To enable efficient conversion of strong winds generated around the buildings to electric energy and improve power generation efficiency by controlling the wind flow around the buildings, generating a strong wind region around the buildi...
|
JP2920865B2 |
|
JPH11166323A |
To attain the remarkable shortening of the whole term of works including a building by contriving the construction of a large-sized frame so as to be advanced in parallel to the construction of the building when the large- sized frame is...
|
JPH11166311A |
To easily lay a track on which a carriage with track travels on a floor. In gratings 1 constituting the floor of a clean room, a guide groove 1c and two mounting grooves 1d are formed. By joining the gratings 1 together, a guide rail 17 ...
|
JPH11159007A |
To provide a module column base structure, which is suitable for reduction in constructing duration and for improvement in construction safety, and an installing method thereof by improving executability and execution precision in instal...
|
JPH11159177A |
To considerably reduce the installation time period on the job site by functionally dividing a plant into modules and prefabricating and testing the equipment, plumbing and electric wiring modules in a factory for each module. A module 1...
|
JPH11152849A |
To reduce material cost and assembling manhour at site and prevent water from leaking outward at sticking adjacent outer facing panels together by forming the one end part of an outer facing panel into a projection streak, and the other ...
|
JPH11153335A |
To shorten the assembling time of a filter supporting frame for clean room by connecting frames to each other with a simple structure by making the pitch between the frames changeable without performing size measurement and working. A fi...
|
JP2901462B2 |
PURPOSE:To shorten the work schedule while enhancing the work efficiency in the installation of steel structure of lower dry well Within a reactor container. CONSTITUTION:A main beam 2 for upper floor, a main beam 3 for lower floor havin...
|
JP2900984B2 |
|
JP2900024B2 |
|
JPH11131592A |
To dispense with removal of existing gable walls and secure the original aseismetic strength, by arranging a large-sized rigid frame of a reinforced concrete structure with buit-in steel frames having large openings at both gable faces o...
|
JPH11101016A |
To extend a production area while harmonizing production scale with air-conditioning scale. In the initial production stage, an initial production area 4 and an initial non-production area 5, including an underfloor and a ceiling plenum,...
|
JPH11101017A |
To enable inexpensive constitution of a temporary partition for partitioning a production area from a non-production area in the airtight manner and to realize removal with a simple work. In this clean room plant, an initial production a...
|
JP2881294B2 |
|
JPH1193441A |
To provide high airtightness and easily control of the environment of an inner space although the installation and the withdrawal are easy by providing an opening part upward opening, and closing a gap between side walls forming the inne...
|
JPH1183104A |
To provide a low-temperature clean booth which can put only the required region at low temperature at low cost and simply, secure cleanness, and cope with the change of the production line simply, and further, maintain visibility of the ...
|
JPH1181728A |
To provide a modularized method for construction of a reaction tower wherewith the reaction tower can be transported, being fabricated as a unit at a factory, with a less amount of temporary reinforcing members for transport and term of ...
|
JP2873139B2 |
PURPOSE: To shorten the time interval required for carrying-in and setting of condenser and the work schedule for installing the condenser after starting building of T-G pedestal by carrying in the components of condenser in the form of ...
|
JP2865015B2 |
|
JP2864312B2 |
|
JP2858929B2 |
|
JPH1136814A |
To make strength even by setting poles supporting a building at equal intervals, and concurrently, improve the work of carrying a heavy weight into the building. A power generation plant building is divided into a high building part 1a a...
|
JPH1136590A |
To reduce man-hours of the construction site and the construction period in the construction work of an atomic power plant, by providing a slit- shaped dock at the nearby position of the atomic power plant building and a crane to rationa...
|
JPH1136815A |
To provide a reasonable facility structure and its work execution method for circulating water pipe lines in a building of power generation facilities. The installation of a circulating water pipe lines 3 (3a and 3b) laid in a building f...
|
JP2589967Y2 |
|
JPH1130436A |
To refit a conventional clean room into a new clean room, satisfying new specifications, by a method wherein a first dust collecting filter is installed on the ceiling of an area, demanding a high cleanness locally in a working room, whi...
|
JP2852293B2 |
To shorten an installing stage of an upper barrel of a condenser constituting a critical pass of a turbine building construction process and reduce the number of temporary installed members attendant on their installation work. In the ca...
|
JP2843820B2 |
To make them noninfluential from scattering of a medicine to frame materials of a medicine handling facility, and facilitate repair and remodeling by arranging a wall body by stretching a face plate on the indoor side of a frame material...
|
JP2842250B2 |
|
JP2587381Y2 |
|
JP2587582Y2 |
|
JP2835595B2 |
|
JP2586510Y2 |
|
JPH10314709A |
To prevent the shortage of oxygen and the dispersion of smell due to an excess moisture from occurring by continuously performing an odorless decomposition through mixing a photosynthesizing and deodorizing bacterium with the help of a t...
|
JPH10306606A |
To conduct transport onto a construction field and assembly on the construction field efficiently and to carry out works such as welding, gas cutting, a shot blasting, paintings or the like conveniently without being subject to the effec...
|
JP2822645B2 |
|
JPH10292656A |
To improve the workability, and to shorten the construction period by constructing a lower structure and a cylindrical wall under a housing container, and arranging a top slab and a pool, which are integrally assembled with each other on...
|
JP2816950B2 |
PURPOSE: To on-line-process managing item processes, design assistance processes, and field photograph transmission processes, by mutually connecting together a construction managing center, construction field offices, and personal compu...
|
JPH10281403A |
To ensure safety of an operation by assembling a top girder in parallel with an assembling step of a support structure of a boiler body, and sequentially assembling the body under the girder by following lifting up of the girder, thereby...
|
JPH10280717A |
To eliminate the need for a temporary member, to advance operation smoothly and quickly and to shorten the term of works. In the constructing method of the boiler, a support 1 consisting of channel steel having a U-shaped cross section i...
|
JPH10266601A |
To lower the construction cost, and to shorten the construction period by eliminating construction, loading an removal of a temporary hoisting part to be finally eliminated. Both ends of an extra-large girder 10 are formed of a lower bea...
|
JPH10266602A |
To facilitate the installation of a module structure so as to shorten the construction period at the time of constructing a building of a plant using module structure. A steel pillar 1 of a room inside of a building of plant, a steel fra...
|
JPH10260285A |
To reduce the dependency of construction of a reactor power station on external crane by using more often the crane usually placed in the reactor power station. For a plurality of buildings 1 and 2 of reactor power station, the upper par...
|
JPH10259673A |
To establish a constructing method for plant facilities which is capable of decreasing the unit costs of construction by shortening the period required to carry out the works of constructing the plant facilities. A caisson structure 203 ...
|
JP2803507B2 |
PURPOSE: To enhance a radio-wave absorbing characteristic and to enhance the maintenance property of a driving device for an antenna positioner in a radio-wave darkroom. CONSTITUTION: Regarding a support 32 for an antenna positioner 31 i...
|
JP2581228Y2 |
|
JP2800677B2 |
|
JPH10245919A |
To provide a partition in a clean room with simple work by installing partition columns between the intersection of ceiling frames and floors, and fitting an air-tight curtain material along the ceiling frames and the partition columns. ...
|
JPH10239478A |
To provide a bonding strength equal to or higher than the setting structure of a conventional reactor containment vessel, simplify the construction, realize the shortening of the term of works, and reduce the cost of materials. In this s...
|