Document |
Document Title |
JP2006176019A |
To efficiently construct wiring of electric wires in a narrow cable run in a vessel by a small number of persons by providing a pulley at an appropriate position of the vessel, making a wire endless and drawing-in the electric wire mount...
|
JP3790822B2 |
To provide a wind load estimation method in which an estimation accuracy of a wind load is improved by substantially reducing limitations caused by involvement of user operations while the wind load is estimated. The wind load estimation...
|
JP3778305B2 |
To quantitatively and suitably execute division of a sheet having a curving surface by calculating strain generated at the time of bending a flat sheet to the planned curving surface with a finite element method, selecting the heating co...
|
JP3768865B2 |
To eliminate a long holding shaft essential in conventional inversion equipment, by requiring no connection between a one-end gripping part and a the-other-end gripping part, to simplify the inversion equipment, to restrain an equipment ...
|
JP2006079247A |
To provide a method for creating a ship model that allows handling the ship model in an ergonomically comfortable manner by means of a small number of parameters.The method for creating a ship model comprises a step S13 for creating cont...
|
JP3758908B2 |
To recycle a treated scrapped boat as effective resources, by removing unnecessary parts from the scrapped boat moored or left at a harbor, applying a carbonization activation treatment to an FRP part, and applying an activation treatmen...
|
JP2006507984A |
The invention relates to a marine vessel, such as ships, floating platform etc, where the whole or part(s) comprises a layered structure and a layered structure for use in vessels, including two substantially parallel metal sheets with a...
|
JP3752407B2 |
To nearly completely treat large-sized wastes by carbonization treatment without performing incineration treatment. The carbonization furnace for large-sized wastes is equipped with a cylindrical furnace body 2 where an upper end is open...
|
JP2006027423A |
To provide a hold frame inspecting vessel for a vessel using a portable ladder for inspecting the welded parts of the broadside shell plates of the vessel with a hold frame to be welded to the broadside shell plates, with which the ladde...
|
JP3118207U |
To provide an in-hold inspection facility capable of surely checking a deck on a hull and preventing a decrease in deadweight. This is an inspection facility provided inside a hold, and includes a passage portion 10 provided between adja...
|
JP2006021726A |
To provide an inspecting device for hold side wall structural members capable of easily and surely inspecting structural members and easy to be carried and housed to make it easy to come close to a high part of the hold side wall of a bu...
|
JP2006021724A |
To provide an inspecting device for hold side wall structural members capable of easily and surely inspecting the structural members and easy to be carried and housed to make it easy to come close to a high part of the hold side wall of ...
|
JP2006021721A |
To provide an inspecting device for hold side wall structural members capable of easily and surely inspecting structural members and easy to be carried and housed to make it easy to come close to a high part of a hold side wall of a bulk...
|
JP2006502944A |
The present invention relates to a non-shrink high viscosity chemical grout composition, more particularly to a non-shrink high viscosity chemical grout composition comprising, on the basis of solid content, a) 100 parts by weight of a r...
|
JP3737423B2 |
To provide a manufacturing apparatus of a small planing boat capable of being installed in a small space, suppressing equipment cost and improving productivity. In this manufacturing apparatus 10 of a small planing boat, a traveling pass...
|
JP2005505473T5 |
|
JP3730163B2 |
To inspect the performance of a small-sized planing boat in a water tank in a condition equivalent to an actual using condition, by preventing jet water from hitting on the side board of the water tank and returning directly to the stern...
|
JP3722936B2 |
To surely correct strain regardlessly of the thickness of a material to be corrected by extending one end of a rotating shaft in the axial direction and making a part of plural drive rollers movable to a retreated position not facing plu...
|
JP2005324672A |
To provide a water cut-off device for maintaining an underwater working space capable of cutting off water by flexibly following unevenness caused by deposition of aquatic organism such as shell fish.In a seal material 30, a flexible mat...
|
JP2005324650A |
To place/fill concrete in the entire extensive flat space without inverting a steel shell.In a method for manufacturing a hybrid structural body in which concrete 26 is placed on an outer surface of a bottom plate part 5 of a steel shell...
|
JP2005315846A |
To automatically extract three-dimensional information related to the height of a target and elements (for example, structure in ships) for constituting the target, regarding a three-dimensional information extraction device based on ima...
|
JP3714577B2 |
To provide a heat insulating panel type uniform and efficient heat insulating work method shortening an execution time with no execution experience required, and to provide a panel type work method able to effectively utilize a curved su...
|
JP3714576B2 |
To provide an in-hold spraying type heat insulating construction method for forming a continued heat insulating surface and establishing air- tightness and heat insulation of an individual hold paying attention not only to heat insulatio...
|
JP2005297905A |
To place concrete fully in the whole flat space having a large width without inverting a steel shell.A concrete placing method of a hybrid structure is configured so that concrete 16 is placed to the outside surface of the bottom plate p...
|
JP2005297813A |
To improve an outboard motor propeller for a motorboat racing boat and more specifically to improve an outboard motor propeller for a motorboat racing boat used for a racing boat outboard motor used in a motorboat race.Damage of a wing b...
|
JP2005282490A |
To provide a program and a method for preparing an aerofoil profile capable of changing a plurality of design factors determining the profile of a camber line on the leading edge side and trailing edge side of the camber line independent...
|
JP3699392B2 |
To provide an adhesive curing acceleration apparatus for a boat body capable of shortening a curing time and capable of suppressing equipment cost. The adhesive curing acceleration apparatus 10 for the boat body comprises a frame body 20...
|
JP2005239142A |
To provide a sheathing board for closing a seawater inflow hole of a sea chest of a vessel provided with a ballast tank (seawater tank) to safely and quickly perform a work and to prevent separation and washout of the sheathing board.In ...
|
JP3692230B2 |
To sharply curtail those of labor, time and expenditure by dispensing with any arrangements for a large-sized lifting and transferring installation such as a marine crane or the like at each time a hatch cover is shifted, in this hatch c...
|
JP2005231485A |
To provide a traveling type working scaffold with easy operation and simple attitude adjustment of a working base, in which movement speed in height direction (Z direction) is fast and a driving part is not sunk.The traveling type workin...
|
JP2005525267A |
A method and mounting method for finishing the surface of a ship deck (30) by using a surface finishing member (21) composed of a board (20) or a deck board and attaching the board or the member to the deck. Tool (10). When mounting the ...
|
JP3686420B1 |
To provide a hull strength evaluating method and a hull strength evaluating system, capable of efficiently evaluating the strength of a hull receiving underwater explosion of a torpedo or a mine by practical scale calculation. To a coupl...
|
JP3676321B2 |
To easily measure thrust of a small gliding boat without requiring any labor and time, and to measure also thrust of propulsion machinery under a condition mounted on a hull. This thrust measuring instrument 10 for the small gliding boat...
|
JP2005195053A |
To provide a reduction gear device, and a method for remodeling, in which a propeller shaft side member for a 1-forward/backward speed reduction gear device can be used to remodel it into a 2-forward speed and 1-backward speed reduction ...
|
JP3669661B2 |
To reduce the space required for inverting a panel and to restrain the distortion and bending of the panel at the time of inverting by combining an upper side table to the lower side table placed the panel and rotating/driving. The panel...
|
JP2005178721A |
To provide a propulsive device of a vessel capable of simplifying and reducing the weight of a rudder installing structure by arranging so that a propeller shaft is inclined up toward the back and thereby approaching the propeller rear s...
|
JP3663693B2 |
To perform building and a repair work for a large structure, such as the steel floor system of a ship and a bridge, by utilizing a general quay. A barge 2 is constituted in such a manner that by regulating a quantity of water of ballast ...
|
JP2005145448A |
To provide a method capable of shortening the time of constructing a terminal for liquefied natural gas (LNG) or liquefied petroleum gas (LPG).The method for constructing an LNG or LPG terminal (3) including an external structure (7) and...
|
JP3656052B2 |
To provide a ship cable installation frame capable of increasing an operating efficiency by improving a working attitude based on a human engineering. This ship wire installation frame 7 used for installing cable on the deck rear ceiling...
|
JP3643667B2 |
To eliminate a complex lifting operation of a propeller and attach a propeller efficiently and safely by making the propeller, horizontally held on a movable cradle in a first process, into a rising state in a second process, and then ha...
|
JP2005104187A |
To provide a duct device of a tanker which reduces effort required for maintenance, suppresses the maintenance cost, and has high traffic property and safety.In the duct device 50 of the tanker, a duct 51 having a cross sectional area of...
|
JP3623941B2 |
To provide a ship wire laying rack capable of attaining high working efficiency by improving a working attitude, based on human engineering. This ship wire laying rack 7 comprises a first cable hanger 73, a cable-laying guide 74, and a s...
|
JP2005035501A |
To solve a problem wherein, when several kinds of oil is conventionally loaded on a tanker, a cargo is assigned to each tank and heights of the cargos of all tanks and under water depth and tilting of the hull are calculated, hence the c...
|
JP2005022630A |
To provide a renovation method of a high-speed vessel suppressing an increase in wave resistance during high-speed navigation and reducing a propulsion horsepower.A renovation method of a high-speed vessel that mounts a submerged body wh...
|
JP2005008132A |
To solve problems of labor and labor hours, and degree of risk in a welding part or a R part in building a ship, or a pollution problem of an abandoned FRP ship.A recyclable and weldable material without causing pollution is used. The ma...
|
JP2005000998A |
To provide a method for controlling the welding by a three-dimensional X-Y-Z coordinate system.In the method, by which a welded structure is provided as several pieces disposed with an combined body on a three-dimensional supporting base...
|
JP2004334714A |
To provide a parameter optimization method, parameter optimization device and parameter optimization program suitable to the real-time optimization of a parameter relating to a control processing of a control system for a predetermined c...
|
JP3536408B2 |
PURPOSE: To automatically distribute a lounge to a veneer panel by carrying the veneer panel into a distributing stage from the outside, carrying the lounge into a lounge feeding stage from the outside, and reciprocating a lounge shiftin...
|
JP3525977B2 |
To reduce the working time, to improve the safety in the working, and to provide a joint of high strength with an excellent bead shape. Plate members 1, 2 are arranged in a substantially horizontal manner while slightly separated from ea...
|
JP3519465B2 |
PURPOSE: To contrive the preceding boring for a shaft system by installing a plurality of pillar receiving load measuring jigs consisting of the pressure gauges for pointing each oil pressure of a hydraulic ram and a hydraulic pump which...
|