Document |
Document Title |
JPH07158047A |
PURPOSE: To use high moisture soil effectively without disposing of it as industrial waste and reduce the construction cost for banking by adding a solidifier to the high moisture content soil sampled from a construction site and using i...
|
JPH0715865Y2 |
|
JPH0714406Y2 |
|
JPH0726403B2 |
|
JPH0723608B2 |
|
JPH0718123B2 |
|
JPH079102B2 |
|
JPH074539U |
[Purpose] It is an object of the present invention to provide a foamed resin block for a civil engineering foundation that can be easily and accurately cut. [Constitution] A rectangular parallelepiped block in which the ratio of the leng...
|
JPH07881B2 |
|
JPH06344328A |
PURPOSE: To provide fast-curing fluidized treated soil obtaining sufficient strength within a short time without generating material separation by a casting construction method and to rapidly construct a roadbed/road body using the same....
|
JPH06341102A |
PURPOSE: To provide construction of lighter embankment by reducing the load on the ground and decreasing the possibility of distortion. CONSTITUTION: Concrete elements 10a, 10b, 10c capable of being assembled are fixed to each other so a...
|
JPH0699882B2 |
|
JPH0647477Y2 |
|
JPH0685403U |
[Purpose] It is an object of the present invention to provide a foamed resin block for a civil engineering foundation capable of easily and accurately stacking foamed resin blocks without matching joints between the blocks. [Constitution...
|
JPH06330985A |
PURPOSE: To provide a damping structure which is constituted to provide a sufficient vibration cut-off effect and solid propagation sound cut-off effect and execute maintenance to suppress lowering of the function. CONSTITUTION: A floor ...
|
JPH06330986A |
PURPOSE: To provide a damping structure to provide a sufficient vibration cut-off effect and solid propagation cut-off effect. CONSTITUTION: Under a lower layer body 10 below a floor slab B on which a track 2 being a vibration generating...
|
JPH0694555B2 |
PURPOSE:To provide the subject material and method which enable the formation of a track bed having sufficient water permeability and supporting strength by a simple work in a short time. CONSTITUTION:This material is prepd. by mixing ma...
|
JPH0694649B2 |
|
JPH0689530B2 |
PURPOSE: To easily build a drainage ditch on a track bed of a subway by installing a synthetic resin mould formed by vertically mounting the side plates having a flange edge on their lower ends from both side edges of a top plate on the ...
|
JPH0684616B2 |
|
JPH06294102A |
PURPOSE: To reinforce a soft ground in accordance with the characteristics thereof, by arranging PC steel members to get a suspended condition on a roadbed to conduct a tension and adjusting the quantity of steel members and the tensile ...
|
JPH0674567B2 |
|
JPH0674589B2 |
|
JPH0665802B2 |
|
JPH06228904A |
PURPOSE: To effectively use so called returning-ready-mixed concrete by reusing admixture mixing coral with a surplus material obtained by washing ready- mixed concrete consisting of cement, crushed stone and sand as a base course materi...
|
JPH0628569Y2 |
|
JPH0657947B2 |
|
JPH0657937B2 |
|
JPH0656025B2 |
|
JPH0656013B2 |
|
JPH0656019B2 |
|
JPH0656026B2 |
|
JPH0656024B2 |
|
JPH0656001B2 |
|
JPH0645491B2 |
PURPOSE:To provide an inexpensive regenerated roadbed course material excellent in the roadbed supporting power at the initial stage and over a long period, water resistance, execution property, etc., by using a waste cement concrete mat...
|
JPH0645490B2 |
PURPOSE:To effectively utilize coal ashes and to obtain a granulated material preferable to a water retention material, an oil absorbent and aggregate of the secondary product of concrete for a roadbed material by adding both cement and ...
|
JPH06158605A |
PURPOSE: To very simply form a light member laminated structure by banding a small collective body composed of a plurality of blocks with a band so as to enclose its outer periphery, and further mutually banding the banded small collecti...
|
JPH06146239A |
PURPOSE: To enhance the workability during laying of erosion mats by forming through-holes in a plurality of cobble stones, and by inserting couplers through the through-holes so as to integrally incorporate the cobble stones in a unit-l...
|
JPH0637762B2 |
|
JPH06123101A |
PURPOSE: To construct a base and a foundation ground with measures taken against even soft geological nature or an ill drained place by cutting and breaking a used rubber tire into chip, and utilizing it as a constructing aggregate. CONS...
|
JPH0625401B2 |
PCT No. PCT/FI89/00059 Sec. 371 Date Jan. 24, 1990 Sec. 102(e) Date Jan. 24, 1990 PCT Filed Mar. 30, 1989 PCT Pub. No. WO89/09853 PCT Pub. Date Oct. 19, 1989.An insulated trafficked surface having a first sheet of steel having corrugatio...
|
JPH0623442B2 |
|
JPH0612012Y2 |
|
JPH0612006Y2 |
|
JPH0623441B2 |
|
JPH0611961B2 |
|
JPH0596102U |
[Purpose] This is because it is difficult to properly construct the contact surface between the road shoulder embankment and the roadbed when constructing a new road. In order to carry out this construction easily and correctly, a part o...
|
JPH05508376A |
A composition, suitable for use as a base in the construction of roads, parking lots, and other areas, is formulated from an ash aggregate comprising municipal solid waste incinerator ash, MSWIA, mixed with an aggregate material; upon ad...
|
JPH0575788B2 |
|
JPH05255907A |
PURPOSE: To effectively utilize the ground by erecting a pair of wall-like concrete layers, filling a banking material inside, and penetrating, fixing, and reinforcing the concrete layers with multiple solid rods made of fiber-reinforced...
|