HISILICON: "Remaining issues on flow control", TSG-RAN WG2 MEETING, 26 August 2019 (2019-08-26)
See also references of EP 4042742A4
SAMSUNG: "DL End-to-end flow control in IAB network", 3GPP DRAFT; R3-194996_WASR3-193981_FLOWCONTROL_V0.1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Chongqing, China; 20191014 - 20191018, 4 October 2019 (2019-10-04), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051792046
LG ELECTRONICS INC., LG UPLUS: "Further details for DL flow control", 3GPP DRAFT; R2-1913819 FURTHER DETAILS FOR DL FLOW CONTROL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG2, no. Chongqing, China; 20191014 - 20191018, 4 October 2019 (2019-10-04), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France, XP051791810
HUAWEI & HISILICON: "Remaining issues on flow control", TSG-RAN WG2 MEETING, 26 August 2019 (2019-08-26)
See also references of EP 4042742A4
Attorney, Agent or Firm:
LEE AND LI - LEAVEN IPR AGENCY LTD. (CN)
Download PDF: