Document Document Title
JPH11193773A
To enable efficient conversion of strong winds generated around the buildings to electric energy and improve power generation efficiency by controlling the wind flow around the buildings, generating a strong wind region around the buildi...  
JP2920865B2  
JPH11166323A
To attain the remarkable shortening of the whole term of works including a building by contriving the construction of a large-sized frame so as to be advanced in parallel to the construction of the building when the large- sized frame is...  
JPH11166311A
To easily lay a track on which a carriage with track travels on a floor. In gratings 1 constituting the floor of a clean room, a guide groove 1c and two mounting grooves 1d are formed. By joining the gratings 1 together, a guide rail 17 ...  
JPH11159007A
To provide a module column base structure, which is suitable for reduction in constructing duration and for improvement in construction safety, and an installing method thereof by improving executability and execution precision in instal...  
JPH11159177A
To considerably reduce the installation time period on the job site by functionally dividing a plant into modules and prefabricating and testing the equipment, plumbing and electric wiring modules in a factory for each module. A module 1...  
JPH11152849A
To reduce material cost and assembling manhour at site and prevent water from leaking outward at sticking adjacent outer facing panels together by forming the one end part of an outer facing panel into a projection streak, and the other ...  
JPH11153335A
To shorten the assembling time of a filter supporting frame for clean room by connecting frames to each other with a simple structure by making the pitch between the frames changeable without performing size measurement and working. A fi...  
JP2901462B2
PURPOSE:To shorten the work schedule while enhancing the work efficiency in the installation of steel structure of lower dry well Within a reactor container. CONSTITUTION:A main beam 2 for upper floor, a main beam 3 for lower floor havin...  
JP2900984B2  
JP2900024B2  
JPH11131592A
To dispense with removal of existing gable walls and secure the original aseismetic strength, by arranging a large-sized rigid frame of a reinforced concrete structure with buit-in steel frames having large openings at both gable faces o...  
JPH11101016A
To extend a production area while harmonizing production scale with air-conditioning scale. In the initial production stage, an initial production area 4 and an initial non-production area 5, including an underfloor and a ceiling plenum,...  
JPH11101017A
To enable inexpensive constitution of a temporary partition for partitioning a production area from a non-production area in the airtight manner and to realize removal with a simple work. In this clean room plant, an initial production a...  
JP2881294B2  
JPH1193441A
To provide high airtightness and easily control of the environment of an inner space although the installation and the withdrawal are easy by providing an opening part upward opening, and closing a gap between side walls forming the inne...  
JPH1183104A
To provide a low-temperature clean booth which can put only the required region at low temperature at low cost and simply, secure cleanness, and cope with the change of the production line simply, and further, maintain visibility of the ...  
JPH1181728A
To provide a modularized method for construction of a reaction tower wherewith the reaction tower can be transported, being fabricated as a unit at a factory, with a less amount of temporary reinforcing members for transport and term of ...  
JP2873139B2
PURPOSE: To shorten the time interval required for carrying-in and setting of condenser and the work schedule for installing the condenser after starting building of T-G pedestal by carrying in the components of condenser in the form of ...  
JP2865015B2  
JP2864312B2  
JP2858929B2  
JPH1136814A
To make strength even by setting poles supporting a building at equal intervals, and concurrently, improve the work of carrying a heavy weight into the building. A power generation plant building is divided into a high building part 1a a...  
JPH1136590A
To reduce man-hours of the construction site and the construction period in the construction work of an atomic power plant, by providing a slit- shaped dock at the nearby position of the atomic power plant building and a crane to rationa...  
JPH1136815A
To provide a reasonable facility structure and its work execution method for circulating water pipe lines in a building of power generation facilities. The installation of a circulating water pipe lines 3 (3a and 3b) laid in a building f...  
JP2589967Y2  
JPH1130436A
To refit a conventional clean room into a new clean room, satisfying new specifications, by a method wherein a first dust collecting filter is installed on the ceiling of an area, demanding a high cleanness locally in a working room, whi...  
JP2852293B2
To shorten an installing stage of an upper barrel of a condenser constituting a critical pass of a turbine building construction process and reduce the number of temporary installed members attendant on their installation work. In the ca...  
JP2843820B2
To make them noninfluential from scattering of a medicine to frame materials of a medicine handling facility, and facilitate repair and remodeling by arranging a wall body by stretching a face plate on the indoor side of a frame material...  
JP2842250B2  
JP2587381Y2  
JP2587582Y2  
JP2835595B2  
JP2586510Y2  
JPH10314709A
To prevent the shortage of oxygen and the dispersion of smell due to an excess moisture from occurring by continuously performing an odorless decomposition through mixing a photosynthesizing and deodorizing bacterium with the help of a t...  
JPH10306606A
To conduct transport onto a construction field and assembly on the construction field efficiently and to carry out works such as welding, gas cutting, a shot blasting, paintings or the like conveniently without being subject to the effec...  
JP2822645B2  
JPH10292656A
To improve the workability, and to shorten the construction period by constructing a lower structure and a cylindrical wall under a housing container, and arranging a top slab and a pool, which are integrally assembled with each other on...  
JP2816950B2
PURPOSE: To on-line-process managing item processes, design assistance processes, and field photograph transmission processes, by mutually connecting together a construction managing center, construction field offices, and personal compu...  
JPH10281403A
To ensure safety of an operation by assembling a top girder in parallel with an assembling step of a support structure of a boiler body, and sequentially assembling the body under the girder by following lifting up of the girder, thereby...  
JPH10280717A
To eliminate the need for a temporary member, to advance operation smoothly and quickly and to shorten the term of works. In the constructing method of the boiler, a support 1 consisting of channel steel having a U-shaped cross section i...  
JPH10266601A
To lower the construction cost, and to shorten the construction period by eliminating construction, loading an removal of a temporary hoisting part to be finally eliminated. Both ends of an extra-large girder 10 are formed of a lower bea...  
JPH10266602A
To facilitate the installation of a module structure so as to shorten the construction period at the time of constructing a building of a plant using module structure. A steel pillar 1 of a room inside of a building of plant, a steel fra...  
JPH10260285A
To reduce the dependency of construction of a reactor power station on external crane by using more often the crane usually placed in the reactor power station. For a plurality of buildings 1 and 2 of reactor power station, the upper par...  
JPH10259673A
To establish a constructing method for plant facilities which is capable of decreasing the unit costs of construction by shortening the period required to carry out the works of constructing the plant facilities. A caisson structure 203 ...  
JP2803507B2
PURPOSE: To enhance a radio-wave absorbing characteristic and to enhance the maintenance property of a driving device for an antenna positioner in a radio-wave darkroom. CONSTITUTION: Regarding a support 32 for an antenna positioner 31 i...  
JP2581228Y2  
JP2800677B2  
JPH10245919A
To provide a partition in a clean room with simple work by installing partition columns between the intersection of ceiling frames and floors, and fitting an air-tight curtain material along the ceiling frames and the partition columns. ...  
JPH10239478A
To provide a bonding strength equal to or higher than the setting structure of a conventional reactor containment vessel, simplify the construction, realize the shortening of the term of works, and reduce the cost of materials. In this s...  