Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 801 - 850 out of 14,055

Document Document Title
JP2013222258A
To properly display a three-dimensional structure of a structure to be a monitoring object and information obtained from measuring instruments according to a view point requested by a monitor on a display device.A monitoring controller i...  
JP5320040B2
To provide a vibrator reduced in noise during the driving. This vibrator includes: a plurality of vibrator bodies 20 which face the inside of a ready-mixed concrete and which have respective drive frequencies the phases of which are disp...  
JP2013212505A
To provide a waste coating capping sheet reduced in a variation of a water intrusion amount even if a laying condition such as a rainfall amount and a slope gradient is varied, and to provide the capping sheet by which a water permeation...  
JP5314791B2
To provide a method which enables a hydraulic fluid with pressure to be continuously supplied to a hydraulic piston motor for ascent/descent of a gate until the complete descent of the gate without use of an electric power source when th...  
JP5318081B2
To provide a water intake control method and device capable of easily and quickly executing water intake control from a dam to a hydraulic power plant. The water intake control method of this invention is for controlling water intake to ...  
JP5315088B2
To provide a panel hanger capable of simply holding the posture of a large-sized panel made of concrete at a desired angle by hanging it up by a single cargo-handling machine. A connection 5 detachably connected to a connecting reinforce...  
JP5315191B2
To provide a steel slit dam which can reduce a material cost by reducing the use of a wasteful member to the utmost, and which can exert a function of a gravel body capture member over a long period of time. This steel slit dam includes:...  
JP2013211669A
To provide a water gate monitor support system that reduces a burden placed on an observer and can suppress occurrence of an accident due to a human error.A water gate monitor support system includes a water gate monitor device that is c...  
JP2013209879A
To provide a flap gate which is hardly affected by hydraulic pressure generated by waves and suitable for installation at an oceanfront such as a beach and a harbor.A door stop 5 having a sleeve 9 communicating with the water outlet is f...  
JP5309002B2  
JP5308316B2
To provide a method of constructing a mass concrete structure capable of restraining stress/strain generated on the surface layer thereof so as to restrain the occurrence of cracks on its surface. In the construction method of the mass c...  
JP2013204272A
To provide a permeable sand control dam in which a sufficient flow rate can be ensured even in flooding and heading-up at an upstream side can be prevented.A permeable sand control dam 1 provided in a river width direction X within a riv...  
JP2013204278A
To bring the inside of a siphon pipe into a full water state efficiently when starting a siphon by eliminating the need to provide a check valve in a water source side conduit of the siphon pipe.A siphon intake system 10 comprises a siph...  
JP2013199792A
To arrange necessary functions with a simple construction.A flap gate type breakwater 1 has a mechanism that a door body 3, which can make its tip side 3b arbitrarily float upright or lie down with a rotation shaft 3a as a fulcrum point,...  
JP5307192B2
To provide a gate opening/closing device which is compact, and can surely open and close a flow passage and also open and close a door body without a complicated mechanism nor control. A gate opening/closing device 10 is provided with: a...  
JP5306801B2
To provide a concrete conveying facility capable of reducing the size and weight of a carrier for conveying freshly mixed concrete and being simplified. In the concrete conveying facility, the transport carrier 30 for conveying freshly m...  
JP5305439B2
To provide a method and a device flow-transporting an underwater sediment accumulated at the bottom of water, efficiently in bulk while being attainable in a simple structure without needing large-scale facilities and power, and to provi...  
JP2013194443A
To provide a water immersion suppression wall which suppresses water immersion without using buoyancy.When a water depth exceeds dptL, the expression is established: [a moment of rotation Mdpt1 generated when a gravity force by a mass(L1...  
JP2013189831A
To suppress shaking when erection is performed and to improve water level followability when bringing-down is started.A floating body type flap gate 1 is installed at an opening of a breakwater and is configured such that a distal end si...  
JP2013189795A
To provide a hydraulic control circuit of derricking type automatic gate equipment, which does not allow large change of a hydraulic oil circulation circuit length, is hardly affected by a height difference of an installation position or...  
JP5296918B1
[Subject] It is possible to change a form simply at the time of un-taking in water of a gutter for a water intake when a form, the time of a flood, earth and sand, etc. accumulate on a bottom at the time of a water intake in a normal sta...  
JP5299629B2
To provide an apparatus for opening/closing a sluice gate, which makes a descent speed of a door body proper during the self-weight descent of the door body, without increasing costs. This apparatus for opening/closing the sluice gate in...  
JP5300549B2
To provide a construction method of an earth structure advantageous in shutting off water from a face of slope having a vertical or almost vertical steep gradient. The construction method of the earth structure includes laying an impervi...  
JP5300815B2
To provide an intake device capable of preventing occurrence of a thermocline and an eutrophication phenomenon in a water reservoir as much as possible in a wide range. The intake device is provided inside a water reservoir such as a dam...  
JP2013185372A
To provide a drainage method for a dammed lake, which enables water in the dammed lake to be easily and rapidly discharged without use of a drainage pump.After a drain hose 5 is laid across a dammed lake 2 and a drainage position 3 on th...  
JP2013185299A
To provide an emergency shutoff water gate capable of allowing only a flow of a part of drainage having normal water quality and not allowing a flow of a part of the drainage having abnormal water quality, when the drainage has different...  
JP2013185307A
To provide a repair structure of an infilling structure and a protective body attaching metal fitting used for it.An infilling structure 22 includes a steel frame 32 having steel column materials 1 arranged at an interval in a right-left...  
JP5291611B2
To provide high flooding prevention facility capable of preventing the obstruction of visibility usually and preventing high flooding without using power only when high flooding occurs. This high flooding prevention facility is composed ...  
JP5290714B2
To reduce high lift dangerous works by precasting the parapet part of a training wall top part and streamline the construction of the training wall formed in a complicated shape when the training wall of a dam is constructed. This precas...  
JP5288929B2
To provide a technology capable of achieving, all at once, the shortening of a construction period, a reduction in the cooling cost of heat hydration and a reduction in an environmental load, in the construction of a dam body such as a l...  
JP5288307B2  
JP2013174098A
To enable a gate to be shut down without depending on manual operation or a large-sized storage battery even in an emergency such as a blackout.An emergency shutdown gate device 12 transmits output from a three-phase electric motor 18 to...  
JP5283018B2
To provide an attachment which enables the sufficient and uniform compaction of a top-of-slope section of a dam body; to provide heavy equipment for compacting the top-of-slope section, which is equipped with the attachment; and to provi...  
JP2013534282A
An automatic operation flood guard for a building holds a floatage gate in height estranged from the ground between estranged perpendicular party walls which are located in the side which suits for connection with a building. For upward ...  
JP2013170427A
To provide a mortar gate for use in a door body to open or close a water gate of water gate facilities, and a manufacturing method of the mortar gate.A mortar gate 1 is formed of a plate-like mortar which is covered with a rigid frame 2 ...  
JP2013170403A
To provide a rolling pressing attachment device which is appropriate for press-pasting work when pasting plate-like members together using an adhesive, and a rubber tube weir repair management system employing the same.A rolling pressing...  
JP5274438B2  
JP5272839B2
To provide a construction method for constructing a water shutting-off layer inexpensively in a short period of time and to provide a bentonite spreading machine used in the construction method. This bentonite spreading machine 1 is prov...  
JP5274440B2  
JP5266585B2
To provide an anchor structure having excellent durability and achieving excellent workability in construction work and to provide a construction method for the anchor structure. This anchor structure A is provided with an anchor cable 2...  
JP5268154B2
To provide a forming method of a soil cement mixture in rain capable of performing construction work while maintaining the quality of the soil cement mixture even if a construction day is rainy, and also capable of keeping the sureness o...  
JP5271484B2
To provide an emergency closing control system of waterproof equipment, which gives consideration to the safety of a person etc. near the waterproof equipment, and the public benefit of a reduction in great human and economic suffering i...  
JP5271840B2
To provide a gate device formed in a simple low-cost support structure with a small number of parts by dispensing with a hinge member of a door (gate) body (a hingeless gate). The gate device includes the door body 1 swingable into a pos...  
JP5266584B2
To provide an anchor structure using an anticorrosive PC steel stranded wire having excellent durability and achieving excellent workability in construction and to provide a construction method for the anchor structure. This anchor struc...  
JP2013159944A
To provide an erosion control dam for which a gravel temporarily storing function and drift wood capturing ability of a slit type erosion control dam are improved and a disaster prevention function is improved.On an upstream side front s...  
JP2013155553A
To provide a waterproof plate device in which certainty in operation of a waterproof plate can be improved.A waterproof plate device comprises a waterproof plate 16, a groove-shaped waterproof plate accommodation pit 14, a groove-shaped ...  
JP2013155527A
To provide a cut-off technology which enables a cofferdam structure to be water-tightly installed corresponding to unevenness of a surface of a dam body.In steps to be carried out, a dome body 10 is arranged on a door stop 13 for receivi...  
JP2013532242A
The frame which has at least one joist prolonged in the passage which can be stopped to water boundary attachment る, two pillars, and in the meantime, It is a waterproofing barrier including the transportation device for moving a flexi...  
JP5254944B2  
JP5258692B2  

Matches 801 - 850 out of 14,055