Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 401 - 450 out of 2,681

Document Document Title
JP2010065389
To provide an unequal setting control structure of a structure capable of eliminating the need of supplying and discharging water between itself and the outside and capable of suppressing the occurrence of unequal setting by quickly cont...  
JP2010059621
To enable an underground structure to resist buoyancy even if the great buoyancy acts on the underground structure.A protrusion 30 protruding in a strip shape so as to be integrated with an underground structure body 10 is formed on the ...  
JP2010059622
To enable an underground structure to resist buoyancy even if the great buoyancy acts on the underground structure.A protrusion 30 which protrudes in a direction approximately perpendicular to the surface of an underground wall 20 so as ...  
JP2010059687
To provide an corrosion prevention lining method of a pillar member which can reduce labor necessary for installing and removing a form and can easily form an corrosion prevention lining of a predetermined shape.A fiber sheet 2 which can...  
JP2010059690
To provide an improved ground construction method which can reduce vibration entering a dwelling environment which has a wide range of vibration domains from low frequencies to high frequencies.A sliding mechanism 10 is provided between ...  
JP2010043453
To solve a problem in a conventional manhole lift restraining apparatus wherein horizontal shakes are not particularly considered although horizontal shakes occur as well as vertical shakes in case of the occurrence of an earthquake, and...  
JP2010043157
To make use of heavyweight concrete containing baryte, to reduce disposal cost in disposal of a balance weight for construction equipment discarded, to recycle the discharged waste material, and to provide a heavyweight material suitable...  
JP2010037831
To provide a construction method for soil improvement which can control displacement in the peripheral ground when banking is performed on the soft, clay ground or the like.The construction method for soil improvement is one for soil imp...  
JP2010024751
To provide a lift-preventing plate for preventing a manhole pipe provided in the ground from floating by a liquefaction phenomenon of the ground due to an earthquake or the like.The lift-preventing plate for a manhole is composed of a pl...  
JP2010013888
To provide a structure of preventing heaved uplift of a manhole, caused by an earthquake etc., which facilitates installation of a concrete flange on an external surface of a right circular cylinder of the concrete manhole, positively su...  
JP2010007280
To provide a high-performance, easy-to-assemble and vibration-proof separator which surely blocks the transmission of vibrations from the side of an earth retaining wall to a concrete wall.This vibration-proof separator 1 is interposed b...  
JP2010007450
To provide a groundwater flow conservation method which enables the design of water passage facilities to be properly performed by means of an equivalent coefficient of permeability giving consideration to a groundwater flow to the water...  
JP2010007449
To provide a groundwater flow conservation method which enables the design of a well structure to be properly performed by reflecting water permeability of an opening of the well structure installed in an earth retaining wall, and which ...  
JP2010007448
To provide a groundwater flow conservation method which enables the design of the well structure to be properly performed by means of the relational expression, and also enables the suitable securement of the groundwater flow, by finding...  
JP2010001668
To expand an application range; to simplify construction work; and to reduce construction costs.This ground vibration transmission suppressing systems 10 and 30 for suppressing the transmission of ground vibrations to a vibration side bu...  
JP2009293365
To provide a ground reinforcing structure capable of reducing horizontal pressures to the wall surfaces of various wall sections by the elastic characteristics of fractured tire rubber chips (tire shreds) cutting and fracturing a waste t...  
JP2009281001
To provide a lift prevention method for an underground buried object, which brings about the great effect of preventing the lift of an underground buried object, and proper construction process and durability.A through-hole 11a is formed...  
JP2009263739
To provide a technique of an electric corrosion protection of a reinforced concrete structure configured to increase adhesion force of the thermal spraying metal adhering to the surface of the concrete structure in an anodic protection s...  
JP2009263860
To provide equipment and a method for removing extraneous matter on an inner surface of a hollow pile, which enable the extraneous matter such as sediment and soil cement, adhering to the inner surface of the hollow portion of the hollow...  
JP2009264039
To provide a frost heave preventive structure preventing breakage of a vertical pipe joint part and damage of a vertical pipe and the vertical pipe joint part due to a freezing and frost heave phenomenon.The frost heave preventive struct...  
JP2009263871
To provide an inexpensive method for strengthening surrounding ground of an existing small-scale underground structure, which dispenses with large-scale construction equipment, and which is superior in the transmission efficiency of vibr...  
JP2009256896
To provide a ground anchor free from a risk of breaking and capable of preventing the sudden fall of a building.The ground anchor 1 is constituted to drive an anchor 5 from a building foundation 4 into the support ground 2. The anchor 5 ...  
JP2009250805
To achieve response analysis in a time region to a model to be analyzed having an energy transfer boundary as a wave motion boundary model.In performing time history response analysis of the model to be analyzed, having an energy transfe...  
JP2009249915
To provide an uplift preventing manhole easily applicable not only to newly-constructed manholes but also to existing manholes and having excellent workability.An annular extension receiving part 11 is temporarily fastened with lock scre...  
JP2009249834
To provide an underground structure such as a tunnel skeleton and a caisson, which is provided with a water passing means for allowing the passage of groundwater into the underground structure such as the tunnel skeleton and the caisson,...  
JP2009235512
To provide a highly reliable method for deciding the spacing in the installment of anodes for electrical protection, when linear anode type electrical protection is performed to a concrete structure, which can swiftly and correctly decid...  
JP2009235535
To provide a new electric protection system for a buried pipe in which AC signals causing noise in a damage monitoring system are not applied to a buried pipe.The electric protection system for the buried pipe comprises: an external powe...  
JP2009235689
To provide a vibration damping structure installable and removable at reduced labor and cost and installable and removable in a short time.In a unit block 1 for forming the corrugated vibration damping structure 4 which cuts off or reduc...  
JP2009228392
To provide a device for preventing the lift of a manhole during earthquakes.A water pressure diminishing device 20 comprises: a through pipe 31 which penetrates a sidewall of the manhole; a flexible pipe body 22 with water permeability, ...  
JP2009228393
To restrain the passage of an emergency vehicle from becoming difficult due to the lift of the manhole during earthquakes.A bottom plate 11 of the manhole 10 is preformed in such a shape that a diameter of the bottom plate 11 is larger t...  
JP2009215862
To provide an installation structure of a permanent form and a positioning member for the permanent form capable of vertically installing a form panel to a tilted sheet pile with a smaller number of parts.This installation structure of a...  
JP2009209676
To provide packing for water cut-off of a PC wall structure installable without being affected by seasons and atmospheric temperatures and adaptable to a minute displacement in an earthquake, a method of installing the packing, and a too...  
JP2009203527
To form an electrodeposited coating preventing corrosion of a steel structure in seawater without using an external power source.An anode 12 for forming an electrodeposited coating is fitted to the part of a steel pipe pile 2 sunk into s...  
JP2009203715
To simply achieve sealing between a plurality of concrete walls.There is provided a waterproof sealing member which is arranged in the vicinity of a boundary between the concrete walls, for sealing a clearance between the walls. The seal...  
JP2009197292
To provide a corrosion prevention apparatus of steel structure capable of surely preventing corrosion in a boundary area of atmosphere and water surface, called as a splash and tidal zone, with a simple device, in order to maintain and c...  
JP2009185504
To provide a vibration reducing method for a road surface, which is superior in workability, an efficient aspect and a managerial aspect, and which enables vibrations and noises, generated in the passage of a train and a vehicle, to be a...  
JP2009185464
To provide a method for rebuilding a structure while preventing the existing bottom ground from rising, for performing the construction work while preventing the surroundings from being adversely affected, and for performing the work for...  
JP2009180054
To provide a method of constructing an underground vibration isolation wall with excellent construction efficiency without using a large heavy machine.This method of constructing an underground vibration isolation wall comprises an excav...  
JP2009174171
To provide a water cut-off grout method and a water cut-off grout system capable of constructing in a deep layer under high hydraulic pressure without breaking rocks.To suppress a spring 9 with high hydraulic pressure which may be produc...  
JP2009161951
To transmit a shearing force between an underground continuous wall and a concrete structure joined to the underground continuous wall by a simple configuration.In this shear transmission structure 1 of a LNG underground tank 10, a shear...  
JP2009150166
To provide a concrete composite product having a complex structure which can prevent cracking of a covering material molded by concrete on the peripheral surface of a core material.The concrete composite product 10 is provided with the c...  
JP2009138434
To obtain a construction method for making a manhole connecting section of an existing pipe aseismic, which makes workability good, which eliminates the risk of damaging an underground cable, a buried pipe for various fluids, etc., exist...  
JP2009138433
To obtain a construction method for making a manhole connecting section of an existing pipe aseismic, which makes workability good, which eliminates the risk of damaging a buried object such as an underground cable and a buried pipe for ...  
JP2009127263
To provide an underground tank structure which contributes to reduction of manufacturing costs.The underground tank structure is formed of a continuous underground wall 2, a cylindrical side wall 3 having an external peripheral surface t...  
JP2009121085
To suppress an adverse effect on existing facilities such as a neighborhood house by effectively reducing vibrations propagated via ground from vibration generating sources such as a working device in a factory etc. , and vibrating sourc...  
JP2009119358
To provide a construction method of a covering material having excellent adhesion and following property to a concrete base to secure strength necessary for preventing the peel-off with less steps.The construction method of the covering ...  
JP2009121204
To provide an underground structure capable of being streamlined by employing a design concept of anticipating a large contribution of embankment placed on a flange member connected with an underground wall to resistance against lifting ...  
JP2009114685
To provide an underground buried object floatation preventing method for preventing floatation of an underground buried object at the time of an earthquake, by incorporating an earth improving method.According to the underground buried o...  
JP2009114518
To provide a method for installing an electrode for electrolytic protection for a reinforced concrete structure in which the filling work of a filling material consisting of a concrete-based solidifying material into a long groove with a...  
JP2009108547
To provide a backflow preventing and draining structure of a water supply construction, which positively shields water leakage from the construction to the outside, quickly drains water outside the construction, facilitates construction ...  

Matches 401 - 450 out of 2,681