Document |
Document Title |
JP3244614B2 |
PURPOSE: To reduce a cost by a method wherein deck plates are laminated in a direction, crossing section steels at right angles, such as an H-steel, between section steels such as an H-steel, disposed at intervals of a given distance in ...
|
JP3242775B2 |
PURPOSE: To safely install a reaction tower by advancing the bottom part placed on a roller receiving base of a reaction tower toward a reaction tower set position while lifting the top part of the reaction tower by a lifting device prov...
|
JP3242747B2 |
PURPOSE: To restrain the floating up of a foundation at the time of an earthquake by arrangedly providing the foundation having a cavity part opening toward the side of a lower face with the cavity part turned toward the ground surface, ...
|
JP2001342704A |
To provide a building, the cost of which can be reduced by lowering the height of the building, while ensuring ceiling height and the workability of which can be improved.A plurality of girders 4, 4, etc., are arrayed in parallel mutuall...
|
JP2001342747A |
To realize a building capable of obtaining a comfortable and functional habitable-room space excellent in variability and energy conservation, enabling the normalization, standardization, and industrialization of design and execution of ...
|
JP2001336297A |
To reduce the distance between a vibration detesting room detesting the input of vibration and a vibration generation section, to prevent the transmission of vibration between them, and to secure spaces for piping and wiring by utilizing...
|
JP2001318183A |
To rationalize bar arrangement in the base slab of a reactor building.In the bar arrangement structure of the base slab of reactor building where a cylindrical reactor containment is provided on the base slab and a slam shape wall 4 is p...
|
JP3228180B2 |
To suppress the swing of a suspended structure against every magnitude of earthquake by connecting a suspending structure made of a structure such as a column and a beam with the suspended structure horizontally by an oil damper which ge...
|
JP3225456B2 |
PURPOSE: To make it executable even in a narrow site and the execution work performable safely as well as to enable it to start the earlier operation of equipment and facilities accomodated. CONSTITUTION: At a first process, a column 3 a...
|
JP3226547B2 |
The present invention, which relates to a plant construction work, employs a grouped products setting suspension scale structure provided with a first suspension scale capable of being supported freely on a building, a plurality of metal...
|
JP3225455B2 |
PURPOSE: To make it executable even in a narrow site and the execution work performable safely as well as to enable it to start the earlier operation of equipment and facilities accomodated. CONSTITUTION: At a first process, a column par...
|
JP2001295407A |
To provide a ceiling structure for a clean room or the like forming a latticed portion for placing FFUs or ceiling panels by joining a main ceiling rail with an auxiliary ceiling rail without a gap therebetween. An outwardly pointed holl...
|
JP3219513B2 |
PURPOSE: To use synthetic resin as a structural material, to enable firm joining of the materials by a plurality of bolts and to facilitate execution of construction. CONSTITUTION: Synthetic resin structural materials 11 and 11a are made...
|
JP3215041B2 |
To stop a fire in a housing shelf as an origin for the fire so as to surely prevent spreading of the fire even if the fire occurs by forming the floor parts and wall parts of the housing shelves for housing loads to be resistant to fires...
|
JP3212550B2 |
To optionally adjust a work space, an article housing space and a dwelling space, and to prevent consumption of useless energy by arranging an expansible/contractible adjusting body in a room, and adjusting the indoor volume by expanding...
|
JP3212233B2 |
PURPOSE: To rationalize the construction of turbine and generator areas for thermal and nuclear power plant buildings by driving a celing crane in an early stage and giving an allowance to a product loading operation position. CONSTITUTI...
|
JP3212231B2 |
PURPOSE: To enable constructing a plant even in a small space by assembling steel up to a rooftop portion, and installing temporary service facilities in the rooftop portion. CONSTITUTION: After concrete for the foundation 11 of a buildi...
|
JP2001248236A |
To provide a log joint fitting capable of absorbing twists in a log such as larch tree or the like for using the larch tree or the like as house construction materials of a compost house for processing domestic animals' excrement.This lo...
|
JP2001241202A |
To provide a community symbiosis plant for environs as target not only in ordinary time but also during the occurrence of disasters such as a great earthquake or the like in order to supply energy, information and necessaries required fo...
|
JP3205467B2 |
PURPOSE: To shorten the construction period for constructing a building and for the carrying-in and installation of machinery. CONSTITUTION: A steel frame of a turbine building 1 is formed from a plurality of movable, divided large steel...
|
JP2001227185A |
To efficiently and safely perform parallel working by clearing the procedure of construction and avoiding the overlapping work of building construction work and refuse disposal facility installing work.An underground part precedes an und...
|
JP2001227788A |
To provide a clean room device which is easy of maintenance, and can keep high degree of cleanness, and in which a chemical filter can be set to its minimum, being linked to a manufacture process, and which can perform the formation of a...
|
JP3188827B2 |
PURPOSE: To wash away snow downward by melting efficiently snow which is being accumulated on each roof of a plurality of unit greenhouses provided side by side while constructing the greenhouses in continuous ride type. CONSTITUTION: In...
|
JP3187449B2 |
|
JP2001182351A |
To provide a building provided with a processing apparatus which can process an object to be processed within a processing gas and can be carried out of a processing chamber while the apparatus is not operated. The building 1 has a proce...
|
JP2001162221A |
To provide a multi-storied building for a surface treatment line capable of effectively utilizing the waste heat from a drying oven in a multi-storied factory.In a multi-storied building P for a surface treatment line having a plurality ...
|
JP2001146812A |
To reduce the vibration of a floor panel for clean room. This floor panel 4 is formed in a triangle, and supported by support seats 2' at three points near the apex angles thereof. Damping material is filled in a part of through holes fo...
|
JP2001141199A |
To simplify a spot work execution of a city gas governing equipment, to make spot installation accuracy into high accuracy and to easily cope with requests of changes in specification and additions of functions. A skid 2 to which a groun...
|
JP2001133576A |
To lessen influence on peripheral works by burying temporary piping in a concrete building frame, and raising the same near a work area to lessen distribution of the temporary piping. Temporary piping 42 is buried in a concrete building ...
|
JP2001132256A |
To provide a facility unitizing them by providing a front room and a rear room so that the sanitariness of the clean area is secured when workers for the food manufacturing and cooking processing facility enter and leave between the gene...
|
JP3156034B2 |
PURPOSE: To eliminate the necessity for machining a bolt hole in an intermediate part of a ceiling reinforcing member and suspend the ceiling reinforcing member at an arbitrary position. CONSTITUTION: In a hoist metal fitting of a ceilin...
|
JP3155982B2 |
To facilitate the formation of a double electromagnetic shield in a floor part by connecting a reinforced mesh as a lower reinforcement forming a concrete floor to a primary shield layer of a wall, and connecting a reinforced mesh as an ...
|
JP3155981B2 |
To facilitate execution, increase product quality in executed places and to rationalize cost by fixing a wire mesh to the inside of an exterior wall material as a primary shield layer of a double elecromagnetic shield provided as a shiel...
|
JP3154577B2 |
PURPOSE: To obtain a unit assembling building structure, which can cope with the change of the kind of a work and the increase and decrease of production units with the production of the works easily, constitution of which has been simpl...
|
JP3146964B2 |
To provide a vibration isolation floor structure in which the earthquake force acting on devices to be protected from vibration and fine vibration brought when operators pass by, can be securely suppressed. A relatively large waffle slab...
|
JP3141679B2 |
PURPOSE: To use the wall face or floor face as an auxiliary means to remove dust by positively utilizing the dust adsorptivity of a chargeable paint. CONSTITUTION: A chargeable paint consisting of a fluororesin paint is applied on the wa...
|
JP3138310B2 |
PURPOSE: To shorten surely a term of construction of the whole equipment of a turbine generator. CONSTITUTION: A turbine building is constructed of a first building 1 and a second building 5 divided from each other. With an overhead trav...
|
JP2001049886A |
To easily assemble the frames of a cooling tower on a water tank, in which foundations for disposing posts in upright are made to stand close together, by using a crane car. The assembling method of the cooling tower with the water tank ...
|
JP2001041394A |
To increase the permeable load of a building and to increase the amount of weight articles. And to increase the amount of the available weight articles, and furthermore, to increase the handling amount and the handling area in the weight...
|
JP3128188B2 |
PURPOSE: To reduce the horizontal force added to an overhang roof by providing sub-posts in main posts provided on two corners of an overhang roof, respectively. and providing a horizontal support beam between the lower ends of each main...
|
JP2001020549A |
To provide a clean room which provides a good space efficiency in an entire facility by minimizing additional spaces (attic space, underfloor space).This semiconductor manufacturing factory 10 has: a clean room 12; an attic space provide...
|
JP3124377B2 |
PURPOSE: To obtain a reactor container enabling execution of approach for check and maintenance to apparatuses installed in a lower drywell, by performing a function of pressure suppression at the time of a loss of coolant accident by an...
|
JP3125165B2 |
PURPOSE: To facilitate working and assembling, and reduce cost by supporting plural large beams with walls or pillars so as to form a unidirectional frame structure, and arranging plural small beams in a direction for crossing these. CON...
|
JP3120106B2 |
|
JP2000345621A |
To provide a temporarily provided module, a module assembly method and a connection metal part in which the temporarily provided module is formed using a highly versatile material, the recyclability is improved, and the temporarily provi...
|
JP2000336962A |
To obtain flexibility in response to the construction of a vibration- resistant equipment for a semiconductor factory, and to constitute the equipment at a low cost.In the semiconductor factory in which a utility floor 70 is installed at...
|
JP3114602B2 |
To provide a device which can suppress a vertical supporting force of which a laminated rubber takes charge even when a large earthquake has arisen and hence, which does not require to install a laminated rubber isolator with a large sup...
|
JP2000329386A |
To realize a spatial configuration dealing with development of apparatus over several generations without requiring a large scale remodeling work by a structure wherein partition wall members are supported by a height adjusting means for...
|
JP2000319997A |
To construct a building in a shape capable of coping with a change and a renewal of a part of the building and being hardly influenced by an external environment. A core part 1 ranging over the whole periphery is arranged in an outer per...
|
JP3108740B2 |
|