Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
DATA MANAGEMENT SYSTEM, MANAGEMENT METHOD, AND MANAGEMENT PROGRAM
Document Type and Number:
WIPO Patent Application WO/2021/111999
Kind Code:
A1
Abstract:
The objective of the present invention is to perform data management for reflecting the actual situation relating to construction in a design. In order to achieve this objective, a management system is provided with: a design database (3) for recording design data relating, at least, to a member ID, member coordinates, and a member shape relating to a member in a building; a measurement database (4) for recording measurement data relating to the building; a starting point member selecting unit (5) for selecting a starting point member from the design database; a measurement information selecting unit (6) for selecting the measurement data corresponding to the starting point member, from the measurement database; and a current model creating unit (7) for creating a current model obtained by using the measurement data to perform shape modification of a design model of the starting point member created from the design database, in relation to the starting point member.

Inventors:
DOJI ATSUSHI (JP)
YAMADA TOSHIO (JP)
NISHITA NOBUYUKI (JP)
YANOBE SATOSHI (JP)
KANEKO JUNKI (JP)
Application Number:
PCT/JP2020/044194
Publication Date:
June 10, 2021
Filing Date:
November 27, 2020
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
TOPCON CORP (JP)
International Classes:
G06Q50/08; G06F30/10; G06F30/13
Foreign References:
JP2014010588A2014-01-20
JP2012068047A2012-04-05
JP2019021190A2019-02-07
Other References:
TOMITA, HIROYUKI; SAKAMOTO, SHINTARO: "Equipment construction which used BIM", HEATING, AIR-CONDITIONING AND SANITARY ENGINEERING, vol. 86, no. 5, 5 May 2012 (2012-05-05), JP , pages 39 - 43, XP009537230, ISSN: 0386-4081
Attorney, Agent or Firm:
YAGI Hidehito et al. (JP)
Download PDF: